Ifgc - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Ifgc? On this page you'll find 37 study documents about Ifgc.

Page 4 out of 37 results

Sort by

CSIA Exam IRC Open Book Portion, Exam Review questions and  answers, graded A+/
  • CSIA Exam IRC Open Book Portion, Exam Review questions and answers, graded A+/

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • CSIA Exam IRC Open Book Portion, Exam Review questions and answers, graded A+/ When did the I Codes first get published? - -1995 When was the International Code Council created? - -1994 What was the first I Code published? - -The International Plumbing Code What year did the first edition get started? - -1996 Are model codes typically developed by ordinance? - -Yes What is the special section added to the North Carolina Residential Code that does not appear in the model codes? - -A cha...
    (0)
  • $7.99
  • + learn more
2024 HVAC Contractor Test 1 Questions And Answers Rated A+ New Update Assured Satisfaction
  • 2024 HVAC Contractor Test 1 Questions And Answers Rated A+ New Update Assured Satisfaction

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • An air conditioning and refrigeration contracting company must notify the department of all licensees who have assigned their licenses to the company and must notify the department within how many calendar days when any license whose license is assigned to the company has left the company - Answer-30 calendar days within ___ hours after a death of any employee as a result of a work related incident, you must report the fatality to the occupational safety and health administration (OSHA), us...
    (0)
  • $6.69
  • + learn more
HVAC Contractor Test 1 Practice Questions and Answers (100% Pass)
  • HVAC Contractor Test 1 Practice Questions and Answers (100% Pass)

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • HVAC Contractor Test 1 Practice Questions and Answers (100% Pass) An air conditioning and refrigeration contracting company must notify the department of all licensees who have assigned their licenses to the company and must notify the department within how many calendar days when any license whose license is assigned to the company has left the company - Answer️️ -30 calendar days within ___ hours after a death of any employee as a result of a work related incident, you must report t...
    (0)
  • $9.99
  • + learn more
2018 International Fuel Gas Code PDF
  • 2018 International Fuel Gas Code PDF

  • Other • 191 pages • 2023
  • Available in package deal
  • 2018 International Fuel Gas Code PDF: The Comprehensive Guide for Safe and Efficient Gas Installations The 2018 International Fuel Gas Code (IFGC) is an essential document that provides the minimum safety requirements for the installation and maintenance of fuel gas systems in residential, commercial, and industrial buildings. Developed by the International Code Council (ICC), this code serves as a critical resource for engineers, architects, contractors, and inspectors, ensuring that fuel ga...
    (0)
  • $20.48
  • + learn more
 IFGC Test Exam Questions and Answers
  • IFGC Test Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • IFGC Test Exam Questions and Answers Excess Flow Valve - answersA valve designed to activate when the fuel gas passing through it exceeds a prescribed flow rate Category II - answersAn appliance that operates with a non-positive vent static pressure and with a vent gas temperature that is capable of causing excessive condensate production in the vent is a ______ appliance. 1/3 - answersHoles bored in a floor joist shall not exceed _____ their depth. 60% - answersBored holes shall n...
    (0)
  • $8.99
  • + learn more
559 Journeyman Mechanical Exam HVAC Complete Questions and Answers
  • 559 Journeyman Mechanical Exam HVAC Complete Questions and Answers

  • Exam (elaborations) • 4 pages • 2024
  • Which Type of air-conditoning system is most likely to leak refrigerant into a structure? Direct, Indirect, Evaporative or Split? - CORRECT ANSWER-Direct : 2015 IMC 1103.3.2 When mechanical equipment is located on a flat roof that is more than 30 inches above grade, how far from the roofs edge must the equipment be located before a guard rail is not needed? less than 6', 9', 4' or more than 10'? - CORRECT ANSWER-More than 10' - 2015 IMC 304.11 A mall bathroom exhaust outlet shal...
    (0)
  • $7.99
  • + learn more
OK HVAC Journeyman Test Latest Update Questions with Excellent Answers Download!!
  • OK HVAC Journeyman Test Latest Update Questions with Excellent Answers Download!!

  • Exam (elaborations) • 48 pages • 2024
  • OK HVAC Journeyman Test Latest Update Questions with Excellent Answers Download!! A- 1 foot (IFGC - Figure 503.6.4) - Answer -A Type B venting system must terminate at least __ above the flat roof through which it passes. A- 1 foot B- 2 feet C- 4 feet D- 5 feet A- 1 inch (IMC - TABLE 401.5) - Answer -What is the maximum opening in a grille protecting an intake on a commercial building? A- 1 inch B- 3/4 inch C- 1/4 inch D- 1/2 inch A- 1-1/2 inches (IMC - 307.2.3) - Answer -Contract...
    (0)
  • $7.59
  • + learn more