Bmps - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Bmps? On this page you'll find 200 study documents about Bmps.
Page 3 out of 200 results
Sort by
-
CEPSCI BMPs PRACTICE EXAM QUESTION WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 8 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
The amount of space on each side of a typical surface water that must serve as a buffer zone? correct answer: 30ft 
 
The amount of space on each side of a sensitive water body that must serve as a buffer zone? correct answer: 45ft 
 
Which option provides the entire buffer width? correct answer: Option A 
 
Which option provides a reduced buffer width? correct answer: Option B 
 
Which option provides no buffer zone? correct answer: Option C 
 
Which BMP cannot be used for velocity control...
-
CESSWI Part 2 Exam Questions And Answers All Verified
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
CESSWI Part 2 Exam Questions And Answers All Verified 
 
Multiple Hat Role 
Primary Role - Determine Regulatory Compliance of site 
Official Representative On-Site 
Fact Finder and Record Keeper 
Enforcement Case Developer 
Technical Instructor 
 
 
CESSWI 
Certified Erosion, Sediment and StormWater Inspector 
 
 
Good Inspectors Skills 
Inquisitiveness, Thoroughness, Consistency, Integrity, Conflict Resolution, and Communication 
 
 
Plan Types 
SWPPP, ESCP, Drainage/Grading Plan, SPCC, SWMP 
...
-
Hydromulch vs Hydroseed (EC) Mulch- Temp BMP that consists of WOOD or other fiber Seed- Temp BMP that consists of SEED, , etc... Soil Binders (EC) Polyacrylamides (PAMS) applied to soil to reduce ersion Previous Play Next Rewind 10 seconds Move for
- Exam (elaborations) • 17 pages • 2024
-
- $15.99
- + learn more
Existing vegetation 
a temporary or permanent BMP designed to stabilize 
soil and to remove suspended particles from sheet flow runoff. 
 
 
 
Scheduling/Sequencing 
temporary, procedural control that involves 
creating a written plan to address necessary BMPs and the sequencing of 
construction activities in order to mitigate the erosive effects of wind, water, 
and construction activity. 
 
 
 
 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
-- 
/ 
-- 
Full screen 
...
-
CISEC Study for exam fully solved (already passed)
- Exam (elaborations) • 29 pages • 2024
-
- $14.49
- + learn more
True or False: The CGP states that inspections are to occur only during normal working hours. 
True 
 
 
 
True or False: The CGP does not mandate inspection of equipment storage and maintenance areas. 
False 
 
 
 
True or False: Since 1998, regulations require permits for Phase I (5 acres or more) projects. Since 2003, permits also required for Phase II (1 or more acres) projects. 
True 
 
 
 
True or False: Under the Clean Water Act (CWA), citizens can bring civil action against violators of ...
-
CISEC Exam with verified answers
- Exam (elaborations) • 11 pages • 2024
-
- $7.99
- + learn more
CISEC Exam with verified answers LDP. NPDES CWA Penalty Types What documents are required on site? Who is the "operator"? Also the LRP. When do you need permit coverage? Large Land Development Vertical Projects Bix Box Projects Linear Projects ) What is erosion? What are the three types of Wind Erosion? Which method of wind erosion moves the most soil? What are the types of water erosion? Raindrop Erosion Sheet Erosion Rill and Gully Erosion What factors impact rainfall erosion? What is Sedime...
Fear of missing out? Then don’t!
-
Cesswi 2 Questions And Answers 2024 Update A+
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $8.39
- + learn more
Temporary stabilization - Answer-stone or plastic as a BMP to reduce erosion by stabilizing areas that 
will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
5 types of plans - Answer-1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
SWPPP - Answer--required by NPDES for industrial, multi sector, and construction general permits 
-addresses op...
-
CISEC abbreviations Questions with complete solution 2024
- Exam (elaborations) • 16 pages • 2024
-
- $12.99
- + learn more
CISEC abbreviations Questions with complete solution 2024EPA 
Environmental Protection Agency 
 
 
S&EC Drawings 
Sediment and Erosion Control Drawings 
 
 
 
Brainpower 
Read More 
CWA 
Clean Water Act 
 
 
NPDES 
National Pollutant Discharge Elimination System 
 
 
BMPs 
Best Management Practices 
 
 
SW 
Stormwater
-
COSC 153 Final Test Questions and Answers All Correct
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
COSC 153 Final Test Questions and Answers All Correct 
Which activities fall under the category of quality assurance? 
 - Performing a sample test of 10% of the alarm devices 
 - Checking every concrete delivery ticket to ensure the mix matches specifications 
 - Spot checking a subcontractor's inspection checklist 
 - Flooding a roof with water to see if it leaks. - Answer-Performing a sample test of 10% of the alarm devices. 
Checking every concrete delivery ticket to ensure the mix matches ...
-
CESSWI Part 2 Questions and Answers 100% Accurate 2024
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
CESSWI Part 2 Questions and Answers 100% Accurate 2024 
Existing Veg, Desc/Purp 
temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. 
 
 
 
Existing Veg, Objectives 
1) Site Plan and Mang 
2) Erosi Cont 
3) Sedi Cont 
4) Post-Cons Mang 
 
 
 
 
Existing Veg, applic 
1) Areas within site where no const activity is occur 
2) Areas where local, state and fed govt require preservation 
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. 
 ...
-
Turf (3b): Turf Pest Management - Test Your Knowledge (all solved)
- Exam (elaborations) • 8 pages • 2023
-
- $8.39
- 1x sold
- + learn more
Name some of the factors turfgrass managers must consider when setting pest management priorities. correct answers Turfgrass management professionals must consider human safety, environmental safety, turf use(s), efficacy, and economics. 
 
Why do pest management thresholds in turf vary? correct answers Pest thresholds vary from site to site because they depend on site characteristics and uses. For example, there may be zero tolerance for pests of any sort on a gold green. On the other hand, the...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia