Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
IFMA Operations and Maintainence exam with answers 15,10 €
Ajouter au panier

Examen

IFMA Operations and Maintainence exam with answers

 1 vue  0 fois vendu
  • Établissement
  • IFMA

IFMA Operations and Maintainence exam with answers

Aperçu 3 sur 23  pages

  • 3 janvier 2025
  • 23
  • 2024/2025
  • Examen
  • Questions et réponses
Tous les documents sur ce sujet (7)
avatar-seller
Ruiz
Which statement best defines the concept of environmental sustainability?
| | | | | | | |




A method to relate emissions of volatile organic compounds to equipment
| | | | | | | | | |


performance levels
| |




Assuring the creation and use of a built environment that does not harm the
| | | | | | | | | | | | |


natural environment
| |




A more intensive maintenance approach to lengthen the working life of a
| | | | | | | | | | |


system or equipment
| | |




A method for comparing the relative value of staff against contractors. - correct
| | | | | | | | | | | |


answer -B Sustainability as an ecologically-based term refers to activities that
| | | | | | | | | | |


reduce consumption, waste, habitat and the natural environment. The other
| | | | | | | | | |


choices have no relationship to the term.(Reference: 2-3-2) Chapter 2 Assess
| | | | | | | | | | |


and Inspect Facility Needs
| | | |




What best describes the purpose of reliability-centered maintenance (RCM)?
| | | | | | | |




It is an alternative model to measuring lowest total cost of ownership (TCO)
| | | | | | | | | | | |




It is a policy of 100% planned maintenance.
| | | | | | |




It is a way to measure equipment run-to-failure modes.
| | | | | | | |




It is a philosophy to balance the total expense of predictive and preventive
| | | | | | | | | | | |


|maintenance against the total cost of breakdown. - correct answer -D RCM
| | | | | | | | | | |


|determines the best mix of preventive/predictive maintenance and
| | | | | | |


|proactive/corrective repairs to produce the required availability and functional | | | | | | | |


|reliability at the lowest cost and includes TCO factors.(Reference: 3-3-3)
| | | | | | | | |


|Chapter 3 Manage, Oversee, and Monitor O&M of Building, Systems, and
| | | | | | | | | |


|Equipment

,Which statement most correctly describes a competent facility manager's
| | | | | | | |


responsibilities relative to operations and maintenance?
| | | | | |




Develop the facility's ownership strategy
| | | |




Determine type of occupants | | |




Decide the facility's mission
| | |




Develop the highest possible reliability at lowest overall total cost - correct
| | | | | | | | | | |


answer -D As a cost center, O&M supports the goals and mission of the
| | | | | | | | | | | | | |


organization by balancing acceptable costs against suitable occupant service by
| | | | | | | | | |


demonstrating lowest total overall cost; the other answers reflect strategic
| | | | | | | | | |


planning by ownership.(Reference: 1-1-2) Chapter 1 Introduction to Operations
| | | | | | | | |


and Maintenance
| |




What best describes the role of incentives relative to operations and
| | | | | | | | | |


maintenance activities?
| |




They only work for the short term because they become expected and thus lose
| | | | | | | | | | | | |


their value as incentives.
| | | |




They may be used with staff but are difficult to monitor with contracted
| | | | | | | | | | | |


services.
|




They may be financial or non-financial to influence a particular behavior or
| | | | | | | | | | |


result.
|




They are specific to financial inducements such as bonuses, prizes and gifts. -
| | | | | | | | | | | |


correct answer -C Incentives represent a broad category of rewards and
| | | | | | | | | | |


recognition. Descriptions that limit or make assumptions beyond the purpose
| | | | | | | | | |


of influencing specific actions cannot be supported against the correct
| | | | | | | | | |


answer.(Reference: 5-4-5) Chapter 5 Select the Best Resources
| | | | | | | |




Which statement more accurately describe the total quality management
| | | | | | | |


(TQM) approach?
| |

, TQM is an organizational business model but not useful for measuring
| | | | | | | | | |


operations and maintenance performance.
| | | |




TQM improves efficiency by anticipating and avoiding problems.
| | | | | | |




TQM is usually applied at the end of a service to measure occupant satisfaction.
| | | | | | | | | | | | |




TQM is a measurement used for contractors but not for staff - correct answer -
| | | | | | | | | | | | | |


B TQM is a well-known quality approach that competent facility managers use
| | | | | | | | | | |


to continuously improve services for the benefit of occupants and the entire
| | | | | | | | | | | |


organization. As such it becomes part of nearly every aspect and stage of O&M
| | | | | | | | | | | | | |


activities.(Reference: 4-2-1) Chapter 4 Manage, Oversee, and Monitor
| | | | | | | |


Occupant Services
| |




At what point does the work flow process generally begin?
| | | | | | | | |




It is the ongoing activity of checking work accomplished against performance
| | | | | | | | | |


|standards.
It has no place in the maintenance work flow because it describes an
| | | | | | | | | | | |


|emergency procedure. |




It is the activity of greeting maintenance personnel and assigning tasks.
| | | | | | | | | |




It is where work requests are received and collected from the preventive
| | | | | | | | | | |


|maintenance schedule or help desk (work management center). - correct
| | | | | | | | |


|answer -D Competent facility managers may use different terms and have
| | | | | | | | | |


|different methodologies for managing maintenance, however all have some
| | | | | | | |


|method for gathering inputs (work requests) from which to assign work. No
| | | | | | | | | | |


|other choice offers a credible explanation.(Reference: 3-3-4)
| | | | | |




What materials are typically used for a bituminous roof?
| | | | | | | |




Paving slabs. |




Felts and small minerals.
| | |




Thermoset rubber polymers | |

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur Ruiz. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour 15,10 €. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

51292 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 15 ans

Commencez à vendre!
15,10 €
  • (0)
Ajouter au panier
Ajouté