100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
CMIT Exam (200 multiple choice) Exam Guide With Solution €10,88   In winkelwagen

Tentamen (uitwerkingen)

CMIT Exam (200 multiple choice) Exam Guide With Solution

2 beoordelingen
 189 keer bekeken  12 keer verkocht
  • Vak
  • CMIT
  • Instelling
  • CMIT

CMIT Exam (200 multiple choice) Exam Guide With Solution...

Voorbeeld 3 van de 26  pagina's

  • 26 april 2023
  • 26
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • CMIT
  • CMIT

2  beoordelingen

review-writer-avatar

Door: ikeredus • 5 maanden geleden

review-writer-avatar

Door: hooper07 • 1 jaar geleden

avatar-seller
CMIT Exam (200 multiple choice) Exam Guide With Solution



A CM's role and responsibilities are governed solely by the Owner/CM Agreement.

True False - ANSWERTrue

There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of
construction management practice. However, there are some key differences. Which of the following
do not apply to both CM forms?

A) Both forms provide advice to the owner on constructibility, budget and the schedule.

B) Both require that the liabilities and risks assumed by the parties be clearly understood,
coordinated, and stated in the respective contracts.

C) Both forms allow the CM to function in an advisory role for the entire engagement of the CM.

D) Services can vary based on the contractual relationships of the parties and the risks that are
assumed. - ANSWERC) Both forms allow the CM to function in an advisory role for the entire
engagement of the CM.

Construction management had its beginnings in the early to mid-1960's. Which of the following
factors contributed to the initial use of this delivery system?

A) The need to reduce the overall time and cost associated with project delivery.

B) The increasing cost of money and the unpredictability of project funding streams.

C) The changing role of the general contractor and the increasing numbers of specialty trade
contractors.

D) All of the above. - ANSWERD) All of the above.

The General Services Administration was the first federal agency to use construction management. -
ANSWERTrue

The General Services Administration, the Department of Health, Education and Welfare (now HHS),
and the Veterans Administration ran into similar difficulties in the use of construction management.
Which of the following was/were common problems for all three agencies?

A) Funding restrictions

B) Claims

C) Change conditions

D) All of the above - ANSWERD) All of the above

CMAA was formed and incorporated 1982 with its primary focus being the growth and development

,of the construction management profession. - ANSWERTrue

The CMAA Construction Management Standards of Practice is intended as a guide to the range of
services that constitute professional construction management. They seek to meet the documented
need for definitions of what construction management services are, without unduly structuring the
methodologies by which those services are provided by the CM. - ANSWERTrue

The goals of the Construction Management Association of America (CMAA) include:

A) Setting standards and developing contract documents for construction management practice.

B) Expanding the understanding of the construction management concept and its use in the
marketplace.

C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of
federal, state, and local governments.

D) All of the above. - ANSWERD) All of the above

The fact that an individual is certified or licensed in any other profession does not, per se, establish
him/her as a qualified CM.

True False - ANSWERTrue

Certification as a CM means the construction management practitioner has "state of the art"
knowledge and capability to practice construction management.

True False - ANSWERFalse

Recruiting and training are business matters and normally do not involve ethical concerns.

True False - ANSWERFalse

Construction management is a concept that is susceptible to overselling.

True False - ANSWERTrue

Failure to provide quality services is a business and not an ethical question.

True False - ANSWERFalse

Contracting for adequate fees is both a business and an ethical issue.

True False - ANSWERTrue

The ethics of the CM profession focus primarily on a CM's relationships in dealing with its clients.

True False - ANSWERTrue

The possible approaches for delivering a project are virtually unlimited. A key reason for such
variations is:

, A) The different roles that can be assumed by project participants.

B) Different forms of contracts and methods of compensation that can be used.

C) The different levels of care, responsibility, and risks assumed by the parties involved.

D) All of the above. - ANSWERD) All of the above

The traditional delivery system is characterized by executing the major phases of a project in:

A) An overlapping concept

B) A linear sequence

C) A fast track method

D) All of the above - ANSWERB) A linear sequence

A key advantage of the traditional delivery approach is:

A) With the traditional delivery system, the cost of the construction phase is known before
construction starts.

B) Facility features are fully determined & specified.

C) When the construction contract is signed, the major risk belongs to the contractor.

D) All of the above - ANSWERB) Facility features are fully determined & specified.

Design-build and at-risk construction management delivery systems allow the option to fast-track
or phase a project.

True False - ANSWERTrue

Most definitions of construction management are similar. However, a contractual definition is not
known until:

A) The legal form of the CM contract is chosen.

B) The specific scope of services to be provided is identified.

C) The relationship of the CM to others and the risks and authority assumed by the parties are
clearly defined.

D) All of the above - ANSWERD) All of the above

21.

In a CM-at-Risk arrangement once construction begins and the CM converts from the professional
advisory role of a CM to the contractual role of a general contractor, the CM has no implied duties of
loyalty and care to the owner.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Braxton. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €10,88. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 81311 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€10,88  12x  verkocht
  • (2)
  Kopen