100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Chapter 23 Performance Evaluation Using Variances from Standard Costs. €3,69   In winkelwagen

Tentamen (uitwerkingen)

Chapter 23 Performance Evaluation Using Variances from Standard Costs.

 2 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

Chapter 23 Performance Evaluation Using Variances from Standard Costs. Accounting 26th Ed by Warren -Test Bank

Voorbeeld 4 van de 87  pagina's

  • 8 januari 2024
  • 87
  • 2022/2023
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
CHAPTER 23: PERFORMANCE EVALUATION USING VARIANCES FROM
STANDARD COSTS
1. A variable cost system is an accounting system where standards are set for each manufacturing cost element.
a. True
b. False

ANSWER: False
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

2. One reason not to depend solely on historical records to set standards is that there may be inefficiencies contained in
past costs.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

3. Standard costs serve as a device for measuring efficiency.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic




© 2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

,Chapter 23: Performance Evaluation Using Variances from Standard Costs




4. The standard cost is how much a product should cost to manufacture.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility ACCT.IMA.09 -
Performance Measurement BUSPROG: Analytic

5. Accounting systems that use standards for product costs are called standard cost systems.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

6. Accounting systems that use standards for product costs are called budgeted cost systems.
a. True
b. False

ANSWER: False
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic




© 2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

,Chapter 23: Performance Evaluation Using Variances from Standard Costs




7. Normally, standard costs should be revised when labor rates change to incorporate new union contracts.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

8. Standard costs should always be revised when they differ from actual costs.
a. True
b. False

ANSWER: False
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

9. Financial reporting systems that are guided by the principle of exceptions concept focus attention on variances from
standard costs.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic




© 2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

, Chapter 23: Performance Evaluation Using Variances from Standard Costs




10. In most businesses, cost standards are established principally by accountants.
a. True
b. False

ANSWER: False
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

11. It is correct to rely exclusively on past cost data when establishing standards.
a. True
b. False

ANSWER: False
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic

12. Ideal standards are developed under conditions that assume no idle time, no machine breakdowns, and no materials
spoilage.
a. True
b. False

ANSWER: True
DIFFICULTY: Easy
Bloom’s: Remembering
LEARNING OBJECTIVES: ACCT.WARD.16.23-01 - 23-01
ACCREDITING STANDARDS: ACCT.ACBSP.APC.27 - Managerial Accounting Features/Costs
ACCT.ACBSP.APC.36 - Budgeting and Responsibility
ACCT.IMA.09 - Performance Measurement
BUSPROG: Analytic




© 2016 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper ExamsExpert. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €3,69. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 85651 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€3,69
  • (0)
  Kopen