Gable - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Gable? On this page you'll find 337 study documents about Gable.

All 337 results

Sort by

MONOGRÁFICO CONVERSIÓN A NAVEGABLE PALAMÓS DE OCCRE ESTÁTICO
  • MONOGRÁFICO CONVERSIÓN A NAVEGABLE PALAMÓS DE OCCRE ESTÁTICO

  • Other • 41 pages • 2024
  • Tutorial en PDF de 42 páginas a todo color completo para poder adaptar el kit de este barco en principio estático de la marca OCCRE, a radio-control. El archivo incluye paso a paso con fotografías y explicaciones en castellano y plano complementario a los incluidos en la caja de montaje, donde figuran las modificaciones para la adaptación a navegable. Ya no se edita. Tamaño del archivo: 25,9 MB
    (0)
  • $10.38
  • + learn more
WRITING ABOUT GRAPHS, TABLES AN D DIAGRAMS Gabi Duigu
  • WRITING ABOUT GRAPHS, TABLES AN D DIAGRAMS Gabi Duigu

  • Exam (elaborations) • 68 pages • 2024
  • WRITING ABOUT GRAPHS, TABLES AN D DIAGRAMS Gabi Duigu
    (0)
  • $7.99
  • + learn more
insurance adjusting Questions and  Answers (100% Pass)
  • insurance adjusting Questions and Answers (100% Pass)

  • Exam (elaborations) • 37 pages • 2024
  • Available in package deal
  • 10% removal squares by 1.10 Gable roofs have what waste factor so multiply what by what? 15% removal squares by 1.15 Hip roofs have what waste factor so multiply what by what? .33, .67, or whole number Always round composition and laminate shingle replacement to? .25, .50, .75, or whole number Always round wood shingle replacement to? Up- eave to ridge + eave to ridge Over- length of ridge Gable roof square footage calculated by up and over explain? Up- eave to ridge + eave to ri...
    (0)
  • $13.49
  • + learn more
Branch 3 Field Rep: Construction & Repair Latest 2024 Graded A+
  • Branch 3 Field Rep: Construction & Repair Latest 2024 Graded A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • Branch 3 Field Rep: Construction & Repair Latest 2024 Graded A+ Dormer A dormer is a structural element of a building that protrudes from the plane of a sloping roof surface. Dormers are used, either in original construction or as later additions, to create usable space in the roof of a building by adding headroom and usually also by enabling addition of windows. Roof Types Lean-to Gable Hip Lean-to A lean-to is a type of simple structure originally added to an existing building w...
    (0)
  • $9.99
  • + learn more
MICHIGAN ROOFING EXAM PREP QUESTIONS with correct answers
  • MICHIGAN ROOFING EXAM PREP QUESTIONS with correct answers

  • Exam (elaborations) • 5 pages • 2023
  • Available in package deal
  • The minimum crawl space ventilation required is 1 square foot per each ______ square feet of under floor space without a vapor barrier. 150 A ventilating opening within a crawl space shall be located within __________ of each corner of a building. 3 feet An access opening to a crawl space through a perimeter wall shall be a minimum size of 16" x 24" According to code, wood beams, rafters, and joists may NOT be notched in the middle 1/3 Truss design drawings shal...
    (0)
  • $12.99
  • 1x sold
  • + learn more
Illinois Roofing Exam UPDATED ACTUAL  Exam Questions and CORRECT Answers
  • Illinois Roofing Exam UPDATED ACTUAL Exam Questions and CORRECT Answers

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • Illinois Roofing Exam UPDATED ACTUAL Exam Questions and CORRECT Answers How many eaves does a gable roof have ? - CORRECT ANSWER- 2 How many rakes does a gable roof have ? - CORRECT ANSWER- 4 Does a hip roof have any rakes ? - CORRECT ANSWER- No
    (0)
  • $9.49
  • + learn more
Xactimate Level 2 Cert Knowledge Latest Verified 100%.
  • Xactimate Level 2 Cert Knowledge Latest Verified 100%.

  • Exam (elaborations) • 4 pages • 2023
  • When working on multiple estimates in the same city/state/zip, you can set up Project Loss Defaults for that city/state/zip to save time. - True Where in Xactimate can you go to change the default wall thickness for all future estimates? - Control Center/Preferences This is a shortcut used in Model Statements to pre-fill data that has already been recorded in an estimate. - Token Which of the following is not an option through the Contact Manager? - Users You can data transfer an est...
    (0)
  • $10.39
  • 2x sold
  • + learn more
Professional Home Inspector Exam NHIE / TREC Questions with correct Answers
  • Professional Home Inspector Exam NHIE / TREC Questions with correct Answers

  • Exam (elaborations) • 43 pages • 2023
  • Available in package deal
  • The inspector is not required to determine ____ ___ of any system or component. - Answer- -Years of age -Life expectancy -Make model Horizontal waste pipe should slope ____ inch per foot - Answer- 1/4" per foot if < 3 inch pipe. 1/8" per foot if > or = to 3 inch pipe Drip screed - Answer- Also called weep screed. Used at the base/bottom of stucco walls to release moisture. Pressure Vacuum Breaker (PVB) - Answer- Used for Backflow Prevention. Lawn Irrigation systems: install...
    (1)
  • $15.49
  • 1x sold
  • + learn more
Professional Home Inspector Exam NHIE  / TREC Questions and Answers  Rated A+
  • Professional Home Inspector Exam NHIE / TREC Questions and Answers Rated A+

  • Exam (elaborations) • 105 pages • 2024
  • Professional Home Inspector Exam NHIE / TREC Questions and Answers Rated A+ The inspector is not required to determine ____ ___ of any system or component. -Years of age -Life expectancy -Make model Horizontal waste pipe should slope ____ inch per foot 1/4" per foot if < 3 inch pipe. 1/8" per foot if > or = to 3 inch pipe Drip screed Also called weep screed. Used at the base/bottom of stucco walls to release moisture. Pressure Vacuum Breaker (PVB) Used for Backflow...
    (0)
  • $12.49
  • + learn more