Nccco correct stuvia - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco correct stuvia? On this page you'll find 25 study documents about Nccco correct stuvia.
All 25 results
Sort by
-
NCCCO CORE CORRECT QUESTIONS & ANSWERS 100% ACCURATE
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines 
 
How many randomly broken wires in a lay length must there be on a mo...
-
NCCCO MOBILE CRANE QUESTIONS & ANSWERS CORRECT 100%
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - ANSWER c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - ANSWER a. 
 
 
9. Which area do truck cranes without a 5th outrigger gener...
-
NCCCO Core Questions & correct answers(graded A+)
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
The term "Superstructure or Upper works" refers to the area of the crane: - ANSWER Above the swing circle 
 
A crane must be level within _______% for the load chart ratings to be valid? - ANSWER 1% 
 
On what principle is crane stability based? - ANSWER Leverage 
 
What would be the effect of moving the tipping axis closer to the cranes center of gravity? - ANSWER Reduced stability 
 
Which of the following matches the appropriate load chart to a particular crane? - ANSWER Serial number 
 
Wh...
-
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A 
 
How does the operator determine the manufacturers recommended rope for the crane? 
A. count the sheav...
-
NCCCO Exam Questions and Answers 100% Correct
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO Exam Questions and Answers 100% CorrectNCCCO Exam Questions and Answers 100% CorrectNCCCO Exam Questions and Answers 100% CorrectNCCCO Exam Questions and Answers 100% Correct 
Boom up - ANSWER - What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - ANSWER - When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings...
And that's how you make extra money
-
NCCCO CORE Correct Questions & Answers(RATED A+)
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWERKeeping 90 degree angle between cylinder rod and pad 
 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWERSeparate the boom hoist lines 
 
How many randomly broken wires in a lay length must there be on a mobil...
-
NCCCO test #3 CORRECT QUESTIONS & ANSWERS(GRADED A+)
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
The crane is out of level, you release the swing break, the boom swings downhill, your: - ANSWER Load radius increases 
 
Blocking can be placed under the ends of tracks to: - ANSWER Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least amount of ground pressure on a lattice crawler: - ANSWER Side 
 
On lattice boom crane's fitted with power load Lowering , a heavy load should be lowered by using the: - ANSWER Power Load-lowering feature and the foo...
-
NCCCO PREP Questions & Answers 100% Correct!!
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
To provide protection in the cranes work area, barriers MUST be erected in accessible areas; - ANSWERWithin the equipment's rotating structure 
 
All of the following can cause a two-block condition except: - ANSWERRaising the boom 
 
When rotation of load may be hazardous, the operator must - ANSWEREnsure tag line is used 
 
According to OSHA 1926 Subpart cc, which of the following individuals is not allowed within the fall zone? - ANSWERQualified evaluator 
 
The term that is used to define...
-
NCCCO RIGGING 1 & 2 Correct Questions & Answers(RATED A+)
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
OSHA 1910 - ANSWERGeneral Industry Standards 
 
OSHA 1910.180 - ANSWERCrawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - ANSWERSlings 
 
OSHA 1926.251 - ANSWERRigging Equipment used for material handling 
 
OSHA 1926 - ANSWERConstruction Industry Standards 
 
OSHA 1926.1400 - ANSWERCranes and Derricks used in construction 
 
ASME B30.3 - ANSWERTower Cranes 
 
ASME B30.5 - ANSWERMobile and Locomotive Cranes 
 
ASME B30.9 - ANSWERSlings
-
NCCCO Practice Correct Questions & Answers (RATED A+)
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWERA 
 
How does the operator determine the manufacturers recommended rope for the crane? 
A. count the sheave...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia