The purpose of Construction Quality Management is to: - Answer- Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ...
The purpose of Construction Quality Management is to: - Answer- Achieve the quality
established by properly developed requirements through the combined responsibility,
but seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that
construction is performed. - Answer- According to plans and specifications, on time,
within a defined budget and a safe work environment.
Partnering relationships are based upon: - Answer- Building trust and dedication to
common goals
It is the responsibility of Quality Assurance Personnel to: - Answer- Periodically verify
that the contractors system of control is working effectively.
An effective contractor quality control program will: - Answer- Be an incentive for work to
be done correctly the first time resulting in earlier completion, reduced field overhead
costs, and greater profits.
The success or failure of all contractors is based upon: - Answer- The ability to control
costs, finance work, estimate jobs, schedule the work, and maintain effective quality
control.
Quality Assurance Personnel have the responsibility to: - Answer- Require contractors
to maintain the quality specified in the plans and specifications.
Inspection is: - Answer- The process by which ongoing and completed work is
examined
During the punch-out inspection of a project: - Answer- Quality Assurance Personnel
must assure that the contractor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work complies with the contract: -
Answer- The government makes the final determination
Characteristics that describe a definable feature of work include: - Answer- Cross-
referenced listings to the contractors construction schedule that may have more than
one definable feature under a section of the specifications.
The _____________________ consists of daily checks of the work to assure continuing
compliance with contract requirements. - Answer- Follow-up phase
The Quality Assurance Plan: - Answer- Is a government management tool establishing
staffing, training, pre-award activities, and surveillance activities.
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
√ Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper GEEKA. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €9,88. Je zit daarna nergens aan vast.