Design bid build - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Design bid build? On this page you'll find 601 study documents about Design bid build.

Page 2 out of 601 results

Sort by

AFSB 152 - The Institutes Practice Exam Questions and Answers 2023
  • AFSB 152 - The Institutes Practice Exam Questions and Answers 2023

  • Exam (elaborations) • 24 pages • 2023
  • Available in package deal
  • AFSB 152 - The Institutes Practice Exam Questions and Answers 2023 Lansing Construction Company completed major jobs including road grading, bridges, and base and paving work. Which one of the following types of contractors is Lansing? • Heavy and highway construction • General Engineering contractor • General Building contractor • Design/build contractor - Correct Answer-Heavy and highway construction The project owner for a new shopping plaza being built in Highville is the Hig...
    (0)
  • $20.99
  • 1x sold
  • + learn more
ARC Study Final Exam 2 Questions & Answers 2024/2025
  • ARC Study Final Exam 2 Questions & Answers 2024/2025

  • Exam (elaborations) • 40 pages • 2024
  • Available in package deal
  • ARC Study Final Exam 2 Questions & Answers 2024/2025 What kinds of documents will an architect be approving during Contract Administration? Shop Drawings Specifications Product Samples RFIs - ANSWERSRFIs What step is NOT part of the programming process? Formulating Relationships Collecting Data Establishing Goals Making Assumptions - ANSWERSMaking Assumptions What is the traditional way of delivering a project? Fast-Tracking Design-Build Design-Bid-Build Construction...
    (0)
  • $11.49
  • + learn more
QABA Exam practice questions taken from Relias training_2023_ANSWRED WITH FEEDBACKS.
  • QABA Exam practice questions taken from Relias training_2023_ANSWRED WITH FEEDBACKS.

  • Exam (elaborations) • 22 pages • 2022
  • QABA Exam practice questions taken from Relias training_2023. *If you have an individual who engages in escape behaviors you should:* A. Alternate antecedent interventions daily to see which ones are the most effective. B. Provide all antecedent interventions that can prevent escape. C. Tailor antecedent interventions to the person you support based on data from the FBA. D. Choose 3 antecedent interventions for escape maintained behaviors *After cleaning up a work area contaminated wi...
    (1)
  • $12.09
  • 8x sold
  • + learn more
CNST 2341 Final || Questions and 100% Verified Answers.
  • CNST 2341 Final || Questions and 100% Verified Answers.

  • Exam (elaborations) • 26 pages • 2024
  • Available in package deal
  • AIA 201 3.18 Indemnification 3.18.1 correct answers Contractor shall hold the owner not liable for any harm done by him and shall compensate for any harm loss arising out of or resulting from any extent caused by the neglect or omission of the Contractor or any representative for the contractor is held liable. AIA 201 3.18 Indemnification 3.18.2 correct answers The person at fault from the contractors or subcontractors side has a claim on them then, they are liable to the indemn...
    (0)
  • $12.99
  • + learn more
Building Tech Latest Update Graded A+
  • Building Tech Latest Update Graded A+

  • Exam (elaborations) • 221 pages • 2024
  • Available in package deal
  • Building Tech Latest Update Graded A+ What is thermal bridging? Thermal bridging occurs when a material with high thermal conductivity creates a path for heat flow across a thermal barrier, reducing insulation effectiveness. What does “constructability” refer to? Constructability refers to the ease and efficiency with which a building design can be constructed, taking into account construction methods and materials. What is the purpose of a riser in construction? A riser is a v...
    (0)
  • $15.49
  • + learn more
COSC 275 Exam 2 (Palmer) Questions with Correct Answers
  • COSC 275 Exam 2 (Palmer) Questions with Correct Answers

  • Exam (elaborations) • 11 pages • 2024
  • Hard bid low price Correct Answer-Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Correct Answer-Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR Correct Answer-Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. Design Build Correct Answer-Only one co...
    (0)
  • $12.99
  • + learn more
COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.
  • COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • A _____________________ code requirement contains detailed information, is simpler to implement, and provides certainty for designers and builders. descriptive prescriptive performance functioning correct answers prescriptive Which statement below is correct regarding the construction manager project delivery method? It is best suited for simple, straight forward projects The CM is involved in the project prior to construction The CM has very limited influence on the project It elimin...
    (0)
  • $12.79
  • + learn more
Exam 1- CNST 379 || All Questions Answered Correctly.
  • Exam 1- CNST 379 || All Questions Answered Correctly.

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • UNL's new College of Engineering Building (Kiewit Hall) uses which of the following project delivery methods? a. CMar b. design/build c. IPD d. P3 e. Design-Bid-Build correct answers a. CMar It is usually easy for a general contractor to obtain private bid opportunities than it is to obtain public bid opportunities. True or False correct answers false An RFP, will typically contain which of the following: (Select all that apply) -Type of owner contract to be used -Anticipated ...
    (0)
  • $11.99
  • + learn more
BOMI - Design and Op I Key Concepts Chapters 1-8 Questions And Answers With Verified Solutions
  • BOMI - Design and Op I Key Concepts Chapters 1-8 Questions And Answers With Verified Solutions

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • 0-20 DB Sound Level - Loudness: Very Faint Source: Whisper (5) 100-200 DB Sound Level - Loudness: Deafening Source: Generator (5) 20-40 DB Sound Level - Loudness: Faint Source: Quiet Conversation (5) 4 Primary Project Delivery Methods - - Design Bid Build - Design Build - CMAR - Multiple Prime Contracts (2) 4 Types of Shifting - Settlement, Upheaval, Sliding, Liquefaction. (4) 40-60 DB Sound Level - Loudness: Moderate Source: Average Conversation (5) 60-80 DB Sound Level - Loudness:...
    (0)
  • $7.99
  • + learn more
FE CONCEPT QUESTIONS AND ANSWERS
  • FE CONCEPT QUESTIONS AND ANSWERS

  • Exam (elaborations) • 18 pages • 2024
  • which of the following is the Program Evaluation and Review Technique (PERT) used? - Answer-PERT is used to monitor the progress and predict the completion time for large projects. -construction projects -computer programming assignments -preparation of bids and proposals Which of the following duties would normally be a responsibility of the estimating department within a general contractor's organization? - Answer-The estimation process does not include tracking costs or recording actu...
    (0)
  • $12.59
  • + learn more