- Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 35 study documents about .

All 35 results

Sort by

VA CONTRACTORS LICENSE EXAM CLASS A OR B  QUESTION BANK | 2025 CURRENTLY TESTING  ACCURATE REAL EXAM QUESTIONS WITH  DETAILED VERIFIED ANSWERS GRADED A+ |  GUARANTEED EXCELLENCE PASS
  • VA CONTRACTORS LICENSE EXAM CLASS A OR B QUESTION BANK | 2025 CURRENTLY TESTING ACCURATE REAL EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS GRADED A+ | GUARANTEED EXCELLENCE PASS

  • Exam (elaborations) • 40 pages • 2025
  • VA CONTRACTORS LICENSE EXAM CLASS A OR B QUESTION BANK | 2025 CURRENTLY TESTING ACCURATE REAL EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS GRADED A+ | GUARANTEED EXCELLENCE PASS
  • TotalScores
    (0)
  • $24.99
  • + learn more
 VA Contractors License AVAC Questions Correctly Solved
  • VA Contractors License AVAC Questions Correctly Solved

  • Exam (elaborations) • 22 pages • 2025
  • Available in package deal
  • Who bears liability for all actions taken by the business in a sole proprietorship? - You bear personal liability for all actions undertaken in the name of the business What is an advantage of a sole proprietorship? - Freedom in decision-making process What is a disadvantage of a sole proprietorship? Unlimited personal ability, multiple decision makers In a general partnership, who has liability for all debts? - All owners in a general partnership have personal and unlimited liabilit...
  • kharowl
    (0)
  • $12.99
  • + learn more
 VA Contractors License Study Guide Questions Correctly Solved
  • VA Contractors License Study Guide Questions Correctly Solved

  • Exam (elaborations) • 6 pages • 2025
  • Available in package deal
  • Disturbed land areas of less than _____ square feet in size may not be an issue of erosion and sediment control. A) 20,000 B) 45,000 C) 10,000 D) 1,500 - 10,000 Which of the following is permitted to receive awards from the Fund? A) Financial or lending institution involved in real estate B) Employee of debtor C) Property owner D) Child of debtor - property owner The board can refuse to renew a license when the principal owner is a former owner or officer of a firm that ...
  • kharowl
    (0)
  • $10.39
  • + learn more
  VA Contractors License Review Questions with Right Answers
  • VA Contractors License Review Questions with Right Answers

  • Exam (elaborations) • 8 pages • 2025
  • Available in package deal
  • When may a license be transferred? - Never What code is followed for new additions to a building? - Current code What is calculated in project overhead? - Supervisor salaries Lead Exposure - 1978 Miller Act - 1 Year Working Capital - current assets - current liabilities Bid Price - (Dir Cost * 100) / (100-%) Equity - Assets - Liabilities A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when...
  • kharowl
    (0)
  • $9.89
  • + learn more
 Va Contractors License Exam Correctly Answered
  • Va Contractors License Exam Correctly Answered

  • Exam (elaborations) • 16 pages • 2025
  • Available in package deal
  • What is the range of slump for concrete used in the wall? - 4 inches minimum 8 inches max What is the most common cause of injury on a construction site? - Falls In how many hours must a fatality be reported to OSHA? - Within 8 hours What is the maximum time between mixing and using water above 80°? - 2 1/2 hours What plan would show the building lot with boundaries? - Site plans What is the maximum riser height and minimum tread depth for stairway built in Virginia? - 8 1/...
  • kharowl
    (0)
  • $10.99
  • + learn more
Va Contractors License || with 100% Error-free Solutions.
  • Va Contractors License || with 100% Error-free Solutions.

  • Exam (elaborations) • 9 pages • 2025
  • What is the minimum distance from exposed ground for a wood framing member that is in contact with?? correct answers 24 inches What is the maximum allowed slope for the top surface of a footing? correct answers None Where should a drip edge be used? correct answers Beneath the underlayment What is the minimum height for guard rails for balcony? correct answers 36 inches What test is performed to determine the drainage capacity of a soil? correct answers Perculation test- Perc Test ...
  • FullyFocus
    (0)
  • $11.29
  • + learn more
Va Contractors License Exam Questions Fully Solved Latest Update 2025 Already Passed
  • Va Contractors License Exam Questions Fully Solved Latest Update 2025 Already Passed

  • Exam (elaborations) • 8 pages • 2025
  • Va Contractors License Exam Questions Fully Solved Latest Update 2025 Already Passed What is the minimum distance from exposed ground for a wood framing member that is in contact with?? - Answers 24 inches What is the maximum allowed slope for the top surface of a footing? - Answers None Where should a drip edge be used? - Answers Beneath the underlayment What is the minimum height for guard rails for balcony? - Answers 36 inches What test is performed to determine the drainage capacity of...
  • TutorJosh
    (0)
  • $9.99
  • + learn more
VA Contractors License General B Trade Practice Exam #2
  • VA Contractors License General B Trade Practice Exam #2

  • Exam (elaborations) • 7 pages • 2024
  • Contractors License General B Trade Practice Exam #2
  • CLOUND
    (0)
  • $11.49
  • + learn more
VA CONTRACTORS LICENSE QUESTIONS AND ANSWERS
  • VA CONTRACTORS LICENSE QUESTIONS AND ANSWERS

  • Exam (elaborations) • 12 pages • 2024
  • VA CONTRACTORS LICENSE QUESTIONS AND ANSWERS
  • GEEKA
    (0)
  • $12.49
  • + learn more
Va Contractors License exam with correct answers
  • Va Contractors License exam with correct answers

  • Exam (elaborations) • 13 pages • 2024
  • Va Contractors License exam with correct answers
  • Lectphilip
    (0)
  • $11.99
  • + learn more