100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
Eerder door jou gezocht
UA FOREMAN TEST 2024 / UA LOCAL 469 FOREMAN CERTIFICATION TEST 2024/2025 WITH 300 REAL EXAM PRACTICE QUESTIONS WITH CORRECT ANSWERS (NEWEST!)€25,71
In winkelwagen
ua foreman test 2024 practice questions and answer
Geschreven voor
UA FOREMAN / UA LOCAL 469 FOREMAN CERTIFICATION
UA FOREMAN / UA LOCAL 469 FOREMAN CERTIFICATION
Verkoper
Volgen
muriithikelvin098
Ontvangen beoordelingen
Voorbeeld van de inhoud
UA FOREMAN TEST 2024 / UA LOCAL
469 FOREMAN CERTIFICATION TEST
2024/2025 WITH 300 REAL EXAM
PRACTICE QUESTIONS WITH
CORRECT ANSWERS (NEWEST!)
As a foreman, what should ALWAYS be your FIRST priority when planning for a
job? - ANSWER-Ensuring the safety of your crew and others on the jobsite.
What percent of the UA will be eligible to retire before 2027? - ANSWER-55%
As a general rule, when is the BEST time for a foreman to schedule effective
meetings with their work crew? - ANSWER-At the beginning of a shift
You and your crew of three journeymen started a job on Thursday and finished the
job on the following Tuesday. No work was completed on Sunday. The first day
you and your crew worked 10 hours. On all other days you and your crew worked
8 hours each day. Assume that all hours worked in excess of 8 hours are counted as
overtime and that all overtime is counted as time-and-a-half. What is the total
number of hours paid? - ANSWER-188 hours paid
There are guidelines for installing the correct size of septic tank. Septic tanks shall
have a minimum size of 1,500 gallons. If a larger size is required by local
authorities, the contractor shall comply with local codes but allow in his or her bid
for the cost associated with such increase in size. According to the paragraph
above, who is responsible for installing the correct sized septic tank? - ANSWER-
Contractor.
pg. 1
,Which of the following provides the BEST example of prefabrication? -
ANSWER-To create a product in the shop and install it in the field.
A crew member gets metal shavings in their eye and a flushing of the eye fails to
help. What is the FIRST thing that you, as a foreman, should do? - ANSWER-
Have the crew member taken to receive immediate medical attention.
If a foreman from a different trade approaches you claiming that one of your crew
members has been injured while working outside of his scope of work, what would
be the FIRST action you should take? - ANSWER-Get the crew member medical
attention.
In which of the following documents may be found the most complete listing of
hazardous chemicals that might be encountered on the jobsite? - ANSWER-
American National Standards Institute hazardous substances appendix
Which statement about conflict is NOT true? - ANSWER-Conflict must always be
resolved.
What standard is applied with respect to the abuse of substances on the jobsite? -
ANSWER-A zero tolerance policy has been established by the United Associations
and it is applied to all locals.
Which of the following is a true statement with respect to a foreman 's
responsibility related to his or her crew? - ANSWER-The foreman is responsible
for anything that occurs at the jobsite from the beginning of the work day/shift to
the end of the work day/shift.
Why is preparation so important in a negotiation? - ANSWER-Having time to
prepare and having a plan makes it easier to keep emotions in check.
pg. 2
,The piping specifications required all wall penetrations to have a steel pipe
sleeve.The steam piping size is 4 inches SCH 80 carbon steel with 1 inch of
fiberglass insulation. What diameter of SCH 40 carbon steel sleeve is the minimum
that you can use? - ANSWER-8 inches
A member of your crew is being excessively loud and using inappropriate
language. As a foreman, what is the MOST effective course of action to take? -
ANSWER-Explain to them that their behavior is inappropriate and may be
considered harassment by fellow crew members and by management
What is the purpose of a separation notice? - ANSWER-The purpose of a
separation notice is to identify the circumstances surrounding a termination.
With which of the following costs should a foreman be MOST concerned? -
ANSWER-Labor
A(n) ________________ occurs when any condition or document modifies the
work as defined in the contract documents during the bidding process. -
ANSWER-Change Order
On a project that requires 100% tie-off for elevated work, how many lanyards are
required on a full body harness? - ANSWER-2
The client is not happy with part of the project and wants to make a change. What
actions should you take to ensure the client is happy while ensuring that progress
on your job continues? - ANSWER-Stop working on that portion of the job that is
at issue and contact your supervisor.
pg. 3
, Using drawing, what is the elevation of the top of the 24 x 18 duct? - ANSWER-31
feet and 10 inches.
On the project blueprint there is a bank of four pipe runs with each pipe measuring
three inches in diameter which measure 12 inches in length on the blueprint. The
scale used on the blueprint is 1/4 inch equals 1 foot. How many feet of 3 inch pipe
should be ordered to complete the runs? - ANSWER-192 feet
Using the formula below, what is the correct 45 offset when you have a rolling
offset where the roll is 8 inches and the rise is 6 inches? Formula: Offset = roll 2 +
rise2 - ANSWER-10 inches.
What is the first rule of negotiation? - ANSWER-Understand the other person's
needs.
Assume that you need to purchase 1,000 feet of pipe for your assigned project. If
pipe costs $1.25 per foot, what is the cost of purchasing 40% of the total pipe
needed? - ANSWER-$500
Which of the following describes the purpose of "Short Interval Planning? " or
"Look Ahead Planning"? - ANSWER-Breaking the job into small manageable
pieces.
Which of the following correctly identifies what is included in legitimate labor
costs? - ANSWER-Hourly wages, fringe benefit packages, payroll taxes, insurance
and safety costs,and small tools and consumables.
Calculate the number of hangers needed to support 275 feet of pipe if you need a
hanger placed every 8 feet? - ANSWER-35 hangers
pg. 4
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
√ Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper muriithikelvin098. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €25,71. Je zit daarna nergens aan vast.