Masterformat - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Masterformat? On this page you'll find 180 study documents about Masterformat.

Page 2 out of 180 results

Sort by

COSC 275 EXAM 2 PALMER  QUESTIONS & ANSWERS SCORED A+ TO PASS!!
  • COSC 275 EXAM 2 PALMER QUESTIONS & ANSWERS SCORED A+ TO PASS!!

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Girder - Answer-A large principal beam of steel, reinforced concrete, wood, or a combination of these, used to support other structural members at isolated points along its length Anchor Bolt - Answer-A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or machinery Beam - Answer-A structural member that primarily resists loads applied laterally to the axis Column - Answer-A long, relatively slender, supporting pillar. A column is usually loaded axially in compr...
    (0)
  • $7.99
  • + learn more
Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution
  • Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution A cutaway view of a building or object is known as a(n)______. Sectional drawing What is the total connected load of Circuit A-1 if each of the Type C lighting fixtures in the figure above has a total lamp and ballast load of 150VA? 1,200VA In which division of the MasterFormat is electronic safety covered? Division 28 A section line on a drawing shows The location of the section on the plan On e...
    (1)
  • $11.49
  • 1x sold
  • + learn more
COSC 253 EXAM 2 (Simms) || All Correct.
  • COSC 253 EXAM 2 (Simms) || All Correct.

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • MasterFormat Division 6 correct answers Wood, Plastics, and Composites Tree Structure correct answers Bark: Outermost protective layer (A: dead, B: living) Cambium layer (C): Source of new cells Sapwood (D): Living cells that store and transport nutrients Heartwood (E): Dead cells that contribute to structural strength Pith (F): Innermost, first year's growth Annual growth rings (G): Result from differences in rate of tree growth and density of cells, from spring to summer Softwoods ...
    (0)
  • $11.09
  • + learn more
COSC 253 - Concrete - Exam 1 || Already Graded A+.
  • COSC 253 - Concrete - Exam 1 || Already Graded A+.

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • Concrete Timeline correct answers 1. *200BC-100AD*: Romans 2. *1824*: Portland Cement 3. *1850s*:Reinforcement 4. *1872*: Portland Cement comes to US 5. *1920s*: Pre-stressing Concrete Who invented concrete? correct answers The Romans The Romans correct answers • used longer spans in sitecast concrete • the Pantheon built by the Romans around 50AD had a concrete dome that spans 150 feet. • Longer spans in concrete are achieved by using very thin layers What is meant by "spa...
    (0)
  • $12.89
  • + learn more
CDT exam Questions with Correct  Answers (solved)
  • CDT exam Questions with Correct Answers (solved)

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • CDT exam Questions with Correct Answers (solved) 1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: a) Agreement. b) Conditions of the Contract. c) Division 01. d) Instructions to Bidders. - CORRECT ANSWER-b) Conditions of the Contract. 2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c) Specifications. d) Summary of Work. - CORRECT AN...
    (0)
  • $15.49
  • + learn more
CSI CDT Exam Questions 2024 Marking Scheme 100% Verified
  • CSI CDT Exam Questions 2024 Marking Scheme 100% Verified

  • Exam (elaborations) • 12 pages • 2024
  • CSI CDT Exam Questions 2024 Marking Scheme 100% Verified In a Design/Build project, there is a contractual relationship established between: - Answer -The Owner and single party, Typically a Contractor associated with an A/EnnnFF 040 For the Public sector, Which method is normally followed for the award of a contract? - Answer -Competitive Bidding nnFF 040 The Construction Manager is normally hired by? - Answer -The Owner nnFF 040 The form of contract usually most dif...
    (0)
  • $12.89
  • + learn more
CDT Exam Practice Questions With 100% Correct Answers
  • CDT Exam Practice Questions With 100% Correct Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • CDT Exam Practice Questions With 100% Correct Answers What are the four project teams? a. Owner, Facilities, Architect, CM/A b. Contractor, Supplier, AHJ, A/E c. Owner, Design, Contractor, Supplier d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier What are the Stages of the Facility Life Cycle? a. Project Conception, Design, Procurement, Construction b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility Management ...
    (0)
  • $13.49
  • + learn more
FE CONCEPT QUESTIONS AND ANSWERS
  • FE CONCEPT QUESTIONS AND ANSWERS

  • Exam (elaborations) • 18 pages • 2024
  • which of the following is the Program Evaluation and Review Technique (PERT) used? - Answer-PERT is used to monitor the progress and predict the completion time for large projects. -construction projects -computer programming assignments -preparation of bids and proposals Which of the following duties would normally be a responsibility of the estimating department within a general contractor's organization? - Answer-The estimation process does not include tracking costs or recording actu...
    (0)
  • $12.59
  • + learn more
CDT Exam Practice Questions With 100% Correct Answers
  • CDT Exam Practice Questions With 100% Correct Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • CDT Exam Practice Questions With 100% Correct Answers What are the four project teams? a. Owner, Facilities, Architect, CM/A b. Contractor, Supplier, AHJ, A/E c. Owner, Design, Contractor, Supplier d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier What are the Stages of the Facility Life Cycle? a. Project Conception, Design, Procurement, Construction b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility Management ...
    (0)
  • $13.49
  • + learn more
COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.
  • COSC 253 FINAL EXAM REVIEW || WITH 100% VERIFIED SOLUTIONS.

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • A _____________________ code requirement contains detailed information, is simpler to implement, and provides certainty for designers and builders. descriptive prescriptive performance functioning correct answers prescriptive Which statement below is correct regarding the construction manager project delivery method? It is best suited for simple, straight forward projects The CM is involved in the project prior to construction The CM has very limited influence on the project It elimin...
    (0)
  • $12.79
  • + learn more