100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+ €11,29
In winkelwagen

Tentamen (uitwerkingen)

NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+

 1 keer verkocht
  • Vak
  • Instelling

NEBOSH NCC1, Top Exam Questions and answers, 100% Accurate. Graded A+ Construction issues - -Transitory nature of workers Temporary nature of construction activities and the constantly changing workplace Time pressures from clients and principal contractors Weather conditions Levels of num...

[Meer zien]

Voorbeeld 3 van de 27  pagina's

  • 13 juni 2023
  • 27
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
NEBOSH NCC1, Top Exam Questions
and answers, 100% Accurate. Graded A+

Construction issues - ✔✔-Transitory nature of workers

Temporary nature of construction activities and the constantly changing workplace

Time pressures from clients and principal contractors

Weather conditions

Levels of numeracy and literacy of workers

Non-English speaking workers



High risk areas for injuries in construction - ✔✔-Falls from height

Slips, trips and falls

Being struck by falling/moving objects

Manual handling



Construction (Design and Management) Regulations 2007 - ✔✔-Apply to all construction projects

Duties placed on clients, designers and all construction workers



CDM regs - notifiable projects - ✔✔-Construction phase will last longer than 30 days

Construction phase will involve more than 500 person days at work



Duty holders for notifiable projects - ✔✔-Client - have most influence

Designers - have responsibility beyond construction phase

Contractors - competence

CDM Co-ordinator - advise client of their duties, co- ordinates others

Principal contractor - safe working, co- ordination and co-operation between contractors

,CDM client duties - ✔✔-Appoint competent persons

Ensure suitable mgmt of welfare

Allow sufficient time and resources

Provide pre-construction info

Appoint duty holders for notifiable projects

Retain and provide access to health and safety file



CDM co-ordinator CDM duties - ✔✔-Advise and assist client with their duties

Notify HSE

Co-ordinate H&S aspects of design work and co-operate with others

Facilitate good communication

Liaise with principal contractor re ongoing design

Pass on pre-construction information

Prepare/update H&S file



Designer CDM duties - ✔✔-Check client is aware of their duties

Eliminate hazards and reduce risks during design

Provide information about remaining risks

Check CDM co-ordinator has been appointed

Provide any information needed for H&S file



Principal contractors CDM duties - ✔✔-Plan, manage and monitor construction phase

Prepare, develop and implement a written plan and site rules

Give contractors relevant parts of the plan

Provide suitable welfare facilities

Check competence of all appointees

Site inductions and further info and training

Consult with workers

, Liaise with CDM-c

Secure the site



Contractor CDM duties - ✔✔-Check client aware of duties

Plan, manage and monitor own work and that of workers

Check competence

Train own employees

Comply with part 4 of CDM regs

Ensure adequate welfare facilities

Co-operate with principal contractor



Pre-construction information - ✔✔-Description of the project

Management requirements and provisions

Environmental restrictions and existing risks on site

Design and construction hazards

Health and safety file



Construction phase H&S plan - ✔✔-Relevant info from pre-construction information

Project description and programme or works with key dates

Identify the organisation in place (mgmt structure, responsibilities and "who does what")

Identify arrangements in place to manage H&S risks

Show how construction work will be co-ordinated and how consultation will be achieved

Contain the H&S file



Health and safety file contains: - ✔✔-Brief description of the work carried out

As built dwgs

Survey info (e.g. Asbestos) and groundwork plans

Location of services

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, Bancontact of creditcard en je bent klaar. Geen abonnement nodig.

Focus op de essentie

Focus op de essentie

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper PassPoint02. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €11,29. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 69052 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Start met verkopen
€11,29  1x  verkocht
  • (0)
In winkelwagen
Toegevoegd