NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+
22 vues 1 fois vendu
Cours
NERC
Établissement
NERC
NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the
Disturbance Recovery Period for an Interconnection?
a. NERC Interconnection Working Group
b. NERC Operating Committee
c. NERC Regional Council
d. NERC Disturbance Analysis Working Group
...
b. NERC Operating Committee - What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE that the transmission path is out of service c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency calculations, and all ________ must be metered. a. Communications b. Transformers c. Tie Lines d. Generation c. Energy Emergency Alert Level I - What Energy Alert Level would the following example be categorized as? "A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is experiencing conditions where all available resources are committed to meet firm load, firm transactions, etc, and requests an Energy Emergency Alert." NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+ a. Energy Emergency Alert Level IV b. Energy Emergency Alert Level III c. Energy Emergency Alert Level I d. Energy Emergency Alert Level II b. Implement the appropriate congestion management procedure. - You are a Reliability Coordinator in the Eastern Interconnection. A flow gate has become overloaded because a parallel 345kV line has relayed out and part of that load has transferred over to the flow gate causing an SOL and possible IROL violation. What would you do to relieve this violation? a. Notify another Reliability Coordinator and ask them if they are having any problem, and what should you do. b. Implement the appropriate congestion management procedure. c. Issue a Transmission warning to the Transmission Operators that lost the 345kV line. d. Place the line back in service within 30 minutes. b. Adjacent Balancing Authorities - Interchange schedules may be implemented between _______________________. a. Source and Sink Balancing Authorities b. Adjacent Balancing Authorities c. Sending, Receiving and Intermediate Balancing Authorities in the same Region. d. Balancing Authorities in the same Interconnection. a. Frequency will continue to drop, generator governor response, decrease in load. - When the frequency of an Interconnection decreases due to the loss of a large generator, the ________________ until the combination of both ____________ and ______________ replace the output of the lost generator. a. Frequency will continue to drop, generator governor response, decrease in load b. Frequency will continue to drop, generator governor response, voltage regulating transformer response c. Voltage will continue to raise, generator AVR response, voltage regulating transformer response d. Voltage will continue to raise, generator AVR response, decrease in load a. That all involved reliability entities determined that there is no reliability problems with the Arranged Interchange. - In developing and setting up an Arranged Interchange, which of the following would transition the Arranged Interchange to the Confirmed Interchange status? a. That all involved reliability entities determined that there is no reliability problems with the Arranged Interchange. b. The Department of Energy (DOE) made an in-depth study of the Interchange Agreement and determined that it would have an adverse affect on the Interconnection. c. There are available resources to meet the load. d. All parties involved realized that they would not lose money for their company with this Interchange Agreement. b. He violated NERC standards - Early in the afternoon, a system operator notices that frequency has dropped to 59.95Hz and his balancing area's ACE is 0. In order to correct the under frequency condition, the operator pulses his generators to increase generation. Which statement best describes his actions? a. He followed NERC guidelines b. He violated NERC standards c. He helped the system d. He has not impacted the system
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur STUDYLAB2023. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour 15,24 €. Vous n'êtes lié à rien après votre achat.