Dosh - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Dosh? On this page you'll find 383 study documents about Dosh.
Page 4 out of 383 results
Sort by
-
PHR-CA Exam Questions With 100% Correct Answers Updated 2024/2025 (VERIFIED)
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $16.99
- + learn more
PHR-CA Exam Questions With 100% Correct Answers Updated 2024/2025 (VERIFIED) Exposure Records - Correct answer-Cal/OSHA standards concerning toxic substances 
and hazardous exposures require records of employee exposure to these substances 
and sources, physical examination reports, employment records, and other information 
No later than 8 hours - Correct answer-All fatalities and serious injuries and illnesses in 
California must be reported to the DOSH as soon as possible, but ___________ 
in...
-
PHR-CA Exam Questions With 100% Correct Answers Latest Updated 2024/2025 Graded A+
- Exam (elaborations) • 43 pages • 2024
-
- $17.49
- + learn more
PHR-CA Exam Questions With 100% Correct Answers Latest Updated 2024/2025 Graded A+. The 3 Model Workplace Injury and Illness Prevention Models - Correct answer-High 
Hazard, Non-HIgh Hazard, Employers with Intermittent Workers 
Exposure Records - Correct answer-Cal/OSHA standards concerning toxic substances 
and hazardous exposures require records of employee exposure to these substances 
and sources, physical examination reports, employment records, and other information 
No later than 8 hours ...
-
CSLB CONTRACTOR'S LAW & BUSINESS EXAM || WITH ERROR-FREE SOLUTIONS.
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $13.39
- + learn more
An employer remits State disability taxes withheld from an employees wages to what agency? correct answers Employment Development Department 
 
Which act establishes the rights of workers to organize into unions and negotiate contracts? correct answers National Labor Relations Act of 1935 
 
A contractor has had a problem with employees stealing tools and equipment from job sites. When conducting job interviews, may the contractor ask prospective employees about their arrest records? 
 
A. It ...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 68 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? 
: Discard the mortar 
What minimum time must you wait before caulking or grouting new tiles? 
: 24-48 Hours 
How long should you wait before installing tile on a shower pan? 
: 24 Hours 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive 
strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: 
: Type-B Soils 
If 65 street lights are fed by a 2275 volt serie...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 68 pages • 2024
- Available in package deal
-
- $13.89
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? 
: Discard the mortar 
What minimum time must you wait before caulking or grouting new tiles? 
: 24-48 Hours 
How long should you wait before installing tile on a shower pan? 
: 24 Hours 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive 
strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: 
: Type-B Soils 
If 65 street lights are fed by a 2275 volt serie...
Too much month left at the end of the money?
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM
- Exam (elaborations) • 43 pages • 2022
-
- $7.99
- 1x sold
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? - ANS - Discard the mortar 
What minimum time must you wait before caulking or grouting new tiles? - ANS - 24-48 Hours 
How long should you wait before installing tile on a shower pan? - ANS - 24 Hours 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater 
than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - ANS - Type-B Soils 
If 65 street lights are fed b...
-
PHR-CA Exam 2023/2024 With 100% Correct Answers.
- Exam (elaborations) • 43 pages • 2023
-
- $12.99
- + learn more
PHR-CA Exam 2023/2024 With 100% Correct Answers. 
The 3 Model Workplace Injury and Illness Prevention Models - Correct answer-High 
Hazard, Non-HIgh Hazard, Employers with Intermittent Workers 
Exposure Records - Correct answer-Cal/OSHA standards concerning toxic substances 
and hazardous exposures require records of employee exposure to these substances 
and sources, physical examination reports, employment records, and other information 
No later than 8 hours - Correct answer-All fatalities an...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM
- Exam (elaborations) • 24 pages • 2023
-
- $13.49
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? - Answer- Discard the mortar 
 
What minimum time must you wait before caulking or grouting new tiles? - Answer- 24-48 Hours 
 
How long should you wait before installing tile on a shower pan? - Answer- 24 Hours 
 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Answer- Type-B Soils 
 
If 65 street l...
-
Elevator Mechanic Study Exam| 225 QUESTIONS| WITH COMPLETE ANSWERS
- Exam (elaborations) • 22 pages • 2022
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
ASME Correct Answer: American Society of Mechanical Engineers 
 
DOSH Correct Answer: Division of Occupational Safety and Health 
 
LADBS Correct Answer: Los Angeles Department of Building and Safety 
 
Alteration made to conveyance shall comply with ASME A17.1-204 Section Correct Answer: 8.7 
 
The seismic section of ASME A17.1-2004 and alterations made to conveyances must also comply with this section Correct Answer: 8.4 
 
What must be submitted to the applicable Division Elevator office...
-
CSLB Law & Business Set 1: Questions & Answers: Updated Solution
- Exam (elaborations) • 70 pages • 2023
- Available in package deal
-
- $9.00
- + learn more
Question 1: 
How must a client submit a claim for service or repair of a defect on fit and finish items after a remodel? 
A.) by certified mail 
 
B.) by overnight mail 
 
C.) by personal delivery 
 
D.) any of the above 
(Ans- D. A client may use the normal customer-service procedures agreed to between the client and the contractor, but the client must notify the contractor of the defect in writing by certified mail, overnight mail, or personal delivery before the client may file an action...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia