Who would be responsible for setting the levels of a drain in concrete pavement? - Answer a concrete contractor If it takes 5 min to load a wheelbarrow with 4 cu ft of soil, how long would it take to load 100 cu yd of soil? - Answer 56.25 hr If an expense is noted as "N.I.C." in specifica...