Aia contract - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aia contract? On this page you'll find 236 study documents about Aia contract.

Page 3 out of 236 results

Sort by

CDT Exam Questions and Answers Already Graded A
  • CDT Exam Questions and Answers Already Graded A

  • Exam (elaborations) • 118 pages • 2023
  • Available in package deal
  • CDT Exam Questions and Answers Already Graded A Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG...
    (0)
  • $12.99
  • + learn more
CDT Exam Questions And Correct  Answers
  • CDT Exam Questions And Correct Answers

  • Exam (elaborations) • 82 pages • 2023
  • Available in package deal
  • CDT Exam Questions And Correct Answers Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCP...
    (0)
  • $15.49
  • + learn more
CDT Test Questions 2024 Graded A+
  • CDT Test Questions 2024 Graded A+

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • CDT Test Questions 2024 Graded A+ 1. What establishes the relationship between the Contractor and the Architect/Engineer (A/E)? A - National laws B - Signed agreements C - Third-party obligations D - Special conditions - ANSWERSAnswer: C - Third-party obligations. The Contractor and the A/E do not have any signed agreements, the general terms and conditions of their respective contracts with the Owner provide them with third party obligations to each other. Reference: See PDPG Sect...
    (0)
  • $10.99
  • + learn more
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 65 pages • 2024
  • Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
    (0)
  • $12.99
  • + learn more
AIA - Contract Documents Exam Studyguide 2023-2024
  • AIA - Contract Documents Exam Studyguide 2023-2024

  • Exam (elaborations) • 32 pages • 2023
  • AIA - Contract Documents Exam Studyguide ...
    (0)
  • $11.49
  • + learn more
Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions
  • Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions

  • Exam (elaborations) • 16 pages • 2023
  • AIA Document C-401 refers to: correct answer: C. Architect-Consultant Agreement According to AIA Document C-401, The General Provisions (Articles 1.1 & 1.2), provide the following clarifications of the contract (Choose the one (1) which does not apply): correct answer: B. The architect can require the consultant to do whatever they believe is necessary. According to AIA Document C-401 (1.5), except as otherwise authorized by the Architect, all communications between the Consultant and th...
    (0)
  • $12.99
  • + learn more
CDT Exam Questions | 100% Correct Answers |  Verified | Latest 2024 Version
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 65 pages • 2024
  • Available in package deal
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10...
    (0)
  • $11.80
  • + learn more
NCARB practice Study Questions with Answers
  • NCARB practice Study Questions with Answers

  • Exam (elaborations) • 14 pages • 2024
  • The contractor is required to replace the lighting fixtures wiht the fixtures specified without remibursement - Answer A contractor under a fixed-price construction contract has allowed the electrical subcontractor to install lighting fixtures other than those stated in the contract documents. The electrical subcontractor and the contractor both believe the substituted fixtures to be of equal value. The construction is substantially completed and the architect rejects these fixtures. Accord...
    (0)
  • $12.99
  • + learn more
CDT Practice Exam Final questions and  answers A-graded
  • CDT Practice Exam Final questions and answers A-graded

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • CDT Practice Exam Final questions and answers A-graded Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - CORRECT ANSWER-Answer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usua...
    (0)
  • $17.49
  • + learn more
NASCLA Business Law and Management Exam Questions With 100% Correct Answers, Latest Update 2024/2025 | Rated A+
  • NASCLA Business Law and Management Exam Questions With 100% Correct Answers, Latest Update 2024/2025 | Rated A+

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • NASCLA Business Law and Management Exam Questions With 100% Correct Answers, Latest Update 2024/2025 | Rated A+. Sole Proprietorship - Correct Answer-a business owned and managed by a single individual Simplest form to set up unlimited Liability Partnerships - Correct Answer-Business organizations in which two or more persons share responsibilities, costs, profits, and losses. C Corporations - Correct Answer-Corporations that have no restrictions on who owns their shares or the number of...
    (0)
  • $15.99
  • + learn more