Demolition - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Demolition? On this page you'll find 1217 study documents about Demolition.

Page 4 out of 1.217 results

Sort by

DEMOLITION 2023 EXAM ALL  QUESTIONS AND CORRECT DETAILED  ANSWERS WITH RATIONALES  (VERIFIED ANSWERS) |ALREADY  GRADED A+
  • DEMOLITION 2023 EXAM ALL QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • DEMOLITION 2023 EXAM ALL QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ What are the advantages and disadvantages of using demolition? - CORRECT ANSWER- Advantage: Speed, elimination of equipment, rapid and effective for cutting, burying, trenching, and tunneling Disadvantage: Requires highly trained and experienced personnel. Strict safety precautions, restricted by other nearby operations What is HERO - CORRECT ANSWER- Hazards of...
    (0)
  • $12.99
  • + learn more
IICRC - Applied Structural Drying questions and answers
  • IICRC - Applied Structural Drying questions and answers

  • Exam (elaborations) • 15 pages • 2024
  • Air Filtration Device (ADF) Commonly called an air scrubber or negative air machine if airborne particles need to be reduced, you could use an appropriately installed _______ ________ ________ Air Filtration Device AFD Assembly Construction Prior to determining the best drying system for affected materials, restorers should identify and understand the assembly construction (ie wall assembly, floor assembly) Category 1 water originates from a sanitary source and does not ...
    (0)
  • $15.49
  • 2x sold
  • + learn more
Basic Demolition Operations Test  Questions With 100% Correct  Answers
  • Basic Demolition Operations Test Questions With 100% Correct Answers

  • Exam (elaborations) • 12 pages • 2023
  • Basic Demolition Operations Test Questions With 100% Correct Answers Range certification and regulations - CORRECT ANSWER- Limit personel, exposure, and amount of ammo and explosives with safe efficient operations Safety and regulations and procedures are posted where? - CORRECT ANSWERWhere ammo and explsives are present Follow regulations regarding conventional ammo and explosives related hazardous material operations at all Don activities IAW - CORRECT ANSWER- Navsea Op5 ahsore a...
    (0)
  • $12.99
  • + learn more
Basic Demolition operations Test  Questions And Answers
  • Basic Demolition operations Test Questions And Answers

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Basic Demolition operations Test Questions And Answers What manual for operations ashore? - CORRECT ANSWER- NAVSEA OP5 ASHORE What manual for operations afloat? - CORRECT ANSWER- NAVSEA OP4 AFLOAT What manual for handling explosives on the surface? - CORRECT ANSWER- SWO-60 What manual for handling explosives underwater? - CORRECT ANSWER- SWO-61 Qualifications levels - CORRECT ANSWER- Range Safety Officer Quality Assurance Team Leader Team Member Qual Cert program id governed by? - COR...
    (0)
  • $14.49
  • + learn more
2024 DEMOLITION EXAM ALL QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+
  • 2024 DEMOLITION EXAM ALL QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+

  • Exam (elaborations) • 12 pages • 2024
  • What are the advantages and disadvantages of using demolition? - CORRECT ANSWER- Advantage: Speed, elimination of equipment, rapid and effective for cutting, burying, trenching, and tunneling Disadvantage: Requires highly trained and experienced personnel. Strict safety precautions, restricted by other nearby operations What is HERO - CORRECT ANSWER- Hazards of Electromagnetic Radiation to Ordnance Dont conduct demolition operations during what types of storms? - CORRECT ANSWER- electr...
    (0)
  • $11.49
  • + learn more
Basic Demolition operations Test  Questions And Answers
  • Basic Demolition operations Test Questions And Answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • Basic Demolition operations Test Questions And Answers What manual for operations ashore? - CORRECT ANSWER- NAVSEA OP5 ASHORE What manual for operations afloat? - CORRECT ANSWER- NAVSEA OP4 AFLOAT What manual for handling explosives on the surface? - CORRECT ANSWER- SWO-60 What manual for handling explosives underwater? - CORRECT ANSWER- SWO-61 Qualifications levels - CORRECT ANSWER- Range Safety Officer Quality Assurance Team Leader Team Member Qual Cert program id governed by? - COR...
    (0)
  • $11.49
  • + learn more
Basic Demolition operations Test Questions And Answers
  • Basic Demolition operations Test Questions And Answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • Basic Demolition operations Test Questions And Answers What manual for operations ashore? - CORRECT ANSWER- NAVSEA OP5 ASHORE What manual for operations afloat? - CORRECT ANSWER- NAVSEA OP4 AFLOAT What manual for handling explosives on the surface? - CORRECT ANSWER- SWO-60 What manual for handling explosives underwater? - CORRECT ANSWER- SWO-61 Qualifications levels - CORRECT ANSWER- Range Safety Officer Quality Assurance Team Leader Team Member Qual Cert program id governed...
    (0)
  • $14.99
  • + learn more
EBOLC Demolition Questions With  Answers
  • EBOLC Demolition Questions With Answers

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • EBOLC Demolition Questions With Answers Never attach M456 Det Cord, an M151, or an M152 to this component. - CORRECT ANSWER- M81 An _________ can accommodate and ensure proper proximity for initiating up to 5 shock tubes, 5 M151/152's OR 1 strand of M456 Det Cord. - CORRECT ANSWER- M9 Holder This component has a high-strength blasting cap, factory-crimped to a 30-ft length of shock tube. It also has a small J-hook for easy attachment to M456 Let Cord, a yellow flag 2 meters from ...
    (0)
  • $12.99
  • + learn more
Demolition Operations Actual  Exam Questions With Answers
  • Demolition Operations Actual Exam Questions With Answers

  • Exam (elaborations) • 19 pages • 2023
  • Demolition Operations Actual Exam Questions With Answers Which method of attack is preferred on a steel truss deck bridge with top supports? - ANSWER- bottom attack Using the Hasty method, how many total packages of C4 (M112) would be required to breach a reinforced concrete wall, which is 7 feet thick, and 16 feet wide, using elevated untamped charges? - ANSWER- 200 What is the value of "k" when you are destroying a 5-foot thick dense concrete wall using external charge? - ANSWER-...
    (0)
  • $12.99
  • + learn more
Basic Demolition Operations Test  Questions With 100% Correct  Answers
  • Basic Demolition Operations Test Questions With 100% Correct Answers

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Basic Demolition Operations Test Questions With 100% Correct Answers Range certification and regulations - CORRECT ANSWER- Limit personel, exposure, and amount of ammo and explosives with safe efficient operations Safety and regulations and procedures are posted where? - CORRECT ANSWERWhere ammo and explsives are present Follow regulations regarding conventional ammo and explosives related hazardous material operations at all Don activities IAW - CORRECT ANSWER- Navsea Op5 ahsore a...
    (0)
  • $12.49
  • + learn more