3 strand rope - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about 3 strand rope? On this page you'll find 344 study documents about 3 strand rope.
Page 3 out of 344 results
Sort by
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANS c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - ANS a. 
 
3. The lo...
-
NCCCO CORE INCLUDING TABLES QUESTIONS AND ANSWERS WITH SOLUTIONS 2025
- Exam (elaborations) • 17 pages • 2024
-
- $14.99
- + learn more
TT 345-750V - ANSWER 16ft TT 
 
TA 500-750V - ANSWER 35ft TA 
 
TT 50-345V - ANSWER 10ft TT 
 
TA 750-1000V - ANSWER 45ft TA 
 
TA 50-200V - ANSWER 15ft TA 
 
TA 350-500V - ANSWER 25ft TA 
 
TT 750-1000 - ANSWER 20ft TT 
 
TT .01-.75 - ANSWER 4ft TT 
 
TA 200-350V - ANSWER 20ft TA 
 
TA up to 50V - ANSWER 10ft TA 
 
TT .75-50V - ANSWER 6ft TT 
 
How many electrocution hazard warnings must be displayed - ANSWER 1 in cab 2 outside 
 
Using Running wire rope, ________ randomly distributed broken wi...
-
NCCCO Rigger 1 Study Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 7 pages • 2024
-
- $7.99
- + learn more
1. A wire rope that is a 6x19 classification could have how many wires per strand? 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? Winds in 
excess of 35 mph 
4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? 
Abrasion 
5. Which of the following defects discovered during an inspection would cause fo...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump do...
-
NCCCO Rigger 1 Study Questions & Answers 100% Correct!
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
1. A wire rope that is a 6x19 classification could have how many wires per strand? - ANSWER15 through 26 wires per strand 
 
2. How often should a synthetic web sling be inspected? - ANSWEREach day before use 
 
5. Which of the following defects discovered during an inspection would cause for removing a wire rope sling from service? - ANSWERTen broken wires in one lay 
 
6. According to OSHA, each day before being used, all rigging hardware and slings shall be inspected for damage or defects by ...
As you read this, a fellow student has made another $4.70
-
Nccco Core Exam Questions With All Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Nccco Core Exam Questions With All Answers 
 
If taking sides strain on a boom what concerns the operator the most - ANSWER- Boom damage 
 
If a crane load chart has capacities listed in the shaded area this means that - ANSWER- If overloaded structural confidence will be compromised 
 
As the layers of rope on a drum increase the allowable line Pull wil - ANSWER- Decrease 
 
Of the following actions which one will most likely cause a side load condition - ANSWER- Abruptly starting or stopping t...
-
Millwright Rigging & Lifting Exam Questions With Verified Answers Graded A+ 2024/2025
- Exam (elaborations) • 12 pages • 2024
-
- $12.00
- + learn more
Millwright Rigging & Lifting Exam Questions With Verified Answers Graded A+ 2024/2025 
The breaking strength of rope is 
a. force needed to pull rope 
b. force needed to tear rope 
c. force needed to break the rope 
d. force needed to stretch rope 
c. force needed to break the rope 
 
 
What are spreader beams used for? 
a. calculate loads 
b. use on heavy lods 
c. support loads during lifts 
d. support long loads during lifts 
d. support long loads during lifts 
 
 
What are equalizer beams use...
-
Millwright Rigging & Lifting Questions and Answers 100% correct
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $17.49
- + learn more
Millwright Rigging & Lifting Questions and Answers 100% correct The breaking strength of rope is 
a. force needed to pull rope 
b. force needed to tear rope 
c. force needed to break the rope 
d. force needed to stretch rope 
c. force needed to break the rope 
 
 
 
Traction grade wire rope has a breaking load of __________ tons per square inch 
a. 110-190 
b. 50-60 
c. 45-90 
d. 80-90 
d. 80-90 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unm...
-
NEIEP 200 Final Review Questions with 100% Complete Solutions, A+
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Which lay of wire rope has the strand wires in line with the rope axis? - Regular Lay 
 
At what speed should the counterweight safeties be set to trip? - Up to 10% higher than the car governor 
 
Which type of safety uses an oil buffer between the car and safety planks? - Type C 
 
What is the purpose of the terminal motion switch? - slow down and stop the car automatically at or near the top or bottom landing 
 
If you have a 3500 lb. car rated at 4000 lbs. capacity, how much shoul...
-
NCCCO MOBILE CRANE | 100 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 17 pages • 2023
-
- $15.49
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder 
height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order 
for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - a. 
3. The load line of the crane you're operating contacts an energized power line. ...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia