Which of the following balancing control modes is used by PJM under normal operations? - ️️Tie-Line Bias
Which of the following influences does PJM consider when performing their system load forecast? - ️️Weather Conditions & Day of the Week
All of the following are limits that must b...
PJM Test Questions Which of the following balancing control modes is used by PJM under normal operations? - ✔ ✔ Tie-
Line Bias Which of the following influences does PJM consider when performing their system load forecast? - ✔ ✔ Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - ✔ ✔ Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)? 1. Remedial Action Reserve 2. Synch Reserve 3. Non -Synch Reserve 4. Secondary Reserve - ✔ ✔ Synch Reserve Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what would be the most likely event that occurred? - ✔ ✔ A generator on your system tripped offline How does the PJM dispatche r inform the Members of the PJM regulation Requirements? - ✔ ✔ All-
Call In order for your generator to quality to supply regulation in the PJM Regulation market, it must be able to respond and attain its desired output within how many minutes? - ✔ ✔ 5 min utes Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - ✔ ✔ decrease the MW output of the unit PJM maintains a regulation quality standard which states that a generator may be certified to provide regulation only after it achieves three consecutive regulation test scores of at least - ✔ ✔ 75% Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1. incorrect interchange number 2. loss of a tie -line RTU 3. loss of internal load 4. loss of adjacent control area generation - ✔ ✔ loss of adjacent control area generation The primary purpose for the balancing area to have Regulation is to correct for: - ✔ ✔ small deviations in load It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit outages: - ✔ ✔ as soon as practicable PJM should be made aware of any fuel shortage that a generator may experience. This information assists in analyzing the resources and reliably operating the system. A heightened awareness is expected during: - ✔ ✔ extreme hot or cold conditions Generators are required to obtain PJM approval prior to removing a generating unit from service. The only exception is for: - ✔ ✔ injury to personnel will be prevented Prior to removing a self -scheduled generator from service, the PJM member must first - ✔ ✔ give PJM the option to takeover the unit for the market When PJM experiences problems with t heir primary digital control signal, it sometimes becomes necessary for companies with the capability, to switch to the back -up signal. This backup signal is known as: - ✔ ✔ Analog control When PJM sends cost signals to generators, to provide direction for increasing or decreasing the facility output, this signal that is sent is known as: - ✔ ✔ Dispatch Rate Under normal operating conditions, what is the limit that will provide the lowest output level of a generating unit? - ✔ ✔ Eco Min When PJM send o ut a cost signal to generators to adjust their output, the generating personnel adjust the output of the unit base on the unit's - ✔ ✔ price or cost curve incremental Which eSuite tool is used to maintain individual generator regulation data that is submi tted by PJM members? - ✔ ✔ eMarket PJM's ACE configuration is such, that when the ACE is positive (+), it indicates - ✔ ✔ too much generation If a generator is self -scheduled, what is the minimum notification time required in order for the MW output to b e adjusted? - ✔ ✔ 20 minutes prior to the change When corrections are made for the time error and the system scheduled frequency must be changed to implement the correction, how much is the frequency scheduled adjusted by? - ✔ ✔ + /- 0.02 Hz When PJM run s their Regulation test, how long do the tests normally run? - ✔ ✔ 40 minutes Your system has a 300 MW steam unit, but due to oil deliveries, the on -site fuel supply is diminishing. What is the hourly threshold for reporting to PJM that the unit cannot operate at its maximum capacity due to the fuel limitation? - ✔ ✔ 72 hours What is the regulation requirement for the PJM balancing area during on -peak hours? - ✔ ✔ 1.0% of the forecas ted peak load What is the time requirement that a generator that wishes to self -schedule itself must provide to PJM? - ✔ ✔ 20 minutes The PJM Peak Period Maintenance season occurs: - ✔ ✔ Between the 24th & 36th Wednesdays of the year Maintenance outage extensions may be granted provided that the request for an extension is made - ✔ ✔ Prior to the end of the outage
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
√ Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper jackline98. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €8,29. Je zit daarna nergens aan vast.