Aia document - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aia document? On this page you'll find 173 study documents about Aia document.

Page 2 out of 173 results

Sort by

CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $15.49
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
AIA contract document A201 - Study Set
  • AIA contract document A201 - Study Set

  • Exam (elaborations) • 18 pages • 2024
  • AIA contract document A201 - Study Set A201 covers what information? - General conditions of the contract for construction. According to section 1.1.1 what are acceptable modifications to the contract issued after execution? - 1) A written amendment to the contract signed by both parties 2) A change order 3) A construction change directive 4) A written order for a minor change in work issued by the architect. What items do the contract documents not include? - Advertisement or inv...
    (0)
  • $9.99
  • + learn more
CNST 2341 fInal  Questions With 100% Correct Answers!!
  • CNST 2341 fInal Questions With 100% Correct Answers!!

  • Exam (elaborations) • 37 pages • 2024
  • Available in package deal
  • `serve as one point of responsibility to who? - the owner `The 3 method of payment are ? - 1. Lump Sum 2. Unit price 3. Cost Plus `total float or simply "float" is also referred to as a what - "slack" `With OCIPs and CCIPs the disadvantages of the programs includes what? - increased administration burden by the owner or contractor `With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must what? - Be paid for with private the owner. A certifi...
    (0)
  • $7.99
  • + learn more
CONS LAW Exam Questions with Correct Answers
  • CONS LAW Exam Questions with Correct Answers

  • Exam (elaborations) • 26 pages • 2024
  • Available in package deal
  • CONS LAW Exam Questions with Correct Answers Which group does not have their own standard form construction contracts? A. American Institute of Architects (AIA) B. Associated General Contractors of America (AGC) C. American Institute of Constructions (AIC) D. The Engineers Joint Contract Documents Committee (EJCDC) - Answer-American Institute of Constructions (AIC) A contract ______________________ . (Select one) A. cannot be formed by actions alone B. must be a written document ...
    (0)
  • $13.39
  • + learn more
ARE Practice Exam 1 Questions & Answers 2024/2025
  • ARE Practice Exam 1 Questions & Answers 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • ARE Practice Exam 1 Questions & Answers 2024/2025 What are the four reasons an architect should consider professional liability insurance? - ANSWERS1. Social Responsibility, 2. Continuing Operations, 3. Contract Requirements, 4. Business Survival During the building of a pre-school and day care facility, the general contractor ran over the allotted schedule which interrupted the client's intention to be up and running before the beginning of the school year. The contractor is claiming t...
    (0)
  • $8.49
  • + learn more
USPTO || A+ Graded Already.
  • USPTO || A+ Graded Already.

  • Exam (elaborations) • 26 pages • 2024
  • Access correct answers The general rule is that both unpublished pending and abandoned applications are maintained in confidence by the PTO, an access and copies can be had only for certain exceptions. Normal access: Inventors, Assignee, exclusive licensee, attorney or agent of record., any person with written authorization from inventor/attorney/ assignee. Exceptions: 1) An interference file is available if the interference has been terminated or an award for priority has been made. ...
    (0)
  • $13.39
  • + learn more
NCARB practice Study Questions with Answers
  • NCARB practice Study Questions with Answers

  • Exam (elaborations) • 14 pages • 2024
  • The contractor is required to replace the lighting fixtures wiht the fixtures specified without remibursement - Answer A contractor under a fixed-price construction contract has allowed the electrical subcontractor to install lighting fixtures other than those stated in the contract documents. The electrical subcontractor and the contractor both believe the substituted fixtures to be of equal value. The construction is substantially completed and the architect rejects these fixtures. Accord...
    (0)
  • $12.99
  • + learn more
AIA contract document A201 - Study Set Exam 2023-2024
  • AIA contract document A201 - Study Set Exam 2023-2024

  • Exam (elaborations) • 13 pages • 2023
  • AIA contract document A201 - Study Set Exam ...
    (0)
  • $9.49
  • + learn more