Final proprac - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Final proprac? On this page you'll find 14 study documents about Final proprac.
Page 2 out of 14 results
Sort by
-
PROPRAC REVIEWER|QUESTIONS WITH 100% CORRECT ANSWERS|VERIFIED
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
PROPRAC REVIEWER 
 
supervise the proper watering, pruning, trimming and maintenance of the landscape ANSWER- The following are the tasks of a Resident/ in-house Architect who is tasked to maintain the building's welfare EXCEPT: 
 
Project Manager ANSWER- What is the position of the head leading the Comprehensive Architectural Services? 
 
This is inefficient because it does allow planning ahead of the requirement. ANSWER- Prior to the start oof the residential construction, the foreman asked t...
-
Construction Documents
- Package deal • 6 items • 2023
-
- $22.79
- + learn more
Construction Contracts Midterm Study Guide (A+ Graded already)
Specifications - Final Exam (100% correct answers)
Construction Documents Exam 2 (with complete solutions)
CDT Key Terms (A+ Graded already)
CSI CDT Exam (with 100% correct answers)
Proprac Exam (with complete solutions)

-
ProPrac Final Exam Graded A+
- Exam (elaborations) • 6 pages • 2023
-
- $10.49
- + learn more
Insomnia - ANSWER-difficulty falling asleep, staying asleep, waking too early, or feeling unrefreshed 
 
What are some things to avoid prior to going to sleep? - ANSWER-Avoid alcohol, nicotine, caffeine at least 4-6 hours before bedtime 
Avoid strenuous exercise 
Eating large meals or going to bed hungry 
Limit naps to 15-20 minutes 
Get into bed only when sleepy 
 
Mallampati Score - ANSWER-assesses airway size, the higher the number the increased risk for sleep apnea and reduced ease for intub...
-
ProPrac Test 2 | updated questions and answers 2023/24
- Exam (elaborations) • 5 pages • 2023
-
- $9.99
- + learn more
ProPrac Test 2 | updated questions and answers 2023/24 
 
In which project specification division would you expect to find windows: - 08 
In which project specification division would you expect to find structural steel: - 05 
The Architect's responsibility in review of a submittal provides for the following: - Limited checking for conformance with the contract documents 
Which is not a responsibility of the architect during the Construction phase: - Establish means and methods 
In whic...
Too much month left at the end of the money?
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia