NCCER Module 2 Exam Questions and Answers 100% pass
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCER Module 2 Exam Questions and Answers 100% pass 
An estimator is preparing a bid for a home remodeling project. She has determined that 
the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and 
the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be 
needed? - Answer- 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based 
an estimate of 850 hours of a journey-level plumber's time on the job....
-
NCCER Module 2 Review Questions and Answers with Complete Solutions 100% Correct | Latest Update 2024
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
NCCER Module 2 Review Questions and Answers with Complete Solutions 100% Correct | Latest Update 2024
-
NCCER Module 2 Questions and Answers 100% Pass
- Exam (elaborations) • 22 pages • 2024
-
- $13.48
- + learn more
NCCER Module 2 Questions and Answers 100% Pass
-
NCCER Module 2 Questions and Answers 100% Pass
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $13.48
- + learn more
An estimator is preparing a bid for a home remodeling project. She has determined that the new garage 
needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room 
needs 283 feet. How many feet of 2x10 lumber will be needed? - 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 
850 hours of a journey-level plumber's time on the job. After the job was in progress, the contractor 
determined tha...
-
NCCER Electrical Module 2 Level 2 exam 2023 with 100% correct answers
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $17.49
- 3x sold
- + learn more
How DC motors operate? - correct answer -Magnetic lines of force are continuous and always form closed loops; Magnetic lines of force do not cross. 
 
Armature: (Definition) - correct answer -The rotating windings of a DC motor. 
 
The ____ is a movable electromagnet located between the poles of another fixed permanent (field) magnet as shown. - correct answer -Armature 
 
A twisting force called ______ must be developed. _____ is produced by mounting a loop in a fixed magnetic field and as long...
Too much month left at the end of the money?
-
NCCER Module 2 Exam Questions and Answers 100% pass
- Exam (elaborations) • 23 pages • 2024
-
- $13.49
- + learn more
NCCER Module 2 Exam Questions and Answers 100% pass 
An estimator is preparing a bid for a home remodeling project. She has determined that 
the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and 
the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be 
needed? - Answer- 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based 
an estimate of 850 hours of a journey-level plumber's time on the job....
-
NCCER Module 2 Exam Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCER Module 2 Exam Questions with correct Answers 2024/2025( A+ GRADED 100% VERIFIED).
-
NCCER Module 2 (Math) Latest Questions With 100% Correct Solutions!!
- Exam (elaborations) • 47 pages • 2024
-
- $12.99
- + learn more
NCCER Module 2 (Math) Latest Questions With 100% Correct Solutions!!
-
NCCER Module 2 Review Questions & Answers, Graded A+[LATEST EXAM UPDATES]
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
NCCER Module 2 Review Questions & 
Answers, Graded A+ 
b. 2,689 - 1. The number matching the words "two thousand, six hundred eighty-nine" is 
a. 2,286 
b. 2,689 
c. 6,289 
d. 20,689 
a. 1,759 - 2. A bricklayer lays 649 bricks the first day, 
632 the second day, and 478 the third day. During the three-day period, the bricklayer laid a total of 
a. 1,759 
b. 1,760 
c. 1,769 
d. 1,770 
c. 989 - 3. A total of 1,478 feet of cable was supplied 
for a job. Only 489 feet were installed. How ...
-
NCCER Module 2 Questions and Answers 100% Pass
- Exam (elaborations) • 22 pages • 2024
-
- $13.48
- + learn more
An estimator is preparing a bid for a home remodeling project. She has determined that the new garage 
needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room 
needs 283 feet. How many feet of 2x10 lumber will be needed? - 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 
850 hours of a journey-level plumber's time on the job. After the job was in progress, the contractor 
determined tha...