Iron triangle of pm - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Iron triangle of pm? On this page you'll find 25 study documents about Iron triangle of pm.

All 25 results

Sort by

APM PMQ Revision questions well answered graded A+ 2023/2024
  • APM PMQ Revision questions well answered graded A+ 2023/2024

  • Exam (elaborations) • 47 pages • 2024
  • Available in package deal
  • APM PMQ Revision 1.1 differentiate between types of permanent and temporary organisation structures (including functional, matrix, and project) - correct answer Intro Func: Best for small projs close to BAU ops. Matrix: Best for balancing change initiatives with BAU. Good if more project process is needed. Proj: Best larger, complex projs with multi parties involved. Authority Func: Func Man overall responsibility for proj delivery. Someone from department plasy role of PM. Matrix: PM re...
    (0)
  • $25.59
  • + learn more
 PMBOK 6- Project Management Fundamentals Study Questions with Answers
  • PMBOK 6- Project Management Fundamentals Study Questions with Answers

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • Iron Triangle (Triple Constraints) 1) Time 2) Cost 3) Scope (Quality in the middle) System Dynamics Relationships between components/departments Iterative and Incremental Life Cycles A high-level upfront scope with cost and schedule developed over iterations of planning; Phases repeat through iteration; iterations create deliverables; detailed scope for each iteration; change expected Progressive Elaboration The iterative process of increasing the level of detail in a project managem...
    (0)
  • $8.99
  • + learn more
CAPM EXAM QUESTIONS WITH 100% CORRECT ANSWERS GRADED A+
  • CAPM EXAM QUESTIONS WITH 100% CORRECT ANSWERS GRADED A+

  • Exam (elaborations) • 11 pages • 2024
  • CAPM EXAM QUESTIONS WITH 100% CORRECT ANSWERS GRADED A+
    (0)
  • $13.99
  • + learn more
ITPM Exam Complete Questions with 100% Correct Answers
  • ITPM Exam Complete Questions with 100% Correct Answers

  • Exam (elaborations) • 16 pages • 2024
  • ITPM Exam Complete Questions with 100% Correct Answers Project portfolio a portfolio is a grouping of projects and programs, with potentially unrelated goals, but linked by resources and/or governance. Project A project is a sequence of unique, complex, and connected activities that have one goal or purpose and that must be completed by a specific time, within budget, and according to specification. Temporary program Programs are groups of projects that are linked through their man...
    (0)
  • $12.50
  • + learn more
AMSCO APUSH Chapter 1-15 Study Guide with Complete Solutions
  • AMSCO APUSH Chapter 1-15 Study Guide with Complete Solutions

  • Exam (elaborations) • 32 pages • 2024
  • Available in package deal
  • AMSCO APUSH Chapter 1-15 Study Guide with Complete Solutions American Indian Societies 1491 - Answer️️ -Some time between 10,000 and 40,000 years ago, people may have migrated from Asia to the Americas, across a land bridge that connected Siberia and Alaska. Over a long period of time, successive generations migrated southward to the southern tip of South America. They evolved to hundreds of tribes, spoke different languages, and practiced different cultures. In the 1490s it is estima...
    (0)
  • $12.49
  • + learn more
APM PMQ Revision Exam Questions with All Correct Answers
  • APM PMQ Revision Exam Questions with All Correct Answers

  • Exam (elaborations) • 43 pages • 2023
  • Available in package deal
  • APM PMQ Revision Exam Questions with All Correct Answers 1.1 differentiate between types of permanent and temporary organisation structures (including functional, matrix, and project) - CORRECT ANSWER Intro Func: Best for small projs close to BAU ops. Matrix: Best for balancing change initiatives with BAU. Good if more project process is needed. Proj: Best larger, complex projs with multi parties involved. Authority Func: Func Man overall responsibility for proj delivery. Some...
    (0)
  • $12.99
  • + learn more
D204 Data Analytics with 100% correct answers 2023
  • D204 Data Analytics with 100% correct answers 2023

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • Which activity does an analyst perform in the discovery phase? Identifying business needs 3 MULTIPLE CHOICE OPTIONS What a potential problem to consider in the business understanding phase? Lack of clear focus on stakeholders, timeline, limitations, and budget In which phase does the analyst identify the stakeholders and research questions? Business understanding 3 MULTIPLE CHOICE OPTIONS In which phase does an analyst build a histogram? Data exploration 3 MULTIPLE CH...
    (0)
  • $14.49
  • + learn more
PLSI 2 Exam #4 Practice Questions and Answers (100% Pass)
  • PLSI 2 Exam #4 Practice Questions and Answers (100% Pass)

  • Exam (elaborations) • 6 pages • 2024
  • PLSI 2 Exam #4 Practice Questions and Answers (100% Pass) The oppressive mission system in California was officially disbanded by the Mexican government with the: - Answer️️ -1833 Secularization Act An Issue Network, such as the one that stopped the development of Jesse Morrow Mountain (aka Wahallish) off Hwy 180, differs from an Iron Triangle because it includes grass-roots interests and ordinary citizens: - Answer️️ -false A political party other than the two major political pa...
    (0)
  • $11.49
  • + learn more
APM PMQ EXAM Revision 100 %  VERIFIED SOLUTIONS  LATEST UPDATED 2023
  • APM PMQ EXAM Revision 100 % VERIFIED SOLUTIONS LATEST UPDATED 2023

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • APM PMQ EXAM Revision 100 % VERIFIED SOLUTIONS LATEST UPDATED 2023 1.1 differentiate between types of permanent and temporary organisation structures (including functional, matrix, and project) - ANSWER Intro Func: Best for small projs close to BAU ops. Matrix: Best for balancing change initiatives with BAU. Good if more project process is needed. Proj: Best larger, complex projs with multi parties involved. Authority Func: Func Man overall responsibility for proj delivery. Someon...
    (0)
  • $13.99
  • + learn more
CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 71 pages • 2024
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers What Is a pre-solicitation notice? - CORRECT ANSWER The pre-solicitation notice helps government agencies determine if there are qualified vendors to perform the work scope. It provides a "heads up" that the solicitation will be released and solicits capability responses from responsible vendors. The pre-solicitation notice also helps the government determine if the requirement can be set-aside for a small business if capable ...
    (0)
  • $12.99
  • + learn more