Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
Another Trojan Horse- Case Project Management Case Studies in Project, Program, and Organizational Project Management, ISBN: 9781118174296 5,05 €   Ajouter au panier

Cas

Another Trojan Horse- Case Project Management Case Studies in Project, Program, and Organizational Project Management, ISBN: 9781118174296

 20 vues  0 achat
  • Cours
  • Établissement
  • Book

This note includes my personal answer to cases in the book mentioned below: Milosevic, D. Z., Patanakul, P., & Srivannaboon, S. (2010). Case Studies in Project, Program, and Organizational Project Management. John Wiley and Sons Inc.

Aperçu 1 sur 3  pages

  • 13 février 2022
  • 3
  • 2017/2018
  • Cas
  • Dr. manahan
  • A
avatar-seller
CASE STUDIES IN PROJECT MANAGEMENT SYSTEMS 1



Another Trojan Horse
Stevan Jovanovic

I. PROBLEM & SOLUTION
Problem: One of the biggest challenges for this company was the change in mindset from an
operating company to a project management company. The transition from an operating company
to a project management company could result in difficulty when a person has spent their entire
career focusing on project execution. The tendency for that type of person might be to revert to
old ways.
Solution: They looked for the latest project management techniques and undergone four - day
training regarding Scope Management, Cost Management, Time Management, and Risk
Management to be equipped upon the execution of the plan.

II. EXECUTIVE SUMMARY

John Lackey received an award for Best Project Management of Utility Plant in the United States
in 2000 since the Trojan Nuclear Plant, was formally shut down in 1996. To begin with, when it
comes to shutting down a nuclear plant, removing it, and placing it in an area for safety in the
future, it was easier said than done. However, it needs to be at least relocated since the plant was
near a city that could cause harm to the people living within and near the area. The nuclear plant
was named Trojan and was considered the largest and most powerful nuclear plant of its day and
it would need to undergo decommissioning since it was an essential part of the plant lifecycle.
Thus, it would require a carefully planned project whereas every tiny detail must be calculated,
studied, and revised to increase the percentage of success of the project before it could be executed.
There was no room for errors in this project due to its potential harm, thus, the project would be
examined not only by the authorities but by the general public as well. John and his company have
undergone a four-day training course to ensure that they are equipped to complete the project. To
start with the decommissioning of the plant, the project was broken down into smaller projects so
that they could apply their newly acquired skills in project management. One of the projects was
the elimination of the central reactor which includes relocating the entire reactor hundreds of miles
from the plant location. It was the first attempt and would be the biggest and most complicated
whereas the safest way to eradicate the reactor was in one piece carefully without damaging any
part of the reactor. Fortunately, they succeeded in safely lifting the reactor and placing it at its final
destination. They managed every detail of the move and the move was a success. Thus, the team
and the company had made their spot on the pages of project management history.

III. BRIEF HISTORY

John Lackey received an award for Best Project Management of Utility Plant in the United
States in 2000 since the Trojan Nuclear Plant, was formally shut down in 1996. To begin with,
when it comes to shutting down a nuclear plant, removing it, and placing it in an area for safety in
the future, it was easier said than done. However, it needs to be at least relocated since the plant
was near a city that could cause harm to the people living within and near the area. The nuclear
plant was named Trojan and was considered the largest and most powerful nuclear plant of its day
and was located on a huge site that sustained lots of equipment. However, it still needs to undergo

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur GelC. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour 5,05 €. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

73091 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
5,05 €
  • (0)
  Ajouter