100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Summary Project Management Advanced €7,98
In winkelwagen

Samenvatting

Summary Project Management Advanced

 15 keer bekeken  0 keer verkocht

In dit samenvatting vind je volgende modules: - Overview & PLC - Project Initiation & Planning - SM & RM - From WBS to Gantt Chart - (Intro) Information Management - Storytelling with Data - Intro Change Management - Quality Management

Voorbeeld 4 van de 70  pagina's

  • 30 mei 2022
  • 70
  • 2021/2022
  • Samenvatting
Alle documenten voor dit vak (8)
avatar-seller
furkanztrk
Table of Contents
1. Overview & Project Life Cycle ......................................................................................................... 1
1.1. Project Management overview............................................................................................... 1
1.1.1. Project features............................................................................................................... 1
1.1.2. Is it a project? .................................................................................................................. 1
1.1.3. The success of a project .................................................................................................. 1
1.1.4. Project constraints .......................................................................................................... 2
1.1.5. The triple constraint........................................................................................................ 2
1.1.6. Project Management expertise ...................................................................................... 2
1.1.7. Application knowledge.................................................................................................... 2
1.1.8. Understanding project environment .............................................................................. 3
1.1.9. Management knowledge & skills .................................................................................... 3
1.1.10. Interpersonal skills .......................................................................................................... 3
1.2. Project Life Cycle ..................................................................................................................... 4
1.2.1. Framework for PM .......................................................................................................... 5
1.2.2. PMBOK ............................................................................................................................ 5
1.2.3. Scrum development overview ........................................................................................ 7
1.2.4. The project management office...................................................................................... 8
1.2.5. Culture and project management ................................................................................... 8
1.2.6. Project team challenges .................................................................................................. 8
1.2.7. Dealing with conflict ....................................................................................................... 8
2. Project Initiation & Planning (scope to budget).............................................................................. 9
2.1. Initiation phase ....................................................................................................................... 9
2.1.1. Clear objectives ............................................................................................................... 9
2.2. Project charter (***) ............................................................................................................... 9
2.3. Project planning .................................................................................................................... 11
2.3.1. Project requirements .................................................................................................... 12
2.3.2. Scope inputs .................................................................................................................. 13
2.3.3. Work Breakdown Structure (WBS) ............................................................................... 13
2.3.4. Scope statement ........................................................................................................... 15
2.4. Project schedule planning ..................................................................................................... 15
2.4.1. Defining activities .......................................................................................................... 15
2.4.2. Activity list ..................................................................................................................... 16
2.4.3. Milestones..................................................................................................................... 17
2.4.4. The network diagram .................................................................................................... 17

, 2.4.5. The critical path............................................................................................................. 18
2.4.6. The Gantt chart ............................................................................................................. 18
2.4.7. Estimating the resources .............................................................................................. 19
2.4.8. Estimating activity durations ........................................................................................ 19
2.4.9. Resource management ................................................................................................. 20
2.5. HR planning ........................................................................................................................... 20
2.6. Budget planning .................................................................................................................... 20
2.6.1. Estimating cost .............................................................................................................. 21
2.6.2. Managing the budget .................................................................................................... 22
2.6.3. Establishing a budget .................................................................................................... 22
3. SM & RM ....................................................................................................................................... 23
3.1. Stakeholder Management .................................................................................................... 23
3.1.1. Project stakeholders ..................................................................................................... 23
3.1.2. Politics of project .......................................................................................................... 25
3.1.3. Differences in culture .................................................................................................... 25
3.1.4. Managing stakeholders ................................................................................................. 26
3.1.5. Tools for managing stakeholders .................................................................................. 26
3.1.6. Looking for stakeholders? ............................................................................................. 27
3.2. Risk Management ................................................................................................................. 27
3.2.1. Risk identification.......................................................................................................... 27
3.2.2. Risk Breakdown Structure (RBS) ................................................................................... 28
3.2.3. Risk evaluation .............................................................................................................. 28
3.2.4. Risk Mitigation Plan ...................................................................................................... 28
3.2.5. Contingency Plan........................................................................................................... 28
3.2.6. Project Risk by phases ................................................................................................... 29
3.2.7. Free risk analysis tool .................................................................................................... 30
4. From Work Breakdown Structure to Gantt Chart ......................................................................... 31
4.1. Work Breakdown Structure .................................................................................................. 31
4.2. A negative definition ............................................................................................................. 31
4.3. Organisational chart.............................................................................................................. 31
4.4. List of project tasks + no verbs? ............................................................................................ 32
4.5. No sequencing....................................................................................................................... 32
4.6. Details and structure............................................................................................................. 32
4.6.1. Why is a code of accounts? ........................................................................................... 33
4.7. Is my WBS correct? ............................................................................................................... 33
4.8. Not a one-time document .................................................................................................... 33

, 4.9. Creating a WBS...................................................................................................................... 34
4.10. WBS Rule 1: Base it on the deliverables ........................................................................... 34
4.11. WBS Rule 2: Follow the 100% rule .................................................................................... 35
4.12. Project scheduling rules .................................................................................................... 36
5. Introduction to Information Managment ..................................................................................... 39
5.1. Activities ................................................................................................................................ 39
5.2. Activity description ............................................................................................................... 39
5.2.1. Make an activity description ......................................................................................... 40
5.3. Recognising activities, some rules ........................................................................................ 40
5.4. Data flow diagram ................................................................................................................. 40
6. Information Management ............................................................................................................ 41
6.1. The information ladder ......................................................................................................... 41
6.2. Model information provision ................................................................................................ 41
6.3. Kinds of information ............................................................................................................. 41
6.4. Eight quality aspects of information management .............................................................. 42
6.5. Organisation and Management ............................................................................................ 42
6.5.1. The organisation ........................................................................................................... 42
6.5.2. Three organisational flow ............................................................................................. 42
6.5.3. Control model ............................................................................................................... 43
6.5.4. Control model: concepts ............................................................................................... 43
6.5.5. Performance indicators................................................................................................. 44
6.5.6. Setting up the management loop ................................................................................. 44
6.5.7. Link to performance indicators ..................................................................................... 45
6.5.8. Management information............................................................................................. 46
6.5.9. Standard management information ............................................................................. 46
6.6. Data collection ...................................................................................................................... 47
6.6.1. Aspects of data.............................................................................................................. 47
6.6.2. Dataset .......................................................................................................................... 47
6.6.3. Kinds of data ................................................................................................................. 47
6.6.4. Databases ...................................................................................................................... 48
7. Storytelling with data .................................................................................................................... 49
7.1. Ineffective graphics ............................................................................................................... 49
7.2. Five chapters ......................................................................................................................... 49
7.2.1. Understand the context ................................................................................................ 49
7.2.2. Choose an appropriate visual display ........................................................................... 50
7.2.3. Eliminate cutter............................................................................................................. 53

, 7.2.4. Focus attention where you want it ............................................................................... 55
7.2.5. Think like a designer...................................................................................................... 56
8. Introduction to Change Management .......................................................................................... 58
8.1. What is Change Management? ............................................................................................. 58
8.2. Benefits of integrated approach ........................................................................................... 58
8.2.1. Tips for integrating PM and CM .................................................................................... 58
8.3. Why does Change Management fail? ................................................................................... 59
9. Quality Management .................................................................................................................... 61
9.1. What is quality? .................................................................................................................... 61
9.2. What is Quality Management? ............................................................................................. 61
9.3. What is a quality system? ..................................................................................................... 61
9.4. Quality Management ............................................................................................................ 61
9.4.1. Norms ............................................................................................................................ 61
9.4.2. Quality inspection ......................................................................................................... 62
9.4.3. Quality control (≠ monitoring) ...................................................................................... 62
9.4.4. Quality assurance (≠ insurance) .................................................................................... 62
9.5. Total QM ............................................................................................................................... 62
9.6. Some developments in consumer market ............................................................................ 63
9.7. Technical developments ....................................................................................................... 63
9.8. Quality image ........................................................................................................................ 63
9.9. Product liability ..................................................................................................................... 63
9.10. Five approaches to quality ................................................................................................ 64
9.11. Some theories ................................................................................................................... 65
9.11.1. Taylorism ....................................................................................................................... 65
9.11.2. PDCA.............................................................................................................................. 65
9.11.3. Kaizen ............................................................................................................................ 65
9.11.4. 5S ................................................................................................................................... 66
9.11.5. JIT -Make or buy – CO-makership ................................................................................. 66
9.11.6. Certification................................................................................................................... 66

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper furkanztrk. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,98. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 52510 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,98
  • (0)
In winkelwagen
Toegevoegd