100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
Construction & Evaluation: ARE 5.0 Questions and Answers 100% Pass €11,41
In winkelwagen

Tentamen (uitwerkingen)

Construction & Evaluation: ARE 5.0 Questions and Answers 100% Pass

 0 keer verkocht
  • Vak
  • Construction & Evaluation: ARE 5.0
  • Instelling
  • Construction & Evaluation: ARE 5.0

Construction & Evaluation: ARE 5.0 Questions and Answers 100% Pass What is the primary purpose of a punch list in construction? - A) To document final payment details - B) To outline additional work after project completion - C) To list items needing correction before project completion - D...

[Meer zien]

Voorbeeld 4 van de 57  pagina's

  • 6 september 2024
  • 57
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • Construction & Evaluation: ARE 5.0
  • Construction & Evaluation: ARE 5.0
avatar-seller
Construction & Evaluation: ARE 5.0
Questions and Answers 100% Pass

What is the primary purpose of a punch list in construction?

- A) To document final payment details

- B) To outline additional work after project completion

- C) To list items needing correction before project completion

- D) To schedule regular inspections


✔✔ C) To list items needing correction before project completion




Which document provides a detailed description of the materials and workmanship required for a

construction project?

- A) Project schedule

- B) Scope of work

- C) Specifications

- D) Construction contract


✔✔ C) Specifications




What is the main focus of a construction project’s evaluation phase?

1

,- A) Designing the project

- B) Monitoring construction progress

- C) Assessing project performance and quality

- D) Developing budget estimates


✔✔ C) Assessing project performance and quality




What does a construction change order typically address?

- A) Revisions to the original contract due to changes in scope

- B) Dispute resolutions between contractor and client

- C) New permits required for construction

- D) Final inspection results


✔✔ A) Revisions to the original contract due to changes in scope




What is the purpose of a construction submittal?

- A) To finalize project designs

- B) To obtain client approval for materials and methods

- C) To request additional funding

- D) To schedule inspections


2

,✔✔ B) To obtain client approval for materials and methods




What role does a contractor play in project evaluations?

- A) Designing the project

- B) Conducting final inspections

- C) Implementing the project and ensuring compliance with specifications

- D) Issuing building permits


✔✔ C) Implementing the project and ensuring compliance with specifications




What should be included in a project’s final inspection report?

- A) Design modifications

- B) Budget changes

- C) List of completed work and any deficiencies

- D) Schedule of upcoming tasks


✔✔ C) List of completed work and any deficiencies




Which document is used to track the performance and quality of work throughout the

construction phase?


3

, - A) Change order

- B) Daily log

- C) Project manual

- D) Building permit


✔✔ B) Daily log




What is typically the focus of post-construction evaluations?

- A) Reviewing initial project bids

- B) Analyzing client feedback and project outcomes

- C) Planning future projects

- D) Conducting preliminary design studies


✔✔ B) Analyzing client feedback and project outcomes




When should a contractor issue a notice of substantial completion?

- A) At the start of the project

- B) During the design phase

- C) When the project is substantially completed but not yet fully finished

- D) After receiving final payment


4

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, Bancontact of creditcard en je bent klaar. Geen abonnement nodig.

Focus op de essentie

Focus op de essentie

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BrilliantScores. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €11,41. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 69484 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


€11,41
  • (0)
In winkelwagen
Toegevoegd