Define Project Management - Answer- a discipline, a set method, theories and techniques that have evolved to manage the complexities of work that is unique & temporary
5 project success factors - Answer- 1) Agreement of a product team, custom...
Define Project Management - Answer- a discipline, a set method, theories and
techniques that have evolved to manage the complexities of work that is unique &
temporary
5 project success factors - Answer- 1) Agreement of a product team, customer and
management of the goals
2) A plan showing overall path and a clear responsibility which can be used to measure
progress
3) Constant, effective communication among everyone involved
4) Controlled Scope
5) management Support
Project vs On-going operation - Answer- Project - work that is done on time, has a
beginning and end. Produces unique product
On-going Operations - no end point specified. Producing similar often identical products
Identify 3 overarching skill areas in which a project manager must be knowledgable -
Answer- 1) Project Management
2) Business Management
3) Technical Skills
Define Project Success - Answer- Cost, Schedule and Performance
Office Functional Disciplines - Answer- System EN, CO, PM, FM, LG, Test
Define Work Breakdown Structure - Answer- A tool used to break a project down into
manageable pieces of work. Deliverable oriented
Steps:
1) what are your major deliverables
2) identify all tasks required
3) Organize the WBS
, Explain how a WBS clarifies and provides necessary details for project management
activities - Answer- Helps to:
- provide a detailed illustration of project scope
- Monitor progress
- Helps provide accurate cost and schedule (not a schedule, helps build one)
- Build your project team
- serves as the foundation for your project plan
Summary Task vs Work Package - Answer- Summary Tasks has branches underneath.
(no work)
Work Packages have work associated with them
Explain the considerations in determining how far to extend a WBS branch - Answer-
3rd or 4th level (don't do contractors work)
8/80 rule
Importance of Critical Path and Slack/Float - Answer- Critical Path - Events that directly
affect the schedule. (have zero slack)
Slack - can slip without affecting the schedule.
Identify the planning steps involved with developing a project schedule - Answer- 1)
Build a WBS - identify activities and develop the precedence relationships associated
2) Identify task relationships - construct a diagram
3) Estimate activity durations
- Parametric - find some parameter that relates to schedule
- Expert opinion
- Analogy - find a similar system and relate
4) Calculate initial schedule via CPM
5) Assign and Level Resources
Critical Path Method - Answer-
Program Evaluation and Review Technique (PERT) vs Monte Carlo - Answer- PERT -
Only looks at Critical Path, uses statistics and a normal distribution, More Optimistic
Monte Carlo - Considers all paths through a network, Computer generates random
number for durations, More robust
Identify Ways for balancing a project at the project level - Answer- Triple constraint
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
√ Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Scholarsstudyguide. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €11,83. Je zit daarna nergens aan vast.