Dosh - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Dosh? On this page you'll find 383 study documents about Dosh.

Page 4 out of 383 results

Sort by

PHR-CA Exam Questions With 100% Correct Answers Updated 2024/2025 (VERIFIED)
  • PHR-CA Exam Questions With 100% Correct Answers Updated 2024/2025 (VERIFIED)

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • PHR-CA Exam Questions With 100% Correct Answers Updated 2024/2025 (VERIFIED) Exposure Records - Correct answer-Cal/OSHA standards concerning toxic substances and hazardous exposures require records of employee exposure to these substances and sources, physical examination reports, employment records, and other information No later than 8 hours - Correct answer-All fatalities and serious injuries and illnesses in California must be reported to the DOSH as soon as possible, but ___________ in...
    (0)
  • $16.99
  • + learn more
PHR-CA Exam Questions With 100% Correct Answers Latest Updated 2024/2025 Graded A+
  • PHR-CA Exam Questions With 100% Correct Answers Latest Updated 2024/2025 Graded A+

  • Exam (elaborations) • 43 pages • 2024
  • PHR-CA Exam Questions With 100% Correct Answers Latest Updated 2024/2025 Graded A+. The 3 Model Workplace Injury and Illness Prevention Models - Correct answer-High Hazard, Non-HIgh Hazard, Employers with Intermittent Workers Exposure Records - Correct answer-Cal/OSHA standards concerning toxic substances and hazardous exposures require records of employee exposure to these substances and sources, physical examination reports, employment records, and other information No later than 8 hours ...
    (0)
  • $17.49
  • + learn more
CSLB CONTRACTOR'S LAW & BUSINESS EXAM || WITH ERROR-FREE SOLUTIONS.
  • CSLB CONTRACTOR'S LAW & BUSINESS EXAM || WITH ERROR-FREE SOLUTIONS.

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • An employer remits State disability taxes withheld from an employees wages to what agency? correct answers Employment Development Department Which act establishes the rights of workers to organize into unions and negotiate contracts? correct answers National Labor Relations Act of 1935 A contractor has had a problem with employees stealing tools and equipment from job sites. When conducting job interviews, may the contractor ask prospective employees about their arrest records? A. It ...
    (0)
  • $13.39
  • + learn more
CSLB B LICENSE GENERAL  CONTRACTOR EXAM Questions & 100%  Verified Answers | Latest Update | Already  Graded A+
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM Questions & 100% Verified Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 68 pages • 2024
  • Available in package deal
  • If unused mortar stiffens due to hydration of cement, what must you do? : Discard the mortar What minimum time must you wait before caulking or grouting new tiles? : 24-48 Hours How long should you wait before installing tile on a shower pan? : 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: : Type-B Soils If 65 street lights are fed by a 2275 volt serie...
    (0)
  • $13.99
  • + learn more
CSLB B LICENSE GENERAL  CONTRACTOR EXAM Questions & 100%  Verified Answers | Latest Update | Already  Graded A+
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM Questions & 100% Verified Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 68 pages • 2024
  • Available in package deal
  • If unused mortar stiffens due to hydration of cement, what must you do? : Discard the mortar What minimum time must you wait before caulking or grouting new tiles? : 24-48 Hours How long should you wait before installing tile on a shower pan? : 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: : Type-B Soils If 65 street lights are fed by a 2275 volt serie...
    (0)
  • $13.89
  • + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM

  • Exam (elaborations) • 43 pages • 2022
  • If unused mortar stiffens due to hydration of cement, what must you do? - ANS - Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - ANS - 24-48 Hours How long should you wait before installing tile on a shower pan? - ANS - 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - ANS - Type-B Soils If 65 street lights are fed b...
    (0)
  • $7.99
  • 1x sold
  • + learn more
PHR-CA Exam 2023/2024 With 100% Correct Answers.
  • PHR-CA Exam 2023/2024 With 100% Correct Answers.

  • Exam (elaborations) • 43 pages • 2023
  • PHR-CA Exam 2023/2024 With 100% Correct Answers. The 3 Model Workplace Injury and Illness Prevention Models - Correct answer-High Hazard, Non-HIgh Hazard, Employers with Intermittent Workers Exposure Records - Correct answer-Cal/OSHA standards concerning toxic substances and hazardous exposures require records of employee exposure to these substances and sources, physical examination reports, employment records, and other information No later than 8 hours - Correct answer-All fatalities an...
    (0)
  • $12.99
  • + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM

  • Exam (elaborations) • 24 pages • 2023
  • If unused mortar stiffens due to hydration of cement, what must you do? - Answer- Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - Answer- 24-48 Hours How long should you wait before installing tile on a shower pan? - Answer- 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Answer- Type-B Soils If 65 street l...
    (0)
  • $13.49
  • + learn more
Elevator Mechanic Study Exam| 225 QUESTIONS| WITH COMPLETE ANSWERS
  • Elevator Mechanic Study Exam| 225 QUESTIONS| WITH COMPLETE ANSWERS

  • Exam (elaborations) • 22 pages • 2022
  • Available in package deal
  • ASME Correct Answer: American Society of Mechanical Engineers DOSH Correct Answer: Division of Occupational Safety and Health LADBS Correct Answer: Los Angeles Department of Building and Safety Alteration made to conveyance shall comply with ASME A17.1-204 Section Correct Answer: 8.7 The seismic section of ASME A17.1-2004 and alterations made to conveyances must also comply with this section Correct Answer: 8.4 What must be submitted to the applicable Division Elevator office...
    (0)
  • $12.49
  • 1x sold
  • + learn more
CSLB Law & Business Set 1: Questions & Answers: Updated Solution
  • CSLB Law & Business Set 1: Questions & Answers: Updated Solution

  • Exam (elaborations) • 70 pages • 2023
  • Available in package deal
  • Question 1: How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? A.) by certified mail B.) by overnight mail C.) by personal delivery D.) any of the above (Ans- D. A client may use the normal customer-service procedures agreed to between the client and the contractor, but the client must notify the contractor of the defect in writing by certified mail, overnight mail, or personal delivery before the client may file an action...
    (0)
  • $9.00
  • + learn more