CM 4100 Assignments Questions And Answers 2024 (Pass!)
- Exam (elaborations) • 11 pages • 2024
-
- $14.49
- + learn more
CM 4100 Assignments Questions And Answers 2024 (Pass!) 
A significant difference between "planning" and "scheduling" is, 
Select one: 
Scheduling determines what is going to be done, and planning determines how to do. 
Scheduling determines how to do, and planning determines what to do. 
Scheduling determines when to do, and planning determines what to do, how to do and by whom. - 
ANS-Scheduling determines when to do, and planning determines what to do, how to do and by 
whom. 
What is not...
-
CM 4101 Final Exam | With 100% Correct Answers, Graded A
- Exam (elaborations) • 7 pages • 2024
-
- $15.99
- + learn more
CM 4101 Final Exam | With 100% Correct Answers, Graded A During which of the following process, questions such as what activities should be scheduled are typically asked and answered? a. Planning b. Scheduling c. Control Using traditional bar charts, it is always easy to tell the logic relationships between activities. a. True b. False An event consumes a. Resources b. Time c. Both Resources and Time d. Neither resources nor time Which of the following is correct regarding CPM and PERT? a. The...
-
CM 4101 final Exam Questions Solved 100% Correct
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
work breakdown structure - Answer a _______ provides a framework for breaking a 
project down into successively greater detail by level and organizing activities that make 
up a project 
sequencing, scheduling - Answer a WBS organizes the work of a project but does not 
address the _____ and the _____ of project activities
-
CM 4101 final Exam Questions Solved 100% Correct
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
What is not true about classic bar charts? 
a. Bar charts use a time-scaled presentation 
b. Bar charts often directly show resource consumption of each activity 
c. Bar charts can show the relative of each activity 
d. Bar charts cannot show the actual status of a project - Answer b. Bar charts often 
directly show resource consumption of each activity 
c. Bar charts can show the relative of each activity
-
LSU CM 4100 Construction Scheduling and Cost Control quiz 5 Louisiana State University
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
LSU CM 4100 Construction Scheduling and Cost Control quiz 5 Louisiana State University
Get paid weekly? You can!
-
CM 4100 Assignments Questions Solved 100% Correct
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $12.74
- + learn more
The conditions of limited resource availability dictate certain activities cannot be 
performed simultaneously. This is, 
Select one: 
a. Physical constraints 
b. Resource constraints 
c. Safety constraints 
d. Contractual constraints - Answer Resource constraints
-
LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers 2024-2025 Louisiana State University
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers Louisiana State University
-
CM 4100 Assignments with Questions and Answers 100% Correct
- Exam (elaborations) • 7 pages • 2024
-
- $14.99
- + learn more
CM 4100 Assignments with Questions and Answers 100% Correct 
A precedence diagram uses nodes to represent 
Select one: 
a.	Activities 
b.	Activity links 
c.	Resources 
d.	Time - CORRECT ANSWER-Activities 
A significant difference between "planning" and "scheduling" is, 
Select one: 
Scheduling determines what is going to be done, and planning determines how to do. 
Scheduling determines how to do, and planning determines what to do. 
Scheduling determines when to do, and planning determines ...
-
CM 410 Final Exam Questions & Answers 100% Correct
- Exam (elaborations) • 8 pages • 2024
-
- $11.99
- + learn more
5 types of bonds* - ANSWERBid bond 
Performance bond 
Payment bond 
Warranty bond 
Green bond 
 
*A101* - ANSWERLUMP sum contract 
 
*A111* - ANSWERCOST OF THE WORK PLUS FEE 
 
*A121 CMc* - ANSWERCM @ Risk 
 
*A131 CMc* - ANSWERCM @ Management 
 
A141 - ANSWERDesign-build 
 
*A201* - ANSWERGeneral Conditions 
 
A401 - ANSWERAgreement between contractor and sub 
 
All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. 
Cover...
-
Study set for CM 4101 Final Exam Review Questions and Answers 2024/2025
- Exam (elaborations) • 8 pages • 2024
-
- $13.49
- + learn more
Study set for CM 4101 Final Exam 
Review Questions and Answers 
2024/2025 
Construction Planning - CORRECT ANSWER-The process of determining how a project will be carried out. Planning answers questions: who? what? where?, and how? 
Construction Scheduling - CORRECT ANSWER-Process to determine when activities need to be started and completed. Answers the question: when? 
Project Control - CORRECT ANSWER-Is an active process to monitor and update the construction plan and the schedule. 