Signal Person Training Course Study Guide Questions with complete solution 2023/2024
- Exam (elaborations) • 5 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
Signal Person Training Course Study Guide Questions with complete solution 2023/2024 
During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously 
 
If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements 
 
OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A 
 
According to ASME B30.5, prior to qualifying all signa...
-
Tower Crane Exam set 3 Questions with Correct Answers
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $13.39
- + learn more
A. by gradually increasing and decreasing speed Correct Answer How must tower crane movements be performed? 
A. by gradually increasing and decreasing speed 
B. as quick as the job dictates 
C. as slow as the job dictates 
D. at the speed designated by the site supervisor 
 
A. to limit side loading of the jib Correct Answer Why must the hoist line sheave be centered over the center of gravity of a load? 
A. to limit side loading of the jib 
B. to limit shock loading of the jib and tower assem...
-
Signal Person Training Course Study Guide question with verified solutions 2023/2024
- Exam (elaborations) • 5 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
Signal Person Training Course Study Guide. 
During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously 
 
If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements 
 
OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A 
 
According to ASME B30.5, prior to qualifying all signals persons must be tested by whom? - corre...
-
Nccco signal person test Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 8 pages • 2024
-
- $11.98
- + learn more
continuously during all crane movements, asme b30.5 states that communication shall be 
maintained 
stop crane movements if the communication is disrupted at any time while the crane is operation, 
the operator shall 
osha 1926.1400 appendix a OSHA's standard method crane hand signals would be located in the 
following 
designated person according to asme b30.5 prior to qualifying all signal persons they must be tested 
by? 
none what should be the response of the operator if the signal is not ...
-
Signal Person Training Course Study Guide Practice Test 2024.
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Signal Person Training Course Study Guide Practice Test 2024. 
During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously 
 
If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements 
 
OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A 
 
According to ASME B30.5, prior to qualifying all signals persons must be test...
As you read this, a fellow student has made another $4.70
-
Crane Signal Person Training Set One Correctly Answered Exam 2024.
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Crane Signal Person Training Set One Correctly Answered Exam 2024. 
During all crane movements, Asme B30.5 states that communication shall be maintained : - correct answer Continuously 
 
OSHA's standard method hand signals would be located in : - correct answer OSHA 1926.1400 Appendix A 
 
According to ASME B30.5 where must a hand signal chart be posted? - correct answer Posted conspicuously 
 
When using voice signals according to ASME B30.5, who must be present for the Pre-lift discussion? -...
-
Nccco signal person test 2023 with complete solutions
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
continuously correct answersduring all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements correct answersif the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a correct answersOSHA's standard method crane hand signals would be located in the following 
 
designated person correct answersaccording to asme b30.5 prior to qualifying all signal persons they must be tested by?
-
crane signal person training set one questions with answers rated A+
- Exam (elaborations) • 4 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
crane signal person training set oneDuring all crane movements, Asme B30.5 states that communication shall be maintained : - correct answer Continuously 
 
OSHA's standard method hand signals would be located in : - correct answer OSHA 1926.1400 Appendix A 
 
According to ASME B30.5 where must a hand signal chart be posted? - correct answer Posted conspicuously 
 
When using voice signals according to ASME B30.5, who must be present for the Pre-lift discussion? - correct answer Lift director, s...
-
NCCCO signal person test (with Complete Solutions)
- Exam (elaborations) • 5 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
continuously correct answers during all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements correct answers if the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a correct answers OSHA's standard method crane hand signals would be located in the following 
 
designated person correct answers according to asme b30.5 prior to qualifying all signal persons they must be tested by? 
 
no...
-
Nccco signal person test 2023 questions and 100% correct answers
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $14.89
- + learn more
continuously - correct answer during all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements - correct answer if the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a - correct answer OSHA's standard method crane hand signals would be located in the following 
 
designated person - correct answer according to asme b30.5 prior to qualifying all signal persons they must be tested by? 
...