Boilers - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Boilers? On this page you'll find 2644 study documents about Boilers.

Page 3 out of 2.644 results

Sort by

Boilermaker NCCR Test   Questions And Answers
  • Boilermaker NCCR Test Questions And Answers

  • Exam (elaborations) • 10 pages • 2024
  • Boilermaker NCCR Test Questions And Answers Boilermaker NCCR Test 1 ft 3-3/4 in + 2 ft 1-1/16 in +5 ft 10- 7/8 in = - ANS 9 ft 3-11/16 in A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be adjusted over 15 PSI? - ANS Acetylene is unstable above this pressure A big control valve is pulled who is responsible for the rigging? - ANS Crane operator and rigger A boiler maker must have all of the following wh...
    (0)
  • $10.99
  • 1x sold
  • + learn more
P-99 / Low PSI Oil Burner Operator Questions and Answers 100% Solved
  • P-99 / Low PSI Oil Burner Operator Questions and Answers 100% Solved

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • P-99 / Low PSI Oil Burner Operator Questions and Answers 100% Solved All heating, combustion, and cooking equipment shall be provided with insulation or the building construction shall be fire protected, so that during operation the surface of combustible construction materials will not be raised to a temperature higher than ____. 170 ̊F Acceptance tests: Boilers shall not be placed in operation upon completion of construction until they have been ____ and an equipment use permit has ...
    (1)
  • $9.99
  • 2x sold
  • + learn more
Low Pressure Boiler COF NY Exam with correct Answers
  • Low Pressure Boiler COF NY Exam with correct Answers

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • Low Pressure Boiler COF NY
    (0)
  • $10.49
  • 1x sold
  • + learn more
PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!!
  • PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!!

  • Exam (elaborations) • 114 pages • 2024
  • Available in package deal
  • PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!! Introduction to Power Engineering Which of the following is not a definition of a power plant? a) Any one or more boilers in which steam or other vapour is generated at more than 103 kPa (15 psi). b) Any one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). c) Any one or more boilers containing liquid and having a working temperature exceeding 121 degrees Cel...
    (0)
  • $23.49
  • 1x sold
  • + learn more
High Pressure Boilers 1069 * QUESTIONS WITH COMPLETE SOLUTIONS
  • High Pressure Boilers 1069 * QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 152 pages • 2023
  • Available in package deal
  • Boiler water is treated in order to prevent a) sludge, mud, pitting, corrosion b) foaming, corrosion, carryover, sludge c) sludge, corrosion, scale, carryover d) scale, sludge, mud, pitting e) foaming, carryover, pitting, corrosion c Dissolved solids in raw water a) cause pitting of boiler surfaces b) cause grooving of piping surfaces c) are organic matter d) cannot be removed with filters e) cause corrosion of boiler surfaces d Boiler surfaces may have what appears to ...
    (0)
  • $16.49
  • 1x sold
  • + learn more
Special Boiler License Practice Exam Minnesota Questions and Answers
  • Special Boiler License Practice Exam Minnesota Questions and Answers

  • Exam (elaborations) • 6 pages • 2023
  • Special Boiler License Practice Exam Minnesota Questions and Answers
    (0)
  • $12.99
  • 1x sold
  • + learn more
5th Class Power Engineering Questions And Answers All correct
  • 5th Class Power Engineering Questions And Answers All correct

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • 5th Class Power Engineering Questions And Answers All correct The boilers and pressure vessels act was put into place to protect: a) contractors b)owners c)employers d)employees e) the public - ANS e Which of the following codes have the Canadian jurisdictions adopted in reference to pressure vessel regulation? a)CBT V33 b)CBT V62 c)CSA B51 d)CSA B52 e)CSA B31 - ANS c If a piping system design is approved, a piping number is stamped on the design, such as PP-455-E-03-P. The ...
    (1)
  • $12.99
  • 3x sold
  • + learn more
PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!!
  • PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!!

  • Exam (elaborations) • 114 pages • 2024
  • Available in package deal
  • PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!! Introduction to Power Engineering Which of the following is not a definition of a power plant? a) Any one or more boilers in which steam or other vapour is generated at more than 103 kPa (15 psi). b) Any one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). c) Any one or more boilers containing liquid and having a working temperature exceeding 121 degrees Cel...
    (0)
  • $26.49
  • 1x sold
  • + learn more
Stationary Engineer NYC high pressure  boiler license Exam Q&A A+ Graded
  • Stationary Engineer NYC high pressure boiler license Exam Q&A A+ Graded

  • Exam (elaborations) • 41 pages • 2024
  • Stationary Engineer NYC high pressure boiler license Exam Q&A A+ Graded How much clearance from the top of the boiler is needed for a HP boiler that produces 70000 lbs of steam? - CORRECT ANSWER-7 feet On a gas fired boiler what is the proper gas to air mixture - CORRECT ANSWER-30%- 70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18...
    (0)
  • $16.99
  • 1x sold
  • + learn more