Ahera - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Ahera? On this page you'll find 329 study documents about Ahera.

Page 4 out of 329 results

Sort by

Maryland Asbestos Inspector Class Final  Exam 2024/2025
  • Maryland Asbestos Inspector Class Final Exam 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Maryland Asbestos Inspector Class Final Exam 2024/2025 When is it an asbestos containing material, What is the Acronym - CORRECT ANSWER-When it has > 1% asbestos, ACM Asbestos Definition - CORRECT ANSWER-A naturally occurring fibrous mineral What is the most common type of asbestos we will encounter? - CORRECT ANSWER-Chrysotile What are the 6 varieties that are regulated? - CORRECT ANSWER-Chrysotile (white), Amosite (Brown), Crocidolite (Blue), Anthophyllite, Tremolite, Actinolite ...
    (0)
  • $11.99
  • + learn more
asbestos initial supervisor course Games and activities
  • asbestos initial supervisor course Games and activities

  • Exam (elaborations) • 19 pages • 2024
  • Asbestos initial supervisor course exam and answers Glovebag - ANSWERS (Class III small jobs) Use of a sprayer and HEPA vacuum after completion of work. A minimum of two ppl are required. Used for maintenance related repairs Mini-Enclosure - ANSWERS (Class III small jobs) Use of negative air pressure from a HEPA vacuum, there is no decon station Friable asbestos-containing building materials are those that contain greater than 1 % asbestos and that: - ANSWERS Can be crumbled, pulver...
    (0)
  • $15.49
  • + learn more
 TDSHS Asbestos Inspector Exam Questions And Answers Graded A+.
  • TDSHS Asbestos Inspector Exam Questions And Answers Graded A+.

  • Exam (elaborations) • 15 pages • 2024
  • TDSHS Asbestos Inspector Exam Questions And Answers Graded A+. Per AHERA, management plan includes: - correct answer. complete record of inspection, including construction plans, exact locales of ACBM, assessment of physical condition of ACBM moderate disturbance classification of disturbance factors - correct answer. ACBM which shows any one of the following characteristics: accessible, subject to vibration, or subject to air erosion; ACBM on corridor walls, a ceiling und...
    (0)
  • $11.49
  • + learn more
ACM 66 review questions and Correct answers
  • ACM 66 review questions and Correct answers

  • Exam (elaborations) • 7 pages • 2024
  • 10. What is the size limit for a major fiber release which requires accredited persons in AHERA and is mentioned in for public and commercial buildings according to ASHARA and the revised MAP? - ️️Greater than 3 square or linear feet According to AHERA 40 CFR 763.85 paragraph (c), what assessment can be given to thermal system insulation That has retained its structural integrity and has an undamaged protective jacket that prevents fiber release - ️️Non-friable According to AHERA, what...
    (0)
  • $7.99
  • + learn more
Asbestos Building Inspector Initial Questions and Answers 2024/2025
  • Asbestos Building Inspector Initial Questions and Answers 2024/2025

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Asbestos Building Inspector Initial Questions and Answers 2024/2025 AHERA - CORRECT ANSWER-The Asbestos Hazard Emergency Response Act. 40 CFR Part 763, Subpart E. Started 1986 and requires that all schools, grades K-12 (nonprofit), be inspected for the presence of ACBM (asbestos-containing building material). ACBM - CORRECT ANSWER-Asbestos Containing Building Material ASHARA - CORRECT ANSWER-The Asbestos School Hazard Abatement Reauthorization Act. Started 1990, effective Nov. 1992, req...
    (0)
  • $11.99
  • + learn more
Maryland Asbestos Exam Actual Questions And Answers 2023/2024 A+ Grade.
  • Maryland Asbestos Exam Actual Questions And Answers 2023/2024 A+ Grade.

  • Exam (elaborations) • 6 pages • 2024
  • Maryland Asbestos Exam Actual Questions And Answers 2023/2024 A+ Grade. The lean ratio of an extension ladder 4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? 5 samples taken inside with results of each <0.0 f/cc What are the notification requirements in Virginia? 20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor o...
    (0)
  • $10.99
  • + learn more
CSST Practice (Pacific EH&S) Questions with Correct Solutions Graded To Pass
  • CSST Practice (Pacific EH&S) Questions with Correct Solutions Graded To Pass

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • CSST Practice (Pacific EH&S) Questions with Correct Solutions Graded To Pass Under AHERA, all LEA's must have a management plan in place by which date? -Answer-Jul- 89 The fiber concentration in a work area is measured to be 0.02f/cc, what is the concentration for a worker wearing a half-face respirator? -Answer-0.002f/cc When must an employer institute a medical surveillance program for workers exposed to asbestos? -Answer-If they are exposed over the permissible exposure limit Under t...
    (0)
  • $12.49
  • + learn more
Maryland Asbestos UPDATED Actual Exam Questions and CORRECT Answers
  • Maryland Asbestos UPDATED Actual Exam Questions and CORRECT Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Maryland Asbestos UPDATED Actual Exam Questions and CORRECT Answers The lean ratio of an extension ladder - CORRECT ANSWER- 4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? - CORRECT ANSWER- 5 samples taken inside with results of each <0.0 f/cc What are the notification requirements in Virginia? - CORRECT ANSWER- 20 calendar days for any project greater than 10 sq feet or linear feet
    (0)
  • $9.49
  • + learn more
Asbestos Building Inspector Initial Questions and Answers Scored A+
  • Asbestos Building Inspector Initial Questions and Answers Scored A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Asbestos Building Inspector Initial Questions and Answers Scored A+ AHERA The Asbestos Hazard Emergency Response Act. 40 CFR Part 763, Subpart E. Started 1986 and requires that all schools, grades K-12 (non-profit), be inspected for the presence of ACBM (asbestos-containing building material). ACBM Asbestos Containing Building Material ASHARA The Asbestos School Hazard Abatement Reauthorization Act. Started 1990, effective Nov. 1992, requires that an accredited Building Inspect...
    (0)
  • $19.49
  • + learn more
Asbestos Test question with correct answers
  • Asbestos Test question with correct answers

  • Exam (elaborations) • 14 pages • 2023
  • Available in package deal
  • Acoustical Insulation CORRECT ANSWER The general application or use of asbestos for the control of sound due to its lack of reverberant surfaces Acoustical Tile CORRECT ANSWER A finishing material in a building usually found in the ceiling or walls for the purpose of noise control Actinolite CORRECT ANSWER One of the six naturally occurring asbestos minerals. It is not normally used commercially. addenda (n) CORRECT ANSWER Changes made to working drawings and specifications for a buildi...
    (0)
  • $16.49
  • + learn more