100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Unit 9: IT Project Management - Assignment 1 - (Learning Aim A) (All Criterias Met) €10,52   In winkelwagen

Essay

Unit 9: IT Project Management - Assignment 1 - (Learning Aim A) (All Criterias Met)

4 beoordelingen
 279 keer bekeken  14 keer verkocht
  • Vak
  • Instelling

This essay is a distinction-level work for Unit 9: IT Project Management - Assignment 1 - Learning Aim A. You can efficiently work on your assignment by following my layout. in order to achieve the best grade (Distinction). All of the following criteria is met in this document ‣P1 - Explain, ...

[Meer zien]

Voorbeeld 3 van de 11  pagina's

  • 12 februari 2023
  • 11
  • 2022/2023
  • Essay
  • Onbekend
  • A+

4  beoordelingen

review-writer-avatar

Door: sufyanzaheer642 • 3 weken geleden

review-writer-avatar

Door: abdulmajidmohamed • 4 maanden geleden

review-writer-avatar

Door: Kidlaroi1234 • 6 maanden geleden

Best Document Ever!

review-writer-avatar

Door: qadarinn29 • 7 maanden geleden

reply-writer-avatar

Door: Afsar08 • 7 maanden geleden

Thanks for your review happy the document was helpful good luck

avatar-seller
Unit 9 – IT Project Management (Part A)



Contents
Introduction:......................................................................................................................................2
Project Management Methodologies:...............................................................................................2
Waterfall............................................................................................................................................2
The principles of waterfall model are:...............................................................................................2
Rapid Application Development (RAD)..............................................................................................3
The principles of the RAD methodology are:.....................................................................................3
PRINCE2.............................................................................................................................................4
The principles of the PRINCE2 methodology are:..............................................................................4
Agile...................................................................................................................................................5
The principles of the Agile methodology are:....................................................................................6
The Ford Edsel (Failed Project) – Agile...............................................................................................6
The car industry in 1950s...................................................................................................................7
Why did Ford Edsel fail?....................................................................................................................7
How would the Ford Edsel have been successful?.............................................................................7
PlayStation 2 (Successful Project) – PRINCE2.....................................................................................7
How did the PlayStation 2 use PRINCE2 and how did it help make the project a success?...............8
Why was the PlayStation 2 a success?...............................................................................................8
Sony Betamax (Failed Project) – Agile................................................................................................8
Videotape format industry in early 1970...........................................................................................9
Why did Sony Betamax fail?..............................................................................................................9
How would the Sony Betamax have been successful?.......................................................................9
Conclusion:......................................................................................................................................10
Evaluation:.......................................................................................................................................10
Bibliography:....................................................................................................................................10




Learning Aim A: Investigate the principles and methodologies of IT
project management as used in industry
1|Page

, Unit 9 – IT Project Management (Part A)




Introduction:
In this assignment, I will be investigating different IT project management methodologies
that the company can use. I'll assess three different projects, each of which was completed
utilising a different project management methodology, such as PRINCE2, RAD, Waterfall, or
Agile. This will provide an understanding of the methodologies, the phases, and the
advantages and disadvantages of each methodology.



Project Management Methodologies:
Waterfall
The waterfall model is a prominent software engineering and product development
approach that takes a linear, sequential approach to the software development life cycle
(SDLC). The waterfall approach emphasises a logical step-by-step process. Each phase starts
only when the old phase finishes. The Waterfall approach is the most common method for
project management, with group members operating in a linear fashion toward a common
overall aim.
The waterfall model has the advantage of clearly and properly stating the requirements, as
well as providing easy control and transparency for the client due to a strict reporting
system. One of the disadvantages of this waterfall model is that after a task is completed, it
is difficult to go back and make modifications to it. When the project has already been
integrated, it is tough to go back and locate the source of the problem.




The principles of waterfall model are:
1. Analysis - This is when the requirements are investigated in greater depth, and they
are documented in a work document. This is the most critical stage of the project,
and it is likely that success or failure will be determined here.

2|Page

, Unit 9 – IT Project Management (Part A)


2. Design - This phase helps identify system requirements and plan the system's
architecture, as well as develop the design for the project. Instead of coding,
guidelines for how the task should be accomplished are established.
3. Implementation - This is where the product is made. It is necessary to develop the
system in units and to code it in order for it to function. There should be no need to
pause to reflect.
4. Testing - After the system's coding is finished, it is tested to look for any faults that
may occur so that they may address them before delivering the system. This is to
emphasise iterative processes, which reflect, and change work based on a brief burst
of activity followed by testing.
5. Maintenance - This phase focuses on developing fixes and upgrades to address any
code issues. If any faults are discovered during testing, the development team will be
required to enhance the product within a certain time frame in order for it to be
more effective.



Rapid Application Development (RAD)
RAD is a sort of agile methodology that emphasises rapid prototype deliveries. The RAD
Model, also known as the Rapid Application Development Model, it is a software
development approach that is built on prototyping with no particular planning. In the RAD
model, less emphasis is placed on planning and more emphasis is placed on development
activities. It aims to create software in a short period of time.
Advantages of this models are, it is flexible an adaptable to changes, less people can be
productive in a short time, the overall project risks can be reduced. Disadvantages of this
model are it only can be used for big projects, not all kind of applications are compatible
with RAD and when technical risk is high it is not suitable.




The principles of the RAD methodology are:
1. Planning the Requirements - This stage is similar to a project scoping meeting.
Although the planning phase is shorter than in other project management


3|Page

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Afsar08. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €10,52. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 78075 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€10,52  14x  verkocht
  • (4)
  Kopen