Recommended Practice for Basic Inspection-New Pipeline Construction API 1169
- Exam (elaborations) • 7 pages • 2024
-
- $10.99
- + learn more
Recommended Practice for Basic Inspection-New Pipeline Construction API 1169 
API Specification 5L 
Specification for Line Pipe 
 
 
API Recommended Practice 5L1 
Recommended Practice for Railroad Transportation of Line Pipe 
 
 
API Recommended Practice 5LT 
Recommended Practice for Truck Transportation of Line Pipe 
 
 
API Recommended Practice 5LW 
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels 
 
 
API Specification 6D 
Specification for Pipe Valves 
 
 
AP...
-
API 1169 Questions and Answers 100% Pass
- Exam (elaborations) • 28 pages • 2024
-
- $10.49
- + learn more
Which of the following equipment may NOT be required for a pressure test? internal line 
clamps 
before testing begins, a ________ with explanatory notes and data should be prepared 
pressure test procedure 
the pressure testing of newly constructed liquid pipelines and replaced segments of existing 
pipelinesshould be performed in accordance with ASME B31.4, 49 Code of Federal 
Regulations, Part 195 and any other applicable governmental 
regulations. 
Before the actual line filling operation, i...
-
API 1169 Study Test Questions Test RM 2 Already Passed
- Exam (elaborations) • 16 pages • 2024
-
- $10.49
- + learn more
According to OSHA a "protective system" is defined as: Method of protecting employees 
from cave-ins. 
Design and development inputs shall be identified and reviewed for? Accuracy, 
completeness and lack of conflict 
The Excavator calls the One Call Center prior to excavation at least Two working days nor 
more than ten working days 
Encroachment Area is the area where the ground disturbance occurs within: 50 feet of the 
centerline of the existing facility (or ROW) or other easement 
The pres...
-
API 1169 Study Guide With Correct Answers.
- Exam (elaborations) • 26 pages • 2024
-
- $10.59
- + learn more
API 1169 Study Guide With Correct Answers. 
OSHA 1910 
______ document has the largest PPE section and safety definitions 
 
 
OSHA 1926 
_______ document has construction safety, safety focused on eye and face protection, excavation safety, scaffolds, cranes riggings, use of explosives' 
 
 
33 CFR 321 
______ document covers Dams/ Dikes, very infrequently used, very short and you will quickly be able to find what you need 
 
 
49 CFR 
____ document has hazardous materials tables, hazardous sh...
-
API 1169 Recommended Practice Exam Verified 100% Correct!!
- Exam (elaborations) • 6 pages • 2024
-
- $10.99
- + learn more
API 1169 Recommended Practice Exam Verified 100% Correct!! 
API Specification 5L 
Specification for line pipe 
 
 
APL Recommended Practice 5L1 
Recommended practice for railroad transportation of line pipe 
 
 
API Recommended Practice 5LT 
Recommended practice for truck transportation of line pipe 
 
 
API Recommended Practice 5LW 
Recommended practice for transportation of line pipe on barges and marine vessel 
 
 
API Specification 6D 
Specification for pipeline valves 
 
 
API Recommended P...
Want to regain your expenses?
-
API 1169 Study test questions test
- Exam (elaborations) • 13 pages • 2024
-
- $11.09
- + learn more
API 1169 Study test questions test RM#3 
One main category variable of pressure test planning that an operator must consider is the _________________. 
purpose 
 
 
Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the company. 
True 
 
 
Location of casings cathode protection external anodes, and utility crossings should all be recorded on the. 
as-built drawings 
 
 
Releasing air or water pressure through valves, at a test head, after the testing of a pipe is...
-
API 1169 Sample Test Questions and Answers Graded A+
- Exam (elaborations) • 10 pages • 2024
-
- $8.99
- + learn more
Which of the following equipment may NOT be required for a pressure test? Internal line up 
clamps 
Before testing begins, a _____________ with explanatory notes and data should be prepared. 
Pressure test procedure 
The pressure testing of newly constructed liquid pipelines and replaced segments of existing 
pipelines should be performed in accordance with: ASME, Code of Federal Regulations and 
any other applicable governmental regulations. 
Before the actual line filling operation, it is advi...
-
API 1169 Study Test Questions Test RM 3 Latest Update Graded A+
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
API 1169 Study Test Questions Test RM 
 
3 Latest Update Graded A+ 
 
One main category variable of pressure test planning that an operator must consider is the 
_________________. purpose 
 
Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the 
company. True 
 
Location of casings cathode protection external anodes, and utility crossings should all be 
recorded on the. as-built drawings 
 
Releasing air or water pressure through valves, at a test head, after t...
-
CWEA Collection Systems Maintenance Grades 1 (2024 Update) Practice Questions and Verified Answers| 100% Correct| Grade A
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
CWEA Collection Systems Maintenance Grades 1 (2024 Update) Practice Questions and Verified Answers| 100% Correct| Grade A 
 
Q: The lack of an unpleasant odor in a manhole, loft station, or other structures does not always mean that dangerous gases aren't present because: 
 
 
Answer: 
Some dangerous gasses have no odor. 
 
 
 
Q: What should be considered when providing trench shoring? 
 
 
Answer: 
Depth of trench ( anything over 5' needs shoring) 
 
 
 
Q: Excavations & adjacent areas must ...
-
AZ400 ALL ANSWERS 100% CORRECT SPRING FALL-2023/24 LATEST EDITION GUARANTEED GRADE A+
- Exam (elaborations) • 27 pages • 2023
-
- $14.99
- 1x sold
- + learn more
QUESTION 1 
You use Azure Artifacts to host NuGet packages that you create. 
You need to make one of the packages available to anonymous users outside your 
organization. The solution 
must minimize the number of publication points. 
What should you do? 
A. Change the feed URL of the package 
B. Create a new feed for the package 
C. Promote the package to a release view. 
D. Publish the package to a public NuGet repository. 
Correct Answer: B 
Section: (none) 
Explanation 
Explanation/Reference:...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia