DBIA TEST QUESTIONS AND ANSWERS
Project Delivery System - Answer-How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method - Answer-how team members are selected (QBS, best value, low price, sole source) contracting approach - Answer-how team members are paid (fp, gmp, cost reimbursement, target price, unit price) Design-Bid-Build (DBB) - Answer-linear, sequential process, A/E selected on qualifications, GC selected on low price, design is fully completed without input from GC, A/E acting in owner's interests, with a historically strong bond, process is well-established and understood construction manager at risk - Answer-similar org structure to DBB, construction manager selected by QBS or best value, contractor provides precon services, negotiated gmp contracting approach, open book estimating process, potential to fast track project, construction cost determined before design completed, potential issues over what is reasonably inferable from gmp design documents Design-Build - Answer-The owner contracts with one entity (a person or firm) to provide both design and construction services, designer and contractor have a direct contractual relations
Geschreven voor
- Instelling
- DBIA
- Vak
- DBIA
Documentinformatie
- Geüpload op
- 7 mei 2024
- Aantal pagina's
- 10
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
dbia test questions and answers