Etops - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Etops? On this page you'll find 43 study documents about Etops.

All 43 results

Sort by

ETOPS 2 Question and answers rated A+ 2024/2025
  • ETOPS 2 Question and answers rated A+ 2024/2025

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • ETOPS 2 Question and answers rated A+ 2024/2025 ETOPS 2 Discuss FAR 91.703 regarding international flying. - correct answer Ensures that the Rules of the Air are binding to operators of U.S.-registered aircraft operating outside the United States, and it is the aviation authority's (AA) responsibility to ensure that pilots of U.S. registered aircraft comply with these regulations. ORCOM Ch. 2 1-1 NOTE: 135.3 also talks about this regulation. Discuss FAR 121.11 regarding intern...
    (0)
  • $13.49
  • + learn more
ETOPS Question and answers already passed 2024/2025
  • ETOPS Question and answers already passed 2024/2025

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • ETOPS Question and answers already passed 2024/2025 ETOPS For ETOPS alternates, weather minima must be ensured during a certain time period: - correct answer Validity begins at the earliest ETA for an ETOPS Alternate airport and ends at the latest ETA for that airport. ETP - correct answer The Equal Time Point A point on the route of flight where the flight time, considering wind, to each of the two ETOPS Alternate airports is equal. 60 Minute Rule - correct answer All aircraft...
    (0)
  • $14.19
  • + learn more
ETOPS Question and answers 100% correct 2024/2025
  • ETOPS Question and answers 100% correct 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • ETOPS Question and answers 100% correct 2024/2025 ETOPS ETOPS is what? - correct answer An area of operations where any point is greater that 60 minutes from an adequete airport one with one engine inop cruise speed in still air. What is the point of ETOPS? - correct answer to have a diversion plan in place with the shortest possible diversion time What is an adequate airport? - correct answer an airport that has landing limitations of par 121.197 and is a part 139 airport. Wh...
    (0)
  • $13.99
  • + learn more
ETOPS A320 Air Astana Question and answers already passed 2024/2025
  • ETOPS A320 Air Astana Question and answers already passed 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • ETOPS A320 Air Astana Question and answers already passed 2024/2025 ETOPS A320 Air Astana (AA) ETOPS (EDTO) approval is certified in the Air Astana AOC issued by the RoK CAC. - correct answer Where is the AA ETOPS approval endorsed? P4-OAS, P4-NAS, P4-VAS, P4-YAS - correct answer Which aircraft are NOT approved for ETOPS? ETOPS maximum diversion time is 120 minutes. - correct answer What is the AA approved EDTO (ETOPS maximum diversion time)? I.S.A, No Wind conditions. - corre...
    (0)
  • $13.49
  • + learn more
ETOPS Question and answers correctly solved 2024/2025
  • ETOPS Question and answers correctly solved 2024/2025

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • ETOPS Question and answers correctly solved 2024/2025 ETOPS/EDTO ETOPS - correct answer Extended-range Twin-engine Operational Performance Standards A set of rules and procedures for airline manufacturers, airlines and their pilots to fly further than 60 minutes over land or water away from a diversion airfield Advantages of ETOPS - correct answer More direct routes which save time and money for both the airlines and it's passengers, as well as reducing the fuel burn with associ...
    (0)
  • $13.49
  • + learn more
OCEANIC and ETOPS Question and answers  already passed 2024/2025
  • OCEANIC and ETOPS Question and answers already passed 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • OCEANIC and ETOPS Question and answers already passed 2024/2025 OCEANIC and ETOPS When VHF or HF is used to obtain an oceanic clearance, the Flight Crew will establish contact with the oceanic ATS unit and state: - correct answer 1. ETA for Oceanic Entry Point (OEP); and 2. Requested track; and 3. Requested altitude; and 4. Highest acceptable Flight Level that can be maintained at oceanic entry; and 5. Requested Mach number; and 6. "Standing by for oceanic clearance." T...
    (0)
  • $13.99
  • + learn more
ETOPS Question and answers verified to pass 2024/2025
  • ETOPS Question and answers verified to pass 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • ETOPS Question and answers verified to pass 2024/2025 ETOPS In-flight prior to operate beyond EEP, check: - correct answer - Availability of ETOPS ERAs - WX conditions at the ETOPs ERA's ≥ applicable landing minima including CAT II (III) - Aircraft technical status - Fuel remaining Note: If safe approach and landing is not assured take appropriate action so approved diversion time is not exceeded. Note: Actual diversion is not restricted to the nominated ETOPS ERA's sele...
    (0)
  • $12.99
  • + learn more
ETOPS Question and answers already passed 2024/2025
  • ETOPS Question and answers already passed 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • ETOPS Question and answers already passed 2024/2025 ETOPS When was the first approved ETOPS flight - correct answer 1985 What is ETOPS - correct answer Extended Operations When does ETOPS begin and end - correct answer At the EEP/EXP which are located at 60 minutes past the closest Adequate airport and 60 minutes prior to the next closest adequate airport What ETOPS approval do we have - correct answer 180 Min What is a Validity Period - correct answer Time between the ...
    (0)
  • $12.49
  • + learn more
ETOPS  Question and answers already passed 2024/2025
  • ETOPS Question and answers already passed 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • ETOPS Question and answers already passed 2024/2025 ETOPS ETOPS Extended Twin Operations - correct answer Twin-engine turbine a/c More than 60 minutes From Adequate Airport EO CRZ SPD Still air ISA ETOPS Entry Point (EEP) - correct answer START of ETOPS 60 min Still Air ISA EO Conditions
    (0)
  • $13.99
  • + learn more