National Defense University
Latest uploads at National Defense University. Looking for notes at National Defense University? We have lots of notes, study guides and study notes available for your school.
-
666
- 0
-
45
All courses for National Defense University
- CLC 013 1
- CLC 056 ANALYZING CONTRACT COSTS CLC 056 ANALYZING CONTRACT COSTS (CLC056) 9
- CLC 056 Analyzing Contract Costs Exam CLC 056 Analyzing Contract Costs Exam (CLC056) 7
- CLC 058 1
- CLC 222 5
- CLC 222 Training CLC 222 1
- CLC 222 Mod 3 Contract Management Exam. CLC 222 Mod 3 Contract Management Exam. 1
- CLC 222 Mod 6 Special Considerations Exam 19
- CLG 001 15
- CLM 059 6
- CON 121 1
- CON 124 1
- CON 127 1
- CON 290 CON290 15
- CON 290 Quiz Question Pool – Week 1 CON290 3
- CON 290 Quiz Question Pool – Week 2 CON290 3
- CON290 Week 1 Test 1 CON290 1
- CON290_20017 > Defense Acquisition University CON290/ CON 290 Exam CON290 1
Latest notes & summaries National Defense University
Defence Acquisition University CLC 106 COR with a Mission Focus DAU | 100% Correct Answers
CLC 046-DoD Sustainable Procurement Program Latest Questions And Answers. 1) Which one of the following is not considered an alternative fuel? (a) Electric (b) Hydrogen (c) Coal (d) Compressed Natural Gas 2) Under the Sustainable Procurement Program, ALL computers and monitors must have ENERGY STAR features enabled (a) True (b) False 3) Which of the following is NOT a benefit of DoD's Sustainable Procurement Program? (a) Increased use of fossil fuels (b) Reduced use of natural resources (c) Imp...
CLG 0010 Exam 100% Scored_ Spring 2022
CLG 0010 Exam 100% Scored_ Spring 2022
ACQ 1010 MODULE 2 EXAM: JOINT CAPABILITIES INTEGRATION AND DEVELOPMENT SYSTEM 
Assuring that material approaches are refined and key technologies are being matured, 
what JCIDS document is used to build upon the Initial Capabilities Document (ICD)? 
Answer: Capability Development Document (CDD) 
What is the purpose of a Capabilities Based-Assessment (CBA)? 
Answer: To analyze the military's capability needs and gaps and recommend both materiel and non-materiel solutions
ACQ 1010 MODULE 3 EXAM: DEFENSE ACQUISITION SYSTEM 
What decision authorizes entry into the Production and Deployment phase? 
Answer: Milestone C decision 
Before a project enters the TMRR phase, the AoA must be completed and the Acquisition 
Strategy (AS) is approved by the MDA. 
Answer: True 
The Acquisition Strategy (AS) is: 
Answer: Prepared by the Program Manager (PM) during the Materiel Solution Analysis Phase (MSA) and is submitted 
to the Milestone Decision Authority (MDA) at Milestone A...
ACQ 1010 MODULE 6 EXAM: CONTRACT MANAGEMENT 
What is one purpose of contract administration? 
Answer: Avoiding or eliminating overlap and duplication of Government contract administration effort 
Which of the following describes an Indefinite-Quantity contract? 
Answer: Provides an indefinite quantity, within stated limits, of supplies or services to be furnished during a fixed 
period, within stated limits 
Who oversees the source selection process and selects the source whose proposal is 
the ...
ACQ 1010 MODULE 5 EXAM: FINANCIAL MANAGEMENT 
Below Threshold Reprogramming for procurement is limited to the lesser of $20 million 
or 20%, into or out of a program. Thresholds vary by appropriations category. 
Incorrect Answer: True 
Approval for reprogramming must always involve Congress. 
Incorrect Answer: True 
Which major appropriations category below is NOT included in the Life Cycle Cost 
Estimate? 
Answer: Investment 
Select the term that best fits the following definition: “The legal...
ACQ 1010 MODULE 7 EXAM: ENGINEERING DISCIPLINES 
Which systems engineering supporting discipline has the goal to compare a system or 
components against requirements and specifications? 
Answer: test and evaluation 
The item detail specification, in combination with associated drawings, parts lists, 
process specs, and material specs, are together often referred to as the Technical Data 
Package (TDP). 
Answer: True 
In which phase are systems-level requirements stabilized and detailed designs 
...
ACQ 1010 MODULE 8 EXAM: TEST AND EVALUATION OVERVIEW 
The Test and Evaluation Master Plan (TEMP) must be developed prior to which of the 
following? 
Answer: Milestone A and updated before each subsequent review 
Test and Evaluation (T&E) is used to identify technical risk, verify performance, and 
validate system utility throughout the defense system acquisition life cycle