100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Samenvatting voor 'introduction to project management' €6,49
In winkelwagen

Samenvatting

Samenvatting voor 'introduction to project management'

 19 keer bekeken  1 keer verkocht

Samenvatting voor 'introduction to project management'. Vak op Artevelde, 1ste jaar, tweede semester

Voorbeeld 3 van de 19  pagina's

  • 22 mei 2024
  • 19
  • 2023/2024
  • Samenvatting
Alle documenten voor dit vak (10)
avatar-seller
gilvermeer
Project management

,Inhoud
1. People working on projects...............................................................................................................4
1.1. Project organization........................................................................................................................4
1.2. Key players......................................................................................................................................5
1.3. Five stages of project team development according to Tuckman...................................................6
1.3.1. Forming........................................................................................................................................6
1.3.2. Storming......................................................................................................................................6
1.3.3. Norming.......................................................................................................................................6
1.3.4. Performing...................................................................................................................................6
1.3.5. Adjourning...................................................................................................................................6
1.4. Team roles according to Belbin.......................................................................................................6
1.5. Projects and cultural differences.....................................................................................................7
1.6. Working on a project......................................................................................................................8
2. Stakeholder management..................................................................................................................9
2.1. Stakeholder matrix..........................................................................................................................9
2.2. Communicating with stakeholders..................................................................................................9
3. Information management..................................................................................................................9
3.1. Activities.........................................................................................................................................9
3.2. Data flow diagram.........................................................................................................................10
4. Information systems........................................................................................................................10
5. Aspects of data................................................................................................................................11
5.1. Syntax data...................................................................................................................................11
5.2. Semantics of data.........................................................................................................................11
5.3. Pragmatics of data........................................................................................................................11
6. The project from start to finish........................................................................................................12
6.1. Project proposal............................................................................................................................12
6.2. Initial meeting...............................................................................................................................12
6.3. Setting up the project...................................................................................................................12
6.4. Project start-up meeting...............................................................................................................13
6.5. Design and presentation...............................................................................................................13
6.6. Realization of the project result....................................................................................................13
6.7. Completion of the project.............................................................................................................13
6.8. Monitoring aspects of a project....................................................................................................13

, 7. Planning & scheduling.....................................................................................................................14
7.1. Why plan?.....................................................................................................................................14
7.2. Concepts and terms......................................................................................................................14
7.3. Network diagrams.........................................................................................................................14
7.4. Gantt charts..................................................................................................................................15
7.5. Deriving a Gantt chart from a network diagram...........................................................................15
7.6. Adjustments to schedules.............................................................................................................15
7.7. Which activities are required?......................................................................................................15
7.8. Planning software.........................................................................................................................16
7.9. Planning a large project in phases.................................................................................................16
8. Chart & diagrams.............................................................................................................................16
8.1. Network diagram..........................................................................................................................16
8.2. Gantt chart....................................................................................................................................17
8.3. Final challenge..............................................................................................................................17
9. Change management.......................................................................................................................17
10. Quality management.....................................................................................................................17
10.1. Norms.........................................................................................................................................18
10.2. Quality inspection.......................................................................................................................18
10.3. Quality control............................................................................................................................18
10.4. Quality assurance........................................................................................................................18
10.5. Five approaches to quality..........................................................................................................18
10.5.1. Transcendent approach...........................................................................................................18
10.5.2. Product approach....................................................................................................................18
10.5.3. User-oriented approach...........................................................................................................18
10.5.4. Production-oriented approach.................................................................................................19
10.5.5. Value-oriented approach.........................................................................................................19

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper gilvermeer. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €6,49. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 50843 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€6,49  1x  verkocht
  • (0)
In winkelwagen
Toegevoegd