1 of 147
Term
What cost estimation method takes cost per person-hour, square
meter or foot from provider quotes, and historical costs and then
multiplies this rate by the quantity of the resource?Which of the
following is a cost estimation method that takes cost per person-hour,
square meter or foot from provider quotes and historical costs and
then multiplies this rate by the quantity of the resource?
,Give this one a try later!
Parametric modeling Additive method
Solid modeling Digital sculpting
Don't know?
2 of 147
Term
What is true of quality management?
Give this one a try later!
If costs need to be reduced,
quality management ensures
Quality management focuses solely
that grade is reduced if
on increasing costs.
approved as a scope change
but quality is maintained.
Quality management has no impact Quality management is only
on project outcomes. concerned with quantity, not quality.
Don't know?
3 of 147
,Term
What is done after defining a project's purpose and could be
accomplished using a tool such as the project triangle?
Give this one a try later!
Planned iteration. Test the purpose for feasibility.
Incomplete work on the site is Keep the contract open and provide
acceptable if they are areas prepared a letter indicating the unmet criteria
for owner-furnished items. and required actions.
Don't know?
4 of 147
Term
Which scheduling methods are for activities NOT concurrently
performed?
Give this one a try later!
Construction management Multiple prime contracts approach
Location of remote workers
, Traditional waterfall model
scheduling
Don't know?
5 of 147
Term
An owner suggests an alternative material be used in a project. What
would this request involve?
Give this one a try later!
Construction change directive Scope of work
Amendment Change order
Don't know?
6 of 147
Term
What does a project manager need to be successful?
Give this one a try later!
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
√ Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper TheAlphanurse. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €17,57. Je zit daarna nergens aan vast.