100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Summary Chapter 17 'managing resources' Gower Handbook of Project Management, ISBN: 9781472422965 €3,49   In winkelwagen

Samenvatting

Summary Chapter 17 'managing resources' Gower Handbook of Project Management, ISBN: 9781472422965

 2 keer bekeken  0 keer verkocht
  • Vak
  • Instelling
  • Boek

Chapter 17 Gower Handbook of Project Management, ISBN: 2965

Voorbeeld 2 van de 7  pagina's

  • Onbekend
  • 7 oktober 2022
  • 7
  • 2022/2023
  • Samenvatting
avatar-seller
Summary of the hand of project management | Remco van der Schoot


2. Determine the level of reliability of the estimated planned durations
3. Develop the schedule with the planned durations
a. Establish the project’s baseline schedule and minimum total project duration
4. If a distribution for a task duration is available shorten it to the left of the planned duration. If the
distribution is not available, estimate the size of the maximum error as a single point estimate or assume
a distribution for it.
5. If the task error distributions are available or assumed a distribution of project completion times can be
generated. Use the distribution of the project duration of the project as a buffer
6. If the task error distributions are not available and calculate it. A = 1,2*n*p+3,5
a. A = used a contingency buffer for the schedule
b. P= 1-relaibility
c. N= number of activities on the critical path
7. As the project continues the number of remaining tasks decreases and so the buffer will change.


2.3.4. SOME RECOMMENDATIONS
1. Define your objectives and give them priorities:
2. Focus on collecting planning and scheduling data:
o The scope of the project should be defined as accurately as possible
▪ Including the WBS, WP’s, network diagram & milestone plan
3. Implement the schedule but be ready for change:
4. Use a systemic approach to develop the schedule:
5. Input the planning data into project management software of your choice:
6. Perform schedule risk analysis:


2.3.5. CONCLUDING REMARKS
Two major causes of scheduling failure are:
1. Overemphasis on shorter project duration as a prima scheduling objective
2. Lack of proper emphasis on scheduling risks and unreliability

Choose a suitable objective and develop a flexible and dynamic schedule; USM approach.

2.4. HOOFDSTUK 17 – MANAGING RESOURCES (P.263-281)
Resources = anything that will cost money to obtain and is necessary for the completion of a work.
- Includes labor, equipment, licenses, taxes and so forth (excluding money because it’s the primary means
of getting resources)


2.4.1. THE RESOURCE MANAGEMENT PROCESS

RESOURCE CONSTRAINTS
Constraints for projects: human resources, physical constraints and limitations, environmental issues, contractual
terms and conditions, materials availability of required quality and quantity, technical limitations and budget
limitations.

All in-house resources required for a project should be identified and assigned in a resource breakdown structure
(RBS).

RESOURCE BREAKDOWN STRUCTURE (RBS)
resource breakdown structure (RBS) = classifies and catalogues the resources needed to accomplish project
objectives.
- For dividing the resources into smaller units for planning, estimating and managing

P a g i n a 19 | 35

, Summary of the hand of project management | Remco van der Schoot


Resource types can be classified as:
- People, and van be divided into:
o Skill, professional discipline, work functions, location, equipment, supplies, tools and materials,
size, function and technical area.
- Materials and equipment
- Tools and machinery
- Fees and licenses
o Including software




RBS contains units of measurement.
- There can be only one type of time measuring unit for time
- FPS and SI measuring units should not be mixed with units in the same RBS.




P a g i n a 20 | 35

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper RSCHO. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €3,49. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 82388 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€3,49
  • (0)
  Kopen