Lote
NERC Bundled Exams with Complete Solution | Verified by Experts | Download to Score A
NERC Bundled Exams with Complete Solution | Verified by Experts | Download to Score A
[Mostrar más]NERC Bundled Exams with Complete Solution | Verified by Experts | Download to Score A
[Mostrar más]You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due 
to a large loss of load in the contingent BA. If your generator governor control systems 
responded to the frequency deviation approximately how much of a generation change would 
you BA experience? - Ans...
Vista previa 3 fuera de 18 páginas
Añadir al carritoYou are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due 
to a large loss of load in the contingent BA. If your generator governor control systems 
responded to the frequency deviation approximately how much of a generation change would 
you BA experience? - Ans...
A Balancing Authority notices that Operating Reserve has steadily declined throughout 
the hour. What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS -Answer b) An inaccurate load forec...
Vista previa 2 fuera de 7 páginas
Añadir al carritoA Balancing Authority notices that Operating Reserve has steadily declined throughout 
the hour. What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS -Answer b) An inaccurate load forec...
Common standard time period for station battery to handle outage of AC power to chargers - 
Answer 8-12 hours 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed 
unsuccessful -Answer 2 hours 
Transition period to backup control facility (fully functioning) -Answer ...
Vista previa 2 fuera de 10 páginas
Añadir al carritoCommon standard time period for station battery to handle outage of AC power to chargers - 
Answer 8-12 hours 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed 
unsuccessful -Answer 2 hours 
Transition period to backup control facility (fully functioning) -Answer ...
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 
1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All au...
Vista previa 4 fuera de 57 páginas
Añadir al carrito1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 
1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All au...
The Reliability Coordinator just informed you of a slow time error correction which will begin at 
the top of the next hour. Your EMS system will not let you change your scheduled frequency. 
Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
A) Increase Net Interchange Sched...
Vista previa 4 fuera de 78 páginas
Añadir al carritoThe Reliability Coordinator just informed you of a slow time error correction which will begin at 
the top of the next hour. Your EMS system will not let you change your scheduled frequency. 
Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
A) Increase Net Interchange Sched...
A transmission line is operating with a voltage phase angle different of 30 degrees between the 
sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage 
phase angle difference will be? -Answer The phase angle will increase. When load is 
increased phase ang...
Vista previa 3 fuera de 26 páginas
Añadir al carritoA transmission line is operating with a voltage phase angle different of 30 degrees between the 
sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage 
phase angle difference will be? -Answer The phase angle will increase. When load is 
increased phase ang...
When current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
a) half as much 
b) does not change 
c) doubles 
d) four times greater -Answer d) four times greater 
What determines the size of insulators used on power lines? 
a) Current flow on the line 
b) Voltage...
Vista previa 4 fuera de 32 páginas
Añadir al carritoWhen current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
a) half as much 
b) does not change 
c) doubles 
d) four times greater -Answer d) four times greater 
What determines the size of insulators used on power lines? 
a) Current flow on the line 
b) Voltage...
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual 
hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% -Answer B. 10% 
Dry steam plants, flash steam plants, and binary cycle power...
Vista previa 4 fuera de 79 páginas
Añadir al carritoWhen using a dynamic schedule and the energy profile in an hour is >250 MW and the actual 
hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% -Answer B. 10% 
Dry steam plants, flash steam plants, and binary cycle power...
What percentage of load gives a 1 Hz change in an island condition? -Answer 6-10% (Think 6- 
10 day island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? -Answer Nothing! ACE 
bias and interchange schedule will improve frequency 
If ACE is Zero, why not adjust gene...
Vista previa 3 fuera de 22 páginas
Añadir al carritoWhat percentage of load gives a 1 Hz change in an island condition? -Answer 6-10% (Think 6- 
10 day island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? -Answer Nothing! ACE 
bias and interchange schedule will improve frequency 
If ACE is Zero, why not adjust gene...
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing 
Authority is not permitted to provide which of the following for any other Balancing Authority 
entities? -Answer Regulation of other services related to control performance 
1. It is the obligation of eac...
Vista previa 4 fuera de 44 páginas
Añadir al carritoIf a Balancing Authority does not comply with the Control Performance Standard, the Balancing 
Authority is not permitted to provide which of the following for any other Balancing Authority 
entities? -Answer Regulation of other services related to control performance 
1. It is the obligation of eac...
A misoperation occurred when an overhead ground wire on a 230KV transmission line between 
two substations broke and fell across A phase of the line. One of the line circuit breakers failed 
to open causing the breaker failure relay to pick up and as a result tripped the entire substation 
bus off l...
Vista previa 3 fuera de 18 páginas
Añadir al carritoA misoperation occurred when an overhead ground wire on a 230KV transmission line between 
two substations broke and fell across A phase of the line. One of the line circuit breakers failed 
to open causing the breaker failure relay to pick up and as a result tripped the entire substation 
bus off l...
At what torque angle of operation does power typically begin to flow from the generator to the 
system? 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees -Answer 10 degrees 
Choose the answer that best describes the operation of a rotor. 
A) The stationary part of the transmission system. ...
Vista previa 3 fuera de 21 páginas
Añadir al carritoAt what torque angle of operation does power typically begin to flow from the generator to the 
system? 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees -Answer 10 degrees 
Choose the answer that best describes the operation of a rotor. 
A) The stationary part of the transmission system. ...
According to Nerc Standards, an emergency interchange transaction can be exempt from 
tagging if it is less than_________________ -Answer 60 minutes 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC 
within how many days -Answer 2 business days 
During restor...
Vista previa 2 fuera de 9 páginas
Añadir al carritoAccording to Nerc Standards, an emergency interchange transaction can be exempt from 
tagging if it is less than_________________ -Answer 60 minutes 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC 
within how many days -Answer 2 business days 
During restor...
CIP-002 - BES Cyber System Categorization 
CIP-003 - Security Management Controls 
CIP-004 - Personnel and Training 
CIP-005 - Electronic Security Perimeter 
CIP-006 - Physical Security of BES Cyber Systems 
CIP-007 - System Security Management 
CIP-008 - Incident Reporting and Response Planning 
CI...
Vista previa 1 fuera de 4 páginas
Añadir al carritoCIP-002 - BES Cyber System Categorization 
CIP-003 - Security Management Controls 
CIP-004 - Personnel and Training 
CIP-005 - Electronic Security Perimeter 
CIP-006 - Physical Security of BES Cyber Systems 
CIP-007 - System Security Management 
CIP-008 - Incident Reporting and Response Planning 
CI...
EDE - Energy Deficient Entity 
Ime - meter error 
DCS - Disturbance Control Standard 
DFRs - Digital Fault Recorder 
LOFT - Linear on the fly testing 
SCADA - Supervisory Control and Data Acquisition 
EMS - Emergency Management System 
SPS - Special Protection Systems 
ACE - Area Control Error 
Fs -...
Vista previa 2 fuera de 7 páginas
Añadir al carritoEDE - Energy Deficient Entity 
Ime - meter error 
DCS - Disturbance Control Standard 
DFRs - Digital Fault Recorder 
LOFT - Linear on the fly testing 
SCADA - Supervisory Control and Data Acquisition 
EMS - Emergency Management System 
SPS - Special Protection Systems 
ACE - Area Control Error 
Fs -...
System studies identify what -Answer Predict operations and identify constraints 
If ACE remains the same and frequency goes up what has happened? -Answer Someone lost 
load 
When a generator has its AVR in service it is a? -Answer Dynamic source of reactive power 
Black start resource testing is do...
Vista previa 2 fuera de 6 páginas
Añadir al carritoSystem studies identify what -Answer Predict operations and identify constraints 
If ACE remains the same and frequency goes up what has happened? -Answer Someone lost 
load 
When a generator has its AVR in service it is a? -Answer Dynamic source of reactive power 
Black start resource testing is do...
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads -AnswerD. Interruptible loads 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complying with DCS as if it was a single control ...
Vista previa 4 fuera de 33 páginas
Añadir al carritoOperating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads -AnswerD. Interruptible loads 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complying with DCS as if it was a single control ...
BAL-001-0.1a - Real Power Balancing Control Performance 
BAL-STD-002-0 - Operating Reserves (WECC) 
BAL-003-0.1b - Frequency Response and Bias 
BAL-004-0 - Time Error Correction 
BAL-004-WECC-01 - Automatic Time Error Correction 
BAL-005-0.1b - Automatic Generation Control 
BAL-006-2 - Inadvertent I...
Vista previa 2 fuera de 10 páginas
Añadir al carritoBAL-001-0.1a - Real Power Balancing Control Performance 
BAL-STD-002-0 - Operating Reserves (WECC) 
BAL-003-0.1b - Frequency Response and Bias 
BAL-004-0 - Time Error Correction 
BAL-004-WECC-01 - Automatic Time Error Correction 
BAL-005-0.1b - Automatic Generation Control 
BAL-006-2 - Inadvertent I...
Frequency Bias and Jointly Owned Units (JOU) -Answer BAs that use dynamic schedule or 
pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their bias setting. 
Frequency Bias and BA fr...
Vista previa 2 fuera de 14 páginas
Añadir al carritoFrequency Bias and Jointly Owned Units (JOU) -Answer BAs that use dynamic schedule or 
pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their bias setting. 
Frequency Bias and BA fr...
How Many Active Standards are in BAL (Resource and Demand Balancing) - Answer There 
are 8 Active Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to 
Enforcement 
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information ...
Vista previa 3 fuera de 17 páginas
Añadir al carritoHow Many Active Standards are in BAL (Resource and Demand Balancing) - Answer There 
are 8 Active Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to 
Enforcement 
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information ...
What group can approve a change in the Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working Group -Answer b. NERC Operating Committee 
What is the first thing an operato...
Vista previa 3 fuera de 18 páginas
Añadir al carritoWhat group can approve a change in the Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working Group -Answer b. NERC Operating Committee 
What is the first thing an operato...
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. 
What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS -Answer b) An inaccurate load forec...
Vista previa 2 fuera de 10 páginas
Añadir al carritoA Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. 
What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS -Answer b) An inaccurate load forec...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller AmazingGrace. Stuvia facilitates payment to the seller.
No, you only buy this summary for $40.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now