Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
Project Management Module (IFMA FMP) exam with correct answers 14,51 €
Ajouter au panier

Examen

Project Management Module (IFMA FMP) exam with correct answers

 1 vue  0 fois vendu
  • Établissement
  • IFMA

Project Management Module (IFMA FMP) exam with correct answers

Aperçu 3 sur 20  pages

  • 3 janvier 2025
  • 20
  • 2024/2025
  • Examen
  • Questions et réponses
Tous les documents sur ce sujet (7)
avatar-seller
Ruiz
Which attribute most accurately describes a project?-The correct answer is:
| | | | | | | | |


Projects are finite.
| | |




What is an example of how project managers apply sound management
| | | | | | | | | |


techniques?-The correct answer is: they break down a task further if it remains
| | | | | | | | | | | | |


at the same percent completion despite reported progress.
| | | | | | | |




Which is an advantage of using a standardized project management model?-
| | | | | | | | | |


The correct answer is: The model is a framework that project managers can
| | | | | | | | | | | |


adapt to project specifics.
| | | |




In the project model, what do outputs from the Plan phase become?-The
| | | | | | | | | | |


|correct answer is: inputs to the Execute phase.
| | | | | | |




A project will have a long payback period. What should the project be linked to
| | | | | | | | | | | | | |


thus increasing the chances the project will be approved?-The correct answer
| | | | | | | | | | |


is: Strategic facility plans
| | | |




Which activity is set by policy at the start of a project?-The correct answer is:
| | | | | | | | | | | | | |


Estimating
|




What should a facility manager do at the beginning of a routine project to
| | | | | | | | | | | | |


achieve success?-The correct answer is: generate a shared understanding of
| | | | | | | | | |


the end purpose of a project.
| | | | | |

,What principle is true about the steps involved when defining project success?-
| | | | | | | | | | |


The correct answer is: Specifying nonessential parameters is as important as
| | | | | | | | | |


specifying essential ones.
| | |




Which document may include details such as adjacency diagrams, space
| | | | | | | | |


standards, and information on current and future staffing count for business
| | | | | | | | | | |


units?-The correct answer is: Statement of requirements
| | | | | | |




In what document would the project manager be formally listed?-The correct
| | | | | | | | | |


|answer is: Project charter | | |




Which is true about the elements in a project objectives statement?-The
| | | | | | | | | |


correct answer is: Schedule documentation only includes milestones for hard
| | | | | | | | | |


delivery dates.
| |




An organization gathers data on occupant space requirements, desired location,
| | | | | | | | |


and desired cost per square meter (square foot). What other factors should be
| | | | | | | | | | | | |


considered when listing site selection criteria?-The correct answer is: Desired
| | | | | | | | | |


floor plan/stacking plan and desired amenities
| | | | | |




Which element is developed first?-The correct answer is: Work Breakdown
| | | | | | | | |


Structure (WBS)
| |




Of the following terms related to a WBS, which statement is correct?-The
| | | | | | | | | | |


correct answer is: A task is a function to be performed that is detailed enough
| | | | | | | | | | | | | | |


for proposals to indicate cost, schedule, and readiness and completion criteria.
| | | | | | | | | | |

, In which scheduling methods are as many activities as possible concurrently
| | | | | | | | | |


|performed?-The correct answer is: Waterfall model scheduling
| | | | | |




Which statement is true of communications management for an office
| | | | | | | | |


relocation?-The correct answer is: Post-relocation orientation brochures can
| | | | | | | |


help employees find their way around.
| | | | | |




Which role helps ensure continued senior management/client support of major
| | | | | | | | |


projects?-The correct answer is: Project champion
| | | | | |




Which statement is true of contract details?-The correct answer is: Non typical
| | | | | | | | | | |


materials or installation methods should not be included in the main body of a
| | | | | | | | | | | | | |


contractor's proposal.
| |




Which pre-project actions reduce risk and increase the probability of project
| | | | | | | | | |


success?-The correct answer is: Pre-select contractors
| | | | | |




If an organization has narrowed the list of contractors submitting proposals but
| | | | | | | | | | |


|is still having trouble deciding between them, what could help?-The correct
| | | | | | | | | |


|answer is: Bidder presentations
| | |




Which statement is true of the Execute, Monitor and Control phases of the
| | | | | | | | | | | |


project model?-The correct answer is: These phases are often concurrently or
| | | | | | | | | | |


iteratively performed.
| |




When project managers determine the level of data to collect for monitoring
| | | | | | | | | | |


and controlling project work, what do they not need to verify?-The correct
| | | | | | | | | | | |


answer is: Project work delays due to data collection are scheduled.
| | | | | | | | | | |

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Ruiz. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour 14,51 €. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

51292 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 15 ans

Commencez à vendre!
14,51 €
  • (0)
Ajouter au panier
Ajouté