100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
AF Contracting Officer Study Guide (unofficial)2022/2023 €16,80   In winkelwagen

Tentamen (uitwerkingen)

AF Contracting Officer Study Guide (unofficial)2022/2023

 91 keer bekeken  2 keer verkocht
  • Vak
  • Instelling

FAR 1.602-2; 3.104-4; 15.207 () Q: What are the CO's responsibilities in source selection? 1. Procedures to safeguard source selection information. 2. Approve access to/release source selection information. 3. Maintain SS evaluation records. Source Selection 2016 DoD Source Selection M...

[Meer zien]

Voorbeeld 4 van de 134  pagina's

  • 27 september 2022
  • 134
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
AF Contracting Officer Study Guide
(unofficial)

*Source Selection*

FAR 1.602-2; 3.104-4; 15.207

(2016-05-31)

Q: What are the CO's responsibilities in source selection? correct answer1. Procedures to safeguard
source selection information.

2. Approve access to/release source selection information.

3. Maintain SS evaluation records.



*Source Selection*

2016 DoD Source Selection Manual, 1.4.1.2

(2016-05-31)



Q: What are the SSA responsibilities? correct answer1. Proper and efficient conduct of SS process.



2. Appoint respective chairpersons.



3. Establish SS team and ensure their knowledge of policy/procedure.



4. Ensure pace is event and not schedule driven (realistic SS schedule).



*Financing*

FAR 32.106

,(2016-05-31)



Q: Name the different types of government financing in order of their preference correct answer1.
Private financing (most preferred).



2. Performance based payments.



3. Customary progress payments.



4. Guaranteed loans.



5. Unusual progress payments.



6. Advance payments (least preferred).



*Acquisition Strategy Panel (ASP)*

AFFARS 5307.104-92; AFICA MP 5307.104-92

(2016-05-31)



Q: Who prepares the ASP minutes, when are they prepared and who approves them?



*AIR FORCE ONLY* correct answerProgram manager, CO or Commodity Council Director prepares
following the conclusion of the ASP briefing, and approved by the ASP chairperson.



*Cost Analysis*

FAR 15.404-1 (c)

,(2016-05-31)



Q: What is cost analysis? correct answerReview and evaluation of separate elements and profit of
contractor's proposal. The application of judgment to determine how well proposed costs represent
what the cost of the contract should be assuming reasonable economy and efficiency. Techniques
include verification of cost or pricing data and evaluation of cost elements; projection of offeror's cost
trends based on current/historical cost/pricing data; audit and negotiated indirect cost, labor and COM
rates.



*IDIQ*

FAR 16.504 (a)

(2016-05-31)



Q: How does the PCO compute the minimum and maximum quantity on an IDIQ contract? correct
answer1. Minimum-Should be more than a nominal quantity but should not exceed amount the
Government is fairly certain to order.



2. Maximum - A reasonable max should be established by conducting market research trends on recent
contracts for similar supply/svcs, survey of potential users, other rational basis.



*Estimating Systems*

FAR 15.407-5

(2016-05-31)



Q: Define estimating system and cost reimbursement. correct answerEstimating system is contractor's
policies/procedures/practices for generating estimates. Includes organizational structure, internal
controls, and managerial reviews, work flow, est methods, techniques, accumulation of historical costs
and other analysis. Cost reimbursement - Contractor's ability to accurately and reliable estimate costs
could lead to cost overruns and increased risk for the Government.

, *Defective Pricing*

FAR 15.407-1

(2016-05-31)



Q: What are six conditions which must exist to have defective pricing? correct answer1. Information fits
the definition of cost and pricing data.



2. Accurate data was available to the contractor before the agreement on price.



3. Data was not accurate, current, complete as of date of agreement.



4. Data was not submitted to CO.



5. Government must have relied on the data.



6. An increase in cost as a result of Government reliance on the data.



*Contract Elements*

Common Law

(2016-05-31)



Q: What are the essential elements of a contract? correct answer1. Offer.



2. Acceptance.



3. Consideration.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper YANCHY. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €16,80. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 79271 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€16,80  2x  verkocht
  • (0)
  Kopen