100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
P370 PRACTICE TEST QUESTIONS WITH REVISED AND UPDATED ANSWERS GRADED A+ €12,12   In winkelwagen

Tentamen (uitwerkingen)

P370 PRACTICE TEST QUESTIONS WITH REVISED AND UPDATED ANSWERS GRADED A+

 5 keer bekeken  0 keer verkocht
  • Vak
  • P370 PRACTICE
  • Instelling
  • P370 PRACTICE

P370 PRACTICE TEST QUESTIONS WITH REVISED AND UPDATED ANSWERS GRADED A+ The heart of Operations Management is the management of production systems. A production system uses to provide goods and services to the customer. a. Production, Workforce, Inventory b. Start-up, Alteration, Output c...

[Meer zien]

Voorbeeld 2 van de 9  pagina's

  • 28 september 2024
  • 9
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • P370 PRACTICE
  • P370 PRACTICE
avatar-seller
P370 PRACTICE TEST QUESTIONS
WITH REVISED AND UPDATED
ANSWERS GRADED A+
The heart of Operations Management is the management of production systems. A
production system uses to provide goods and services to the customer.

a. Production, Workforce, Inventory
b. Start-up, Alteration, Output
c. Input, Transformation, Output
d. Set-up, Conversion, Yield
e. Capacity, Sequencing, Efficiency - Answer-c. Input, Transformation, Output

Productivity increases when:

a. Inputs increase while outputs remain the same.
b. Inputs decrease while outputs remain the same.
c. Outputs decrease while inputs remain the same.
d. Inputs and outputs increase proportionately.
e. None of the answers are correct. - Answer-b. Inputs decrease while outputs remain
the same.

Which of the following factories is the most productive?

a. Factory V1, which uses 43 units of input to produce 38 units of output
b. Factory W15, which uses 28 units of input to produce 27 units of output
c. Factory X3A, which uses 57 units of input to produce 58 units of output
d. Factory Y3, which uses 120 units of input to produce 110 units of output
e. Factory ZZ3, which uses 260 units of input to produce 240 units of output - Answer-c.
Factory X3A, which uses 57 units of input to produce 58 units of output

Suppose we are using the CPM with three time estimates (PERT) to schedule a project.
What is the variance of the length of the critical path, if there is a 92.22% probability that
the project will be completed within the expected duration plus three time periods?
Select the nearest correct answer. (HINT: Use the Z formula to find the value)

a. 1.67
b. 2.34
c. 2.96
d. 3.19
e. 4.46 - Answer-e. 4.46

, z=Norm.s.inv(92.22)

standard dev=3(time estimates)/z

variance=standard deviation^2

As project manager, it is important to deal with the people issues as well as scheduling.
Which of the following project organizational structure would require your time and
attention to handle team members' frustration in dealing with two bosses?

a. Pure project structure
b. Matrix project structure
c. Functional project structure
d. Hierarchical project structure
e. Both A and B are acceptable project structures - Answer-b. Matrix project structure

A project has three sequences of activities (paths), two of which are critical. The critical
paths of this project can be characterized in the following way:

a. The slack times for each task in the entire project are zero.
b. The chain of activities (from start to finish) that has the largest sum of activity
durations.
c. The early start date and early finish date are always the same for each activity on the
critical path.
d. To reduce the project duration, you must reduce the slack time of a task on the
critical path.
e. None of the above are correct. - Answer-b. The chain of activities (from start to finish)
that has the largest sum of activity durations.

As Project Manager, it is important to deal with the people issues as well as scheduling.
which of the following would NOT require your time and attention?

a. In a functional project structure, possibly negotiating with the departments for the
people you need.
b. Intentional delaying of a project as the completion date draws near, by people on the
project as their means of resisting change.
c. In a functional structure, resistance of team members to working on tasks outside
their area of expertise.
d. In pure project structure, the team member's frustration in dealing with two bosses.
e. Motivating team members, especially in a functional structure. - Answer-d. In pure
project structure, the team member's frustration in dealing with two bosses.

A project has a critical path with a duration of 20 weeks and a standard deviation of 4
weeks. There is a 35% chance the project will be completed in X weeks or less. What is
X? Select the closest answer.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

√  	Verzekerd van kwaliteit door reviews

√ Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, Bancontact of creditcard voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Perfectscorer. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €12,12. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 85443 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€12,12
  • (0)
  Kopen