Shark tank - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Shark tank? On this page you'll find 43 study documents about Shark tank.

Page 3 out of 43 results

Sort by

 29 RBS Exam 80 Questions with verified Answers,100% CORRECT
  • 29 RBS Exam 80 Questions with verified Answers,100% CORRECT

  • Exam (elaborations) • 6 pages • 2023
  • 29 RBS Exam 80 Questions with verified Answers 29 length at waterline - CORRECT ANSWER 26ft 2in Max length in water - CORRECT ANSWER 31ft 7 inches Beam overall - CORRECT ANSWER 8ft 5in Offset of transducer - CORRECT ANSWER 18 inches Operational draft engines down - CORRECT ANSWER 33 inches Minimum draft(engines raised) - CORRECT ANSWER 22 inches Highest point above the waterline (search light) - CORRECT ANSWER 9ft 10 in Height of cabin from waterline - CORRECT ANSWER ...
    (0)
  • $10.19
  • + learn more
F106B Quiz Answers 2023
  • F106B Quiz Answers 2023

  • Exam (elaborations) • 8 pages • 2023
  • QU ES T ION 1 1. What is the element of the planning, programming, budgeting, and execution (PPBE) process which might be described as "planning with dollars, or the planning phase outputs? A. Planning B. Programming C. Budgeting QU ES T ION 2 1. The Future Years Defense Program (FYDP) is used to show anticipated development of various programs across the Department of Defense (DOD). What might those programs entail? A. Funds for Research and Development, Covert Operations, Space Integ...
    (0)
  • $14.99
  • + learn more
MAC3703 Assignment 2 (DETAILED ANSWERS) Semester 2 2023 (715655) - DUE 19 September 2023
  • MAC3703 Assignment 2 (DETAILED ANSWERS) Semester 2 2023 (715655) - DUE 19 September 2023

  • Exam (elaborations) • 25 pages • 2023
  • MAC3703 Assignment 2 (DETAILED ANSWERS) Semester 2 2023 () - DUE 19 September 2023 100% TRUSTED workings, explanations and solutions. For assistance call or Whatsapp us on +25477 954 0132 . QUESTION 1 (30 MARKS) Mrs Sindy Lula has been in the financial Services Sector for more than 20 years and is considering a career shift. At present, she is a credit provider (mashonisa) where she owns and runs the money lending business throughout the Eastern Cape under the name BZN Agri-Retailers (PTY) LTD....
    (0)
  • $2.71
  • + learn more
MAC3703 Assignment 2 Semester 2 2023 (715655)
  • MAC3703 Assignment 2 Semester 2 2023 (715655)

  • Exam (elaborations) • 25 pages • 2023
  • MAC3703 Assignment 2 Semester 2 2023 () - DUE 19 September 2023 100% TRUSTED workings, explanations and solutions. For assistance call or Whatsapp us on +25477 954 0132 . QUESTION 1 (30 MARKS) Mrs Sindy Lula has been in the financial Services Sector for more than 20 years and is considering a career shift. At present, she is a credit provider (mashonisa) where she owns and runs the money lending business throughout the Eastern Cape under the name BZN Agri-Retailers (PTY) LTD. Having been in thi...
    (0)
  • $2.70
  • + learn more
RBS Coxswain Study Guide Questions And Answers All Correct
  • RBS Coxswain Study Guide Questions And Answers All Correct

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • RBS Coxswain Study Guide Questions And Answers All Correct 29 RBS Manufacturer - ANSWER Metal Shark Aluminum Boats 29 RBS Hull - ANSWER 5086 Aluminum MSU Baton Rouge AOR - ANSWER Lower Mississippi MM167-MM303 AOR 1 MM219 Port Allen Locks North to Old River Lock AOR 2 MM219 Port Allen Locks South to AOR 3 Atchafalaya MM 0 -65, Portion of Lake Maurepas in Livingston Parish Extra AOR: Downriver, Bonnett Carre Spillway Launch Ramp LMR 125 GAR Model - ANSWER ...
    (0)
  • $12.39
  • + learn more
29 RBS Coxswain Study Guide Questions and Answers 2023
  • 29 RBS Coxswain Study Guide Questions and Answers 2023

  • Exam (elaborations) • 8 pages • 2023
  • 29 RBS Coxswain Study Guide Questions and Answers 2023 29 RBS Manufacturer Metal Shark Aluminum Boats 29 RBS Hull 5086 Aluminum MSU Baton Rouge AOR Lower Mississippi MM167-MM303 AOR 1 MM219 Port Allen Locks North to Old River Lock AOR 2 MM219 Port Allen Locks South to AOR 3 Atchafalaya MM 0 -65, Portion of Lake Maurepas in Livingston Parish Extra AOR: Downriver, Bonnett Carre Spillway Launch Ramp LMR 125 GAR Model (General Assessment Risk) 0-23/Green, 24-44/Amber, ...
    (0)
  • $15.99
  • + learn more
MAR 3023 EXAM 3 FSU BRADY Answered 100% Correct
  • MAR 3023 EXAM 3 FSU BRADY Answered 100% Correct

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • What is a Product? - ANSWER-A product is good, service, idea ( or a combination of two or more of these) Includes supporting services: installations, guarantees, warranties Goods - ANSWER-A tangible, physical entity Service - ANSWER-An intangible, result of application of human and mechanical efforts to people or objects (hybrids) Ideas - ANSWER-concept, philosophy, image or issue Consumer Products - ANSWER-Purchased to satisfy personal and family needs and are classified according t...
    (0)
  • $12.49
  • + learn more
TSI Testing 126 Questions with Verified Answers,100% CORRECT
  • TSI Testing 126 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 27 pages • 2023
  • Available in package deal
  • TSI Testing 126 Questions with Verified Answers In 2010, talk show host Oprah Winfrey and novelist Jonathan Franzen kissed and made up after a nine-year feud. In 2001, Franzen was disinvited from appearing on Winfrey's TV show to pitch his novel The Corrections after he made it clear that he was unhappy about the book's being chosen for the Oprah Book Club. Describing his work as "in the high-art literary tradition," Franzen said he didn't want to be associated with the Club, which he a...
    (0)
  • $10.99
  • + learn more
Assignment 4 COM 424|all you need
  • Assignment 4 COM 424|all you need

  • Exam (elaborations) • 9 pages • 2022
  • Running Case You and your team are continuing your work on the Global Treps Project. Your project sponsor, Dr. K., has asked you to refine the existing cost estimate for the project so you can evaluate supplier bids and have a solid cost baseline for evaluating project performance. Recall that your schedule and cost goals are to complete the project in six months for under $120,000. You planned to use up to $50,000 total to pay yourself and your team members, and your initial estimates wer...
    (0)
  • $8.49
  • + learn more
300 +1700+450 TOEFL IBT EXAM WITH 100% CORRECT ANSWERS 2024.
  • 300 +1700+450 TOEFL IBT EXAM WITH 100% CORRECT ANSWERS 2024.

  • Exam (elaborations) • 718 pages • 2024
  • abberant - answers-abnormal, unusual, exceptional abruptly - answers-suddenly, quickly absurd - answers-ridiculous, irrational, nonsensical abundant - answers-plentiful, oversufficient, copious accessible - answers-reachable; obtainable, attainable account for - answers-explain acknowledge - answers-recognize, concede, admit adjacent - answers-nearby, neighboring, adjoining advent - answers-beginning, onset, commencement advocate - answers-support, stand up for akin...
    (0)
  • $7.99
  • + learn more