First class steam license - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about First class steam license? On this page you'll find 78 study documents about First class steam license.
Page 2 out of 78 results
Sort by
-
MN SPECIAL BOILERS LICENSE PREP TEST
- Exam (elaborations) • 13 pages • 2024
-
- $12.49
- + learn more
Special (License Grade) - Answer-Work in any type of plant 
 
Grade C (License Grade) - Answer-Can operate low-pressure steam or hot water (no steam engines/turbines) 
 
Grade B (License Grade) - Answer-Can operate high-pressure or low-pressure steam or hot water (no steam engines/turbines) 
 
Grade A (License Grade) - Answer-Can operate any plant including plants with steam engines/turbines 
 
Special (License Class) - Answer-Take Charge (max 50 hpr) 
Shift Engineer (max 100 hpr) 
 
2nd Class (...
-
3rd class stationary steam engineer license prep questions and answers rated A+
- Exam (elaborations) • 35 pages • 2024
-
- $10.49
- + learn more
3rd class stationary steam engineer 
license prep questions and answers 
 
rated A+ 
 
_________ are necessary for complete combustion time, temperature, mixture, and 
atomization 
 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ 214.7 
 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The 
blowdown is______psi 12 
 
an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo- 
generat...
-
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers.
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers. 
_________ are necessary for complete combustion - Answer<>time, temperature, 
mixture, and atomization 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 
Answer<>214.7 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 
398 PSI. The blowdown is______psi - Answer<>12 
an oil cooler is commonly used with a(n) ________ when operatin...
-
3rd Class Stationary Steam Engineer License Prep
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
3rd Class Stationary Steam Engineer 
 
License Prep 
 
________ are necessary for complete combustion - time, temperature, mixture, and 
atomization 
 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 214.7 
 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The 
blowdown is______psi - 12 
 
an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo- 
generator - steam turbine 
 
a boi...
-
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers.
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers. 
____ are necessary for complete combustion - Answer<>time, temperature, 
mixture, and atomization 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 
Answer<>214.7 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 
398 PSI. The blowdown is______psi - Answer<>12 
an oil cooler is commonly used with a(n) ________ when operating in ...
And that's how you make extra money
-
3rd Class Stationary Steam Engineer License Prep - Complete Solutions (Answered)
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
3rd Class Stationary Steam Engineer License Prep - Complete Solutions (Answered) __________ steam turbines allow condensate to be reclaimed for use in the system Condensing With water at a temperature of 212°f, 1 bhp is equivalent to the evaporation of 34.5 lb of water every ________ hour(s) 1 In a closed feedwater heater, the _________ Steam and water do not mix Sensible heat is heat that ______ changes the temperature of a substance but not its state When performing a hydrostatic test on a ...
-
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers.
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
3rd Class Stationary Steam Engineer License Prep Exam 2024 Questions and Answers. 
are necessary for complete combustion - Answer<>time, temperature, 
mixture, and atomization 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 
Answer<>214.7 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 
398 PSI. The blowdown is______psi - Answer<>12 
an oil cooler is commonly used with a(n) ________ when operating in conju...
-
3rd class stationary steam engineer license prep Questions and Answers 100% Pass
- Exam (elaborations) • 23 pages • 2024
-
- $12.49
- + learn more
3rd class stationary steam engineer license 
prep Questions and Answers 100% Pass 
_________ are necessary for complete combustion - Correct Answer ️️ -time, 
temperature, mixture, and atomization 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 
Correct Answer ️️ -214.7 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 
398 PSI. The blowdown is______psi - Correct Answer ️️ -12 
an oil cooler is commonly used with ...
-
Massachusetts Journeyman Pipefitter Exam (Heating, Cooling) PJ-01 Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $10.09
- 1x sold
- + learn more
1/2" - ANSWER-Sight Glass Minimum Connection 
 
3/4" - ANSWER-Low Water Cut-off Draw Minimum Connection 
 
1" - ANSWER-Water Column Minimum Connection 
 
3/4" - ANSWER-Control Manifold Minimum Connection 
 
1/4" - ANSWER-Sight Glass Drain Minimum Connection 
 
1" - ANSWER-Bottom Blow-Off Minimum Connection 
 
2 1/2" - ANSWER-Bottom Blow-Off Maximum Connection 
 
2 1/2" - ANSWER-Surface Blow-Down Maximum Connection 
 
3" - ANSWER-Threaded Safety Valve Maximum Connection 
 
4 1/2" - ANSW...
-
3rd class stationary steam engineer license prep questions with 100% verified answers
- Exam (elaborations) • 21 pages • 2024
-
- $10.99
- + learn more
3rd class stationary ste 
am engineer license prep questions with 100% verified answers 
_________ are necessary for complete combustion -Correct Answer-time, temperature, mixture, and atomization 
 
if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ -Correct Answer-214.7 
 
a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The blowdown is______psi -Correct Answer-12 
 
an oil cooler is commonly used with a(n) ________ when...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia