Gcor - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Gcor? On this page you'll find 198 study documents about Gcor.
Page 2 out of 198 results
Sort by
-
GCOR UPDATED Exam Questions and CORRECT Answers
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
GCOR UPDATED Exam Questions and 
CORRECT Answers 
Dual Control Switch - Ans A power operated switch, movable point frog, or derail that can 
also be operated by hand. 
Electric Switch Lock - Ans An electrically controlled lock that restricts the use of a hand 
operated switch or derail. 
Absolute Signal - Ans A block or interlocking signal without a number plate or designated by 
an A marker.
-
BNSF GCOR Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
BNSF GCOR Exam Questions | 100% Correct 
Answers | Verified | Latest 2024 Version
-
GCOR Review 173 Questions with Complete Solutions 100% Verified 2024/2025
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
GCOR Review 173 Questions with Complete Solutions 100% Verified 2024/2025 
List the duties of a Train Dispatcher. (5 items) 
20.2 - Correct Answers 1. Supervising the movement of trains 
2. Using proper protection and authorities for employees as prescribed by the rules. 
3. Complying with the rules and when observed requiring that other dispatchers do the same. 
4. Cooperating with field personnel conducting efficiency tests by not divulging any information that would interfere with or affect t...
-
BNSF GCOR FOR FINAL EXAM 2024 Questions with 100% Correct Answers | Updated | Download to score A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
BNSF GCOR FOR FINAL EXAM 2024 Questions with 100% Correct Answers | Updated | Download to score A+
-
BNSF GCOR FOR FINAL WITH COMPLETE SOLUTIONS | LATEST 2024/2025
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
BNSF GCOR FOR FINAL WITH COMPLETE SOLUTIONS | LATEST 2024/2025 
What is essential to job safety and continued employment? ️ Obeying 
the rules 
The right to challenge a directive which based on the employees good faith 
determination, would violate a railroad operating rule relating to; ️ 
Shoving movements, leaving equipment foul of an adjacent track or the 
handling of hand-operated swithches or fixed derails. 
A freight car with any defect that makes it unsafe for movement must be: 
️ C...
As you read this, a fellow student has made another $4.70
-
BNSF GCOR Exam Questions with Correct Answers
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
BNSF GCOR Exam Questions with Correct Answers 
 
What is the timetable direction when moving from MP 27.0 to Coal Jct. on the coal subdivision? - Answer-Westward. 
 
What is the length of the siding at Buddwood on the Woods subdivision? - Answer-8442 Feet. 
 
H & H Feed is a location not shown as a station on the Woods subdivision, what is the length of the track at H & H Feed? - Answer-763 Feet. 
 
What is the milepost location of Cutoff Jct. on the Coal subdivision? - Answer-21.6 
 
In the st...
-
GCOR Exam Questions and Answers Rated A
- Exam (elaborations) • 19 pages • 2024
-
- $15.49
- + learn more
GCOR Exam Questions and Answers 
Rated A
-
BNSF GCOR FOR FINAL EXAM QUESTIONS AND ANSWERS ALREADY PASSED
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
BNSF GCOR FOR FINAL EXAM 
QUESTIONS AND ANSWERS ALREADY 
 
PASSED 
 
What is essential to job safety and continued employment? Obeying the rules 
 
The right to challenge a directive which based on the employees good faith determination, would 
violate a railroad operating rule relating to; Shoving movements, leaving equipment foul of 
an adjacent track or the handling of hand-operated swithches or fixed derails. 
 
A freight car with any defect that makes it unsafe for movement must be: Correct...
-
GCOR PASSED Exam Questions and CORRECT Answers
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
GCOR PASSED Exam Questions and 
CORRECT Answers 
Controlled Signal - Ans Absolute signal controlled by a control operator 
Signal Indication - Ans The action required by the signal aspect. 
Main Track - Ans A track extending through yards and between stations that must not be 
occupied without authority or protection. 
Fixed Signal - Ans A signal that is fixed to a location permanently and that indicates a 
condition affecting train movement
-
GCOR Practice Test For Final Exam 155 Questions with Complete Solutions 100% Verified
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
GCOR Practice Test For Final Exam 155 Questions with Complete Solutions 100% Verified 
Dual Control Switch - Correct Answers A power operated switch, movable point frog, or derail that can also be operated by hand. 
 
Electric Switch Lock - Correct Answers An electrically controlled lock that restricts the use of a hand operated switch or derail. 
 
Absolute Signal - Correct Answers A block or interlocking signal without a number plate or designated by an A marker. 
 
Automatic Block System (ABS...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia