Nccco test 4 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco test 4? On this page you'll find 40 study documents about Nccco test 4.

Page 3 out of 40 results

Sort by

NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing instructions be kept - ANSWER ON Site All climbing operations shall be performed under the supervision of - ANSWER Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - ANSWER Before crane is placed in service Hooks shall be equipped with lat...
    (0)
  • $14.99
  • + learn more
NCCCO Core sample test Question WITH VERIFIED SOLUTIONS ALREADY GRADED A+.
  • NCCCO Core sample test Question WITH VERIFIED SOLUTIONS ALREADY GRADED A+.

  • Exam (elaborations) • 9 pages • 2024
  • NCCCO Core sample test Question WITH VERIFIED SOLUTIONS ALREADY GRADED A+. A frequent inspection is:: Daily to monthly 1. 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up?: Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 2. 2. When hoisting personnel, within what percentage of level must a tele- scopic boom crane be in order for the gross rati...
    (0)
  • $12.99
  • + learn more
Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ ASME B30.5 - Answer -Mobile and Locomotive cranes, all types ASME B30.3 - Answer -Tower Cranes ASME B30.23 - Answer -Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - Answer -Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - Answer -2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor perso...
    (0)
  • $11.99
  • + learn more
TOWER CRANE QUESTIONS AND ANSWERS.
  • TOWER CRANE QUESTIONS AND ANSWERS.

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • Which of the following OSHA regulations govern suspended personnel platforms? OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is 15 ft Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:05 / 0:15 Full screen According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design fa...
    (0)
  • $13.49
  • + learn more
NCCCO CORE SAMPLE TEST QUESTIONS AND ANSWERS 2024
  • NCCCO CORE SAMPLE TEST QUESTIONS AND ANSWERS 2024

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • A frequent inspection is: Daily to monthly 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:00 / 0:00 Full screen 2. When hoisting personnel, within what percentage of level must a telescopic bo...
    (0)
  • $14.49
  • + learn more
NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update
  • NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • NCCCO Rigger 1 Test | 30 Questions with 100% Correct Answers | Verified | Latest Update What is the max included angle for a shackle? - Answer ️️ -120 Degrees Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - Answer ️️ -80 % The center of gravity location of a load may _________of the load - Answer ️️ -Not be located on the actual physical body A sling that is rigged at 30 degrees to the load will be subjected to an increase slin...
    (0)
  • $10.49
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)

  • Exam (elaborations) • 16 pages • 2024
  • Splices in rall tracks shall have - ANSWER Smooth Joints Hydraulic systems should have their proper fluid level checked - ANSWER Daily If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing instructions be kept - ANSWER ...
    (0)
  • $14.49
  • + learn more
NCCCO Test #4 Exam Questions and Answers
  • NCCCO Test #4 Exam Questions and Answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Jib offset is the jib angle to the - Boom All hazards and problems that are found on the worksite should be identified: - At the preoperational worksite inspection Which of the following OSHA regulations govern suspended personnel platforms: - OSHA 1926. 1431 According to OSHA 1926.1408 the prohibited zone for powerlines that are 60 Kv is: - 15 feet What percentage of the gross capacity is used when lifting with more than one crane? - 75% You are required to pass a physical exam every______...
    (0)
  • $8.00
  • + learn more