Cdt ex - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cdt ex? On this page you'll find 371 study documents about Cdt ex.
Popular textbooks 'Cdt ex'
CDT Exam Self-Practice Review Questions for Construction Document Technologist
Examreview
2 documents
All 371 results
Sort by
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 42 pages • 2024
-
- $14.49
- 2x sold
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - answerAnswer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usually bound wit...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024 Popular
- Available in package deal
-
- $15.49
- 2x sold
- + learn more
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
-
CSI CDT Exam 2024 Questions and Answers 100% Correct
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $11.99
- 2x sold
- + learn more
CSI CDT Exam 2024 Questions and Answers 100% CorrectCSI CDT Exam 2024 Questions and Answers 100% CorrectCSI CDT Exam 2024 Questions and Answers 100% Correct 
Owner - ANSWER-Principle stakeholder - initiates project, assumes risk, provides funding 
 
AHJ - Authorities Having Jurisdiction - ANSWER-Protect public health, safety and welfare 
 
Design Team - ANSWER-Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, admini...
-
CSI CDT EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 14 pages • 2023
-
- $12.49
- 3x sold
- + learn more
Principle stakeholder - initiates project, assumes risk, provides funding - Answer- Owner 
 
Protect public health, safety and welfare - Answer- AHJ - Authorities Having Jurisdiction 
 
Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* - Answer- Design Team 
 
Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and ma...
-
CDT Exam Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
1. The method of computation of Contractor's overhead and profits for Change Order prices, where both 
additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - c) Specifications. 
3. The three essential considerations in the evaluation of...
Get paid weekly? You can!
-
CDT COMPREHENSIVE EXAM (LATEST 2nd cdt exam) 2024 QUESTIONS WITH 100% CORRECT SOLUTIONS.
- Exam (elaborations) • 7 pages • 2024
-
- $12.99
- 1x sold
- + learn more
CDT COMPREHENSIVE EXAM (LATEST 2nd cdt exam) 2024 QUESTIONS WITH 100% CORRECT SOLUTIONS.
-
Package deal FOR CDT EXAM QUESTIONS AND ANSWERS (DISTINCTION GUARANTEED)-DUE DATE; 5TH OCTOBER 2023.
- Package deal • 14 items • 2023
-
- $30.49
- 4x sold
- + learn more
CSI CDT EXAM 100% CORRECTLY ANSWERED (2023/2024).
CDT CODES: EXAM 2 2023/2024.
CDT EXAM ORTHO {WITH CORRECT ANSWER} DUE 5TH OCTOBER 2023.
CDT EXAM QUESTIONS AND ANSWERS (DISTINCTION GUARANTEED)-DUE DATE; 5TH OCTOBER 2023.
CDT EXAM PREP QUESTIONS AND ANSWERS (100% CORRECT).
CDT (CERTIFIED DOCUMENT TECHNOLOGIST) EXAM UPDATED.
CDT PRACTICE EXAM (WITH

-
CSI CDT EXAM WITH 100% CORRECT ANSWER.
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $15.99
- 2x sold
- + learn more
CSI CDT EXAM WITH 100% CORRECT ANSWER. 
Stages of Facility Life Cycle - CORRECT ANSWER-1. Project Conception 2. Design 3. Construction Documents, 4. Procurement 5. Construction 6. Facility Management 
Quality Assuance - CORRECT ANSWER-Procedures for guarding against defects and during execution of work (by A/E) *PRECONSTRUCTION* 
Quality Control - CORRECT ANSWER-Procedures for evaluating completed activities and elements of the design for conformance with requirements (by Contractor) 
Stages of ...
-
CDT Exam 2 2024 Questions Graded A+
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
CDT Exam 2 2024 Questions Graded A+ 
 
 
What is Dual Nature of design? - ANSWERSAesthetic and Technical Design 
 
Hard Costs - ANSWERSTangible components of completed projects 
 EX: Site related costs, construction, furniture/furnishings, equipment 
*Included in the PROJECT BUDGET 
 
Soft Costs - ANSWERSNon-Tangible components of completed projects. 
EX: Due Diligence, Project Design Fees, Commissioning, Jurisdictional Fees, Relocation, Terminating Leases and Rental Agreements 
*Included in t...
-
CDT Exam 2018 Prep Questions & Answers 2024/2025
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
CDT Exam 2018 Prep Questions & Answers 2024/2025 
 
 
If the contractor is delayed in the progress of the Work by Owner, he should: 
a. Write Architect/Engineer protesting the changes 
b. Notify his bonding company 
c. Write the Architect/Engineer requesting a change order granting an extension of time 
d. Stop the Work until Owner makes up his mind. 
 
Review: AIA A201 8.3 , EJCDC C-700 Article 12 - ANSWERSc. Write the Architect/Engineer requesting a change order granting an extension of time...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia