NERC

Liberty University

Here are the best resources to pass NERC. Find NERC study guides, notes, assignments, and much more.

Page 2 out of 27 results

Sort by

NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS
  • NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 4 pages • 2022
  • Available in package deal
  • System studies identify what correct answer: Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? correct answer: Someone lost load When a generator has its AVR in service it is a? correct answer: Dynamic source of reactive power Black start resource testing is done every? correct answer: 3 years Each BA shall operate its AGC on? correct answer: Tie line Frequency Bias When is voltage reduction reportable? correct answer...
    (0)
  • $5.49
  • 1x sold
  • + learn more
NERC Flashcards| 97 QUESTIONS| WITH COMPLETE SOLUTIONS
  • NERC Flashcards| 97 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 5 pages • 2022
  • Available in package deal
  • EDE - Energy Deficient Entity Ime - meter error DCS - Disturbance Control Standard DFRs - Digital Fault Recorder LOFT - Linear on the fly testing SCADA - Supervisory Control and Data Acquisition EMS - Emergency Management System SPS - Special Protection Systems ACE - Area Control Error Fs - frequency Schedule RCIS - Reliability Coordinator Information System IDC - Interchange Distribution Calculator PSE - Purchasing Selling Entity NOAA - National Oceanic At...
    (0)
  • $5.49
  • + learn more
NERC-CIP v5 Standards
  • NERC-CIP v5 Standards

  • Exam (elaborations) • 3 pages • 2022
  • Available in package deal
  • CIP-002 correct answer: BES Cyber System Categorization CIP-003 correct answer: Security Management Controls CIP-004 correct answer: Personnel and Training CIP-005 correct answer: Electronic Security Perimeter CIP-006 correct answer: Physical Security of BES Cyber Systems CIP-007 correct answer: System Security Management CIP-008 correct answer: Incident Reporting and Response Planning CIP-009 correct answer: Recovery Plan for BES Cyber Systems CIP-010 correct ans...
    (0)
  • $4.49
  • + learn more
Nerc Test| 88 QUESTIONS| WITH COMPLETE SOLUTIONS
  • Nerc Test| 88 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 6 pages • 2022
  • Available in package deal
  • According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ correct answer: 60 minutes A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days correct answer: 2 business days During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity correct answer: 5% What are the two components that a system operator ...
    (0)
  • $8.49
  • + learn more
NERC TOP System Operations| 74 QUESTIONS| WITH COMPLETE SOLUTIONS
  • NERC TOP System Operations| 74 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 14 pages • 2022
  • Available in package deal
  • At what torque angle of operation does power typically begin to flow from the generator to the system? A) 90 degrees B) 60 degrees C) 30 degrees D) 10 degrees correct answer: 10 degrees Choose the answer that best describes the operation of a rotor. A) The stationary part of the transmission system. B) A type of superconductor. C) The stationary element of a generator that has its windings connected to the system. D) The excited (energized) field winding that rotates inside the...
    (0)
  • $10.49
  • + learn more
My NERC TEST 1| 125 QUESTIONS| WITH COMPLETE SOLUTIONS
  • My NERC TEST 1| 125 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 13 pages • 2022
  • Available in package deal
  • A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
    (0)
  • $10.49
  • + learn more
NERC Pre test| 83 QUESTIONS| WITH COMPLETE SOLUTIONS
  • NERC Pre test| 83 QUESTIONS| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 6 pages • 2022
  • Available in package deal
  • component of an electrical power system that can function as a motor or as a VAR generator is called a: correct answer: Synchronous condenser What are examples of measuring devices in system protection? correct answer: Current transformers, potential transformers, coupling capacitance voltage transformers. If the load on a three phase system is balanced equally among the phases, how much current will flow on the neutral point? correct answer: neutral current will be zero What are the...
    (0)
  • $8.49
  • + learn more
NERC SOS quiz| 326 questions| WITH COMPLETE SOLUTIONS
  • NERC SOS quiz| 326 questions| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 32 pages • 2022
  • Available in package deal
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? correct answer: Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection correct answer: Burden A Balancing Authority...
    (0)
  • $12.49
  • + learn more
NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS
  • NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 16 pages • 2022
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? correct answer: 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? correct answer: Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? correct answer: Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? correct answe...
    (0)
  • $12.49
  • + learn more
Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS| 52 PAGES (WITH COMPLETE SOLUTIONS)
  • Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS| 52 PAGES (WITH COMPLETE SOLUTIONS)

  • Exam (elaborations) • 52 pages • 2022
  • Available in package deal
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% correct answer: B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators correct ans...
    (0)
  • $12.49
  • 1x sold
  • + learn more